Laserfiche WebLink
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 35 15 - 4 CALGreen Environmental Requirements <br />1. Experience: Environmental project manager to have experience relating to <br />CALGreen building construction. <br />2. Responsibilities: Carefully review Contract Documents for CALGreen issues, <br />coordinate work of trades, subcontractors, and suppliers; instruct workers relating <br />to environmental issues; and oversee Project Environmental Goals. <br />a. Submittals: Collect, compile, verify, and maintain sufficient information for <br />submittals indicating compliance with applicable CALGreen requirements. <br />3. Meetings: Discuss CALGreen Goals at following meetings. <br />a. Pre-construction meeting. <br />b. Pre-installation meetings. <br />c. Regularly scheduled job-site meetings. <br />B. CALGreen Issues Criteria: Comply with requirements listed in CALGreen and various <br />Specification sections. <br /> <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A. General Issues: Do not use materials with moisture stains or with signs of mold or <br />mildew. <br />1. Moisture Stains: Materials that have evidence of moisture damage, including <br />stains, are not acceptable, including both stored and installed materials; <br />immediately remove from site. <br />2. Mold and Mildew: Materials that have evidence of growth of molds or of mildew <br />are not acceptable, including both stored and installed materials; immediately <br />remove from site. <br />2.2 SUBSTITUTIONS <br />A. Substitutions Environmental Issues: Requests for substitutions shall comply with <br />requirements specified in Section 01 25 00 – Substitution Procedures, with following <br />additional information required where environmental issues are involved. <br />1. Indicate each proposed substitution complies with CALGreen requirements. <br />2. Owner and Architect reserve right to reject proposed substitutions where <br />CALGreen information is not provided and where substitution may impact <br />mandatory requirements or Project voluntary tier requirements. <br /> <br />505 E Central Ave <br />#B11/6/2024