My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> 01 32 10 - 2 Construction Schedule – Bar Chart <br />B. Ensure coordination of Contractor and subcontractors at all levels. <br />C. Ensure coordination of submittals, fabrication, delivery, erection, installation, and testing <br />of materials and equipment. <br />D. Ensure on-time delivery of Owner furnished materials and equipment. <br />E. Ensure coordination of jurisdictional reviews. <br />F. Assist in preparation and evaluation of applications for payment. <br />G. Assist in monitoring progress of work. <br />H. Assist in evaluation of proposed changes to Contract Time. <br />I. Assist in evaluation of proposed changes to Construction Schedule. <br />J. Assist in detection of schedule delays and identification of corrective actions. <br />1.4 QUALIFICATIONS <br />A. Scheduler: Personnel with 3 years minimum experience in scheduling construction work <br />of a complexity and size comparable to this Project. <br />B. Administrative Personnel: 3 years minimum experience in using and monitoring <br />schedules on comparable projects. <br />1.5 QUALITY ASSURANCE <br />A. Perform work in accordance with Construction Planning and Scheduling Manual <br />published by the AGC. <br />B. In the event of discrepancy between the AGC publication and this section, provisions of <br />this section shall govern. <br />1.6 PROJECT RECORD DOCUMENTS <br />A. Submit record documents under provisions of Section 01 77 00. <br />B. Submit one reproducible and two copies of final Record Construction Schedule which <br />reflects actual construction of this Project. <br />C. Record schedule shall be certified for compliance with actual way project was <br />constructed. <br />D. Receipt of Record Construction Schedule shall be a condition precedent to any <br />retainage release or final payment. <br />1.7 SUBMITTALS <br />A. Within 7 days from the Notice of Award submit proposed Early Work Schedule and <br />preliminary Cost Report defining activities for first 60 days of Work. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.