My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 30 00 - 8 Administrative Requirements <br />2. Deferred approval drawings and specifications become part of the approved <br />submittal documents for the Project when they are submitted to and approved by <br />Division of the State Architect. <br />3. Submit four prints of each drawing. Drawings shall include empty 7” by 9” space <br />on first sheet reserved for Architect to add “General Conformance Block” <br />required for DSA. <br />4. Submit four copies of calculations, product data and test reports. <br />5. Identify and specify supports, fasteners, spacing, penetrations, etc., for each <br />deferred approval items, including calculations for each fastener. <br />6. Submit documents to Architect of Record for review. <br />7. Deferred submittal documents shall bear stamp and signature of architect or <br />engineer licensed in State of California and responsible for work shown on <br />deferred submittal documents. <br />8. Architect of Record will forward submittal to appropriate Project Engineer. <br />9. Review of Project Architect or Engineer of Record is for conformance with design <br />concept shown on Contract Documents. Neither Architect or Engineer of Project <br />shall be responsible for review for correctness of deferred approval items. <br />10. After review by Architect/Engineer of Record, Architect of Record will forward two <br />copies of submittal to Division of the State Architect for approval. <br />11. Respond to review comments made by Division of the State Architect and revise <br />and resubmit submittal for final approval. <br />12. Architect of Record will forward two copies of final revised submittal to the <br />Division of the State Architect for approval. <br />13. The Division of the State Architect will return one copy of final submittal to the <br />Architect of Record. <br />14. Architect of Record will forward one copy of evidence of submittal approval by <br />Division of the State Architect for final distribution by General Contractor. <br />END OF SECTION <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.