My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 35 15 - 4 CALGreen Environmental Requirements <br />1. Experience: Environmental project manager to have experience relating to <br />CALGreen building construction. <br />2. Responsibilities: Carefully review Contract Documents for CALGreen issues, <br />coordinate work of trades, subcontractors, and suppliers; instruct workers relating <br />to environmental issues; and oversee Project Environmental Goals. <br />a. Submittals: Collect, compile, verify, and maintain sufficient information for <br />submittals indicating compliance with applicable CALGreen requirements. <br />3. Meetings: Discuss CALGreen Goals at following meetings. <br />a. Pre-construction meeting. <br />b. Pre-installation meetings. <br />c. Regularly scheduled job-site meetings. <br />B. CALGreen Issues Criteria: Comply with requirements listed in CALGreen and various <br />Specification sections. <br /> <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A. General Issues: Do not use materials with moisture stains or with signs of mold or <br />mildew. <br />1. Moisture Stains: Materials that have evidence of moisture damage, including <br />stains, are not acceptable, including both stored and installed materials; <br />immediately remove from site. <br />2. Mold and Mildew: Materials that have evidence of growth of molds or of mildew <br />are not acceptable, including both stored and installed materials; immediately <br />remove from site. <br />2.2 SUBSTITUTIONS <br />A. Substitutions Environmental Issues: Requests for substitutions shall comply with <br />requirements specified in Section 01 25 00 – Substitution Procedures, with following <br />additional information required where environmental issues are involved. <br />1. Indicate each proposed substitution complies with CALGreen requirements. <br />2. Owner and Architect reserve right to reject proposed substitutions where <br />CALGreen information is not provided and where substitution may impact <br />mandatory requirements or Project voluntary tier requirements. <br /> <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.