My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 31 00 - 2 Project Management and Coordination <br />D. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated; <br />coordinate locations of fixtures and outlets with finish elements. <br />E. Administrative Procedures: Coordinate scheduling and timing of administrative <br />procedures with other construction activities and activities of other contractors to <br />avoid conflicts and ensure orderly progress of Work. <br />1.3 SUBMITTALS <br />A. Coordination Drawings: Prepare Coordination Drawings for areas where space <br />availability is limited and necessitates maximum utilization of space for components <br />and where separate entities, products, and materials require coordination. <br />1. Require each subcontractor with items located in ceiling space to furnish <br />coordination drawings of their items to assist in preparation of Contractor’s <br />Coordination Drawings. <br />2. Indicate relationship of components shown on separate Shop Drawings. <br />3. Indicate required installation sequences. <br />4. Ceiling Spaces: Take special care to coordinate structure, ceiling systems, <br />equipment located in ceiling spaces, fire protection systems, mechanical <br />systems, and electrical systems. <br />B. Staff Names: Immediately after receipt of notice to proceed or immediately after signing <br />of Contract by Owner and Contractor, submit list of principal staff assignments, including <br />superintendent and other personnel in attendance at Project site. <br />1. Post copies of list in Project meeting room, in temporary field office, and by each <br />temporary telephone. <br />1.4 SUPERVISORY AND ADMINISTRATIVE PERSONNEL <br />A. Provide supervisory personnel, in addition to Project Superintendent, as required for <br />proper and timely performance of Work and coordination of subcontracts. <br />B. Provide administrative staff as required to allow Project Superintendent and supervisory <br />personnel to allocate maximum time to Project supervision and coordination. <br />1.5 PROJECT MEETINGS <br />A. Schedule and administer Project meetings throughout progress of Work: <br />1. Pre-construction meeting. <br />2. Progress meetings at weekly intervals. <br />3. Pre-installation conferences. <br />4. Coordination meetings. <br />5. Special meetings. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.