Laserfiche WebLink
400 Sunrise Ave., Suite 270 <br />Roseville, CA 95661 <br />916.755.3571 / MiTek-US.com <br />Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not <br />a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall <br />building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing <br />is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the <br />fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria and DSB-22 available from Truss Plate Institute (www.tpinst.org) <br />BCSI Building Component Safety Information <br />WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 1/2/2023 BEFORE USE. <br />and available from the Structural Building Component Association (www.sbcscomponents.com) <br />0.2512 <br />0.25 <br />12 <br />=2x6 <br />=4x5 <br />=4x6 <br />=3x4 <br />=4x8 <br />=3x4 <br />=4x8 <br />=6x16 <br />=5x6 <br />=6x8 <br />19121118 <br />10 <br />9 20 <br />8 <br />7 <br />13 <br />14 <br />1 2 15 3 <br />4 16 5 17 6 <br />0-3-12 <br />0-3-12 <br />0-5-8 <br />-0-5-8 <br />2-8-12 <br />3-0-8 <br />5-11-10 <br />9-0-2 <br />6-6-14 <br />15-7-0 <br />0-3-12 <br />15-1-8 <br />0-3-12 <br />0-3-12 <br />0-0-15 <br />3-3-4 <br />0-5-8 <br />15 -7-0 <br />2-10-8 <br />3-2-5 <br />5-8-14 <br />9-0-2 <br />5-9-10 <br />14-9-12 <br />2-10 <br />-8 <br />1-2-2 <br />2-1-4 <br />0-3-9 <br />1-7-10 <br />0-9-4 <br />1-2-14 <br />1-2-14 <br />1-7-10 <br />2-10 <br />-8 <br />Scale = 1:42.7 <br />Plate Offsets (X, Y):[3:0-6-0,0-2-8], [6:0-5-4,0-3-4] <br />Loading (psf)Spacing 2-0-0 CSI DEFL in (loc)l/defl L/d PLATES GRIP <br />TCLL (roof)20.0 Plate Grip DOL 1.25 TC 0.72 Vert(LL)-0.12 9-10 >999 360 MT20 220/195 <br />TCDL 14.0 Lumber DOL 1.25 BC 0.55 Vert(CT)-0.17 9-10 >876 240 <br />BCLL 0.0 *Rep Stress Incr NO WB 0.51 Horz(CT)0.01 14 n/a n/a <br />BCDL 7.0 Code IBC2021/TPI2014 Matrix-MSH Wind(LL)0.01 9 >999 240 Weight: 86 lb FT = 20% <br />LUMBER <br />TOP CHORD 2x4 DF No.2 G <br />BOT CHORD 2x4 DF No.2 G <br />WEBS 2x4 DF No.2 G or 2x4 DF Std G or 2x4 DF <br />Stud G <br />OTHERS 2x8 DF No.2 G <br />BRACING <br />TOP CHORD Structural wood sheathing directly applied or <br />6-0-0 oc purlins, except end verticals, and <br />2-0-0 oc purlins (5-10-4 max.): 3-10, 4-6. <br />BOT CHORD Rigid ceiling directly applied or 10-0-0 oc <br />bracing, Except: <br />6-0-0 oc bracing: 9-10. <br />REACTIONS (size)1=0-5-8, 10=0-5-8, 14=0-5-8 <br />Max Horiz 1=40 (LC 12) <br />Max Uplift 1=-9 (LC 12), 10=-26 (LC 8), <br />14=-19 (LC 9) <br />Max Grav 1=441 (LC 29), 10=747 (LC 45), <br />14=604 (LC 48) <br />FORCES (lb) - Maximum Compression/Maximum <br />Tension <br />TOP CHORD 1-2=-53/48, 2-3=-53/212, 3-10=-653/276, <br />3-4=-255/96, 4-5=-121/39, 5-6=-772/241, <br />8-13=0/439, 6-13=0/439 <br />BOT CHORD 11-12=0/0, 10-11=0/0, 9-10=-245/130, <br />8-9=-63/227, 7-8=0/0 <br />WEBS 5-9=-337/190, 6-9=-206/711, 2-11=-13/459, <br />3-5=-802/246, 2-10=-221/55, 3-9=-287/741, <br />6-14=-634/177 <br />NOTES <br />1)Unbalanced roof live loads have been considered for <br />this design. <br />2)Wind: ASCE 7-16; Vult=96mph (3-second gust) <br />Vasd=76mph; TCDL=8.4psf; BCDL=4.2psf; h=25ft; Cat. <br />II; Exp C; Enclosed; MWFRS (envelope) exterior zone <br />and C-C Corner (3) 0-2-12 to 15-3-4 zone; cantilever left <br />and right exposed ; end vertical left and right <br />exposed;C-C for members and forces & MWFRS for <br />reactions shown; Lumber DOL=1.60 plate grip <br />DOL=1.60 <br />3)Provide adequate drainage to prevent water ponding. <br />4)This truss has been designed for a 10.0 psf bottom <br />chord live load nonconcurrent with any other live loads. <br />5)* This truss has been designed for a live load of 20.0psf <br />on the bottom chord in all areas where a rectangle <br />3-06-00 tall by 2-00-00 wide will fit between the bottom <br />chord and any other members. <br />6)A plate rating reduction of 20% has been applied for the <br />green lumber members. <br />7)Bearings are assumed to be: Joint 1 DF No.2 crushing <br />capacity of 625 psi, Joint 10 DF No.2 crushing capacity <br />of 625 psi, Joint 14 DF No.2 crushing capacity of 625 <br />psi. <br />8)Bearing at joint(s) 14 considers parallel to grain value <br />using ANSI/TPI 1 angle to grain formula. Building <br />designer should verify capacity of bearing surface. <br />9)Provide mechanical connection (by others) of truss to <br />bearing plate capable of withstanding 9 lb uplift at joint <br />1, 26 lb uplift at joint 10 and 19 lb uplift at joint 14. <br />10)Beveled plate or shim required to provide full bearing <br />surface with truss chord at joint(s) 1. <br />11)This truss has been designed for a moving concentrated <br />load of 300.0lb live and 80.0lb dead located at all mid <br />panels and at all panel points along the Top Chord and <br />Bottom Chord, nonconcurrent with any other live loads. <br />12)Graphical purlin representation does not depict the size <br />or the orientation of the purlin along the top and/or <br />bottom chord. <br />13)This truss is designed for a creep factor of 2.01, which is <br />used to calculate the Vert(CT) deflection per ANSI/TPI 1. <br />The building designer shall verify that this parameter fits <br />with the intended use of this component. <br />LOAD CASE(S) Standard <br />1)Dead + Roof Live (balanced): Lumber Increase=1.25, <br />Plate Increase=1.25 <br />Uniform Loads (lb/ft) <br />Vert: 1-3=-68, 4-6=-68, 10-12=-30, 7-10=-14 <br />Job Truss Truss Type Qty Ply M39558- TOMS JR SANTA ANA <br />R80031758AC01Half Hip 1 1M39885- TOMS JR Job Reference (optional) <br />Builders FirstSource (Perris, CA), Perris, CA - 92570,Run: 8.63 S Nov 1 2023 Print: 8.630 S Nov 1 2023 MiTek Industries, Inc. Wed Dec 27 09:55:39 Page: 1 <br />ID:1BrjXtzfy6mK3jTKwOEehhyEnUr-RfC?PsB70Hq3NSgPqnL8w3uITXbGKWrCDoi7J4zJC?f <br />December 27,2023 <br />1430 E Edinger Ave <br />3/27/2025