My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 31 00 - 1 Project Management and Coordination <br />SECTION 01 31 00 <br />PROJECT MANAGEMENT AND COORDINATION <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: Description of Project management and coordination including but <br />not necessarily limited to the following: <br />1. General Project coordination procedures. <br />2. Coordination drawings. <br />3. Staff names. <br />4. Administrative and supervisory personnel. <br />5. Project meetings. <br />B. Related Sections: <br />1. Section 01 30 00: Administrative requirements. <br />2. Section 01 79 00: Demonstration and training. <br />1.2 COORDINATION <br />A. Coordination: Coordinate construction operations included in various Specifications <br />sections to ensure efficient and orderly installation of each part of Work. <br />1. Coordinate construction operations that depend on each other for proper <br />installation, connection, and operation. <br />2. Coordinate work to assure efficient and orderly sequence of installation of <br />construction elements. <br />3. Make provisions for accommodating items installed by Owner or under separate <br />contracts. <br />B. Prepare memoranda for distribution to each party involved as needed, outlining <br />special procedures required for coordination. <br />1. Include required notices, reports, and list of attendees at meetings; include <br />Architect and Owner in distribution. <br />C. Verify characteristics of interrelated operating equipment are compatible; coordinate <br />work having interdependent responsibilities for installing, connection to, and placing <br />such equipment in service. Coordinate space requirements and installation of <br />mechanical and electrical work indicated diagrammatically on Drawings. <br />1. Follow routing shown for pipes, ducts, and conduits as closely as possible; make <br />runs parallel with lines of building. <br />2. Utilize spaces efficiently to maximize accessibility for other installations, for <br />maintenance, and for repairs. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.