My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 35 15 - 1 CALGreen Environmental Requirements <br />SECTION 01 35 15 <br />CALGREEN ENVIRONMENTAL REQUIREMENTS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: Comply with CALGreen environmental requirements related to <br />energy efficiency, water efficiency and conservation, material conservation and <br />resource efficiency, and environmental quality. <br />1. Comply with specific CALGreen requirements as adopted by authorities having <br />jurisdiction and applicable to Project. <br />1.2 ENVIRONMENTAL REQUIREMENTS <br />A. Mandatory Measures: Comply with CALGreen Mandatory Measures applicable to <br />Project. <br />1. Design team and construction team are each required to participate to maximum <br />degree possible to achieve CALGreen environmental requirements. <br />2. Contract Documents are not intended to limit alternative means of achieving <br />environmental requirements. <br />a. Suggestions from Contractor, subcontractors, suppliers, and manufacturers <br />for achieving environmental requirements are encouraged; team approach is <br />also encouraged. <br />3. Voluntary Tiers: Verify extent of Voluntary Tiers applicability to Project. <br />a. Construction team is encouraged to work with Owner and Design Team to <br />incorporate additional measures as defined in CALGreen Appendixes. <br />b. Contact Owner and Architect regarding extent of intent of Project to reach <br />Voluntary Tiers, additional work necessary to achieve enhanced Voluntary <br />Tiers, and potential costs involved in achieving each Voluntary Tier. <br />c. Construction team is required to achieve Mandatory Measures and Voluntary <br />Tiers as applicable, and to achieve as much as possible without <br />unacceptable cost impact or schedule impact as determined by Owner. <br />B. Requirements: Construction team is required to review CALGreen requirements <br />relative to Project related to following. <br />1. Energy Efficiency: Comply with California Energy Commission requirements. <br />2. Water Efficiency and Conservation: Comply with requirements for both indoor <br />and outdoor water use. <br />3. Material Conservation and Resource Efficiency: <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.