1.THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND
<br />THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS AND THE
<br />EXACT NATURE AND EXTENT OF THE WORK TO BE PERFORMED. ELECTRICAL
<br />CONTRACTOR IS TO TAKE INTO CONSIDERATION SPECIAL OR UNUSUAL
<br />FEATURES PECULIAR TO THIS JOB.
<br />2.CONTACT UTILITY COMPANIES AND PROVIDE ALL SERVICES, WORK,
<br />INSTALLATION AND COORDINATION REQUIRED FOR THEIR USE. PAY ANY
<br />CHARGES MADE BY THEM.
<br />3.DO ALL WORK PER GOVERNING CODE REQUIREMENTS AND SUBMIT EVIDENCE
<br />OF APPROVAL. ALL WORK SHALL COMPLY WITH 2022 CEC & NEC.
<br />4.OBTAIN AND PAY FOR ALL ELECTRICAL PERMITS, INSPECTION FEES, ETC.
<br />5.COORDINATE WORK WITH ALL OTHER TRADES AND AS REQUIRED FOR FUTURE
<br />INCREMENTS OF CONSTRUCTION.
<br />6.PRIOR TO FINAL INSPECTION, FURNISH TO THE ENGINEER A SET OF "AS-BUILT"
<br />TRANSPARENCIES (OBTAINED FROM THE ARCHITECT AT THE COWNER'S COST)
<br />OF THE ORIGINAL DRAWINGS CORRECTED TO SHOW ALL CHANGES IN
<br />INSTALLATION.
<br />7.THE ELECTRICAL CONTRACTOR SHALL EXERCISE ALL CONTRACT PLANS IN
<br />ORDER ORDER TO LOCATE WORK IN COORDINATION WITH THE CONSTRUCTION
<br />OF SUCH ITEMS AS CABINETS, BEAMS, FURRING, DOORS, DUCTS, PIPES AND
<br />CEILINGS.
<br />8.EXACT LOCATION AND DIMENSIONS OF ALL EQUIPMENT SHALL BE VERIFIED IN
<br />FIELD PRIOR TO ORDERING AND INSTALLATION, AS PER NORMAL INDUSTRY
<br />STANDARDS.
<br />9.REFER TO MECHANICAL/PLUMBING DRAWINGS FOR EXACT LOCATION OF ALL
<br />MECHANICAL/PLUMBING EQUIPMENT RESPECTIVELY.
<br />10.REFER TO MECHANICAL CONTROL WIRING DIAGRAMS FOR ITEMS AND DEVICES
<br />TO BE FURNISHED, INSTALLED AND/OR CONNECTED BY ELECTRICAL
<br />CONTRACTOR FOR COMPLETE AND OPERABLE "HVAC" SYSTEM.
<br />11.REFER TO PLUMBING DRAWINGS FOR ITEMS AND DEVICES TO BE FURNISHED,
<br />INSTALLED AND/OR CONNECTED BY ELECTRICAL CONTRACTOR.
<br />12.CONDUIT STUBS SHALL BE TERMINATED IN ACCESSIBLE LOCATIONS, SECURELY
<br />CAPPED AND IDENTIFIED BY VISIBLE MARKER.
<br />13.INSTALL APPROVED GROUNDING BUSHING AT EACH TERMINATION OF RIGID
<br />CONDUIT, AND AS OTHERWISE REQUIRED BY CODE.
<br />14.ALL WIRE SHALL BE NEW, ALUMINUM OR COPPER AS INDICATED, THWN OR THHN.
<br />ALL COPPER CONDUCTORS WITH #1 OR SMALLER SHALL BE RATED 60° CELSIUS.
<br />ALL COPPER CONDUCTOR WITH #1/0 OR BIGGER SHALL BE RATED 75 DEGRESS
<br />CELSIUS, U.O.N.
<br />15.PERMANENTLY AND VISIBLY LABEL ALL J-BOX COVER PLATES WITH CIRCUIT AND
<br />VOLTAGE CONTAINED.
<br />16.CONDUIT RUNS ARE SHOWN DIAGRAMMATICALLY FOR CIRCUITING PURPOSES
<br />ONLY AND MAY BE VARIED IF APPROVED IN WRITING.
<br />17.PROVIDE A MINIMUM OF 12" SEPARATION BETWEEN POWER AND TELEPHONE
<br />CONDUITS WHERE THEY ARE INSTALLED IN THE SAME TRENCH OR CROSS, U.O.N.
<br />18.CONDUITS SHALL BE CLEAN OF WATER DEBRIS AND OTHER FOREIGN MATERIAL
<br />PRIOR TO PULLING CABLES.
<br />19.ALL CONDUITS FOR FUTURE USE SHALL HAVE PULL ROPE LEFT IN PLACE.
<br />20.THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND
<br />MARKING THE CORRECT PHASING OF THE BRANCH CIRCUIT OF THE ELECTRICAL
<br />PANELS AND BRANCH CIRCUITS.
<br />21.OVERCURRENT PROTECTION AND DISCONNECTING MEANS FOR ALL MOTORS
<br />SHALL BE INSTALLED TO COMPLY WITH N.E.C. AND LOCAL JURISDICTION.
<br />22.ALL ELECTRICAL EQUIPMENT SHALL BE UL LISTED AND ALL OUTDOOR OUTLET
<br />SHALL BE GFCI, WEATHERPROOF. ALL OUTDOOR EQUIPMENT SHALL BE
<br />WEATHERPROOF.
<br />23.IT IS THE INTENT OF THESE DRAWINGS THAT THIS BE A COMPLETE ELECTRICAL
<br />JOB. ANY DISCREPANCIES OR OMISSIONS SHALL BE BROUGHT TO THE
<br />ATTENTION OF THE ENGINEER PRIOR TO BIDDING.
<br />24. ALL CIRCUIT BREAKERS IN PANELS ARE RATED 14,000 A FOR 277V & 10KAIC FOR
<br />120V. ALL CIRCUIT BREAKERS TO BE RATED AT 75 DEGREES U.O.N.
<br />25.ELECTRICAL CONTRACTOR TO VERIFY IN FIELD THE MOST FEASIBLE WAY OF
<br />ROUTING AND COMBINING HOME RUNS AND PERFORM ACCORDINGLY.
<br />26.ALL ELECTRICAL OUTLETS READILY ACCESSIBLE LOCATED IN THE BATHROOMS
<br />AND KITCHEN SHALL BE EQUIPPED WITH GROUND FAULT CIRCUIT INTERRUPTIVE
<br />DEVICE.
<br />27.ALL COLORS AND FINISHES OF ELECTRICAL EQUIPMENT AND LIGHTING FIXTURES
<br />TO BE VERIFIED WITH OWNER AND/OR ARCHITECT PRIOR TO ORDERING.
<br />28.ELECTRICAL CONTRACTOR TO SIZE ALL J-BOXES AS PER TABLE 370-16A. ALL
<br />J-BOXES TO BE SQUARE 4"X 2-1/8" MINIMUM. ALL J-BOXES TO BE READILY
<br />ACCESSIBLE.
<br />29.ALL PANELBOARDS, SWITCHBOARDS, ETC. SHALL BE RATED AT 75° CELSIUS
<br />U.N.O.
<br />30.THE MAXIMUM LENGTH OF SOLAR EXPOSED CONDUITS SHALL NOT EXCEED 4
<br />FEET.
<br />31.ALL CIRCUIT BREAKER TRIP SHALL BE OF A TYPE TO BE ADJUSTED BY A
<br />QUALIFIED PERSON ONLY.
<br />32.FOR EXACT LIGHTING FIXTURE SPECIFICATIONS, REFER TO SHEET E1.01
<br />33.REFER TO ARCHITECTURAL OR SPACE PLANNING DRAWINGS FOR EXACT
<br />LOCATION OF LIGHTING FIXTURES, OUTLETS, FURNITURE AND OTHER
<br />EQUIPMENT. IN CASE OF ANY DISCREPANCY BETWEEN THE ARCHITECTURAL OR
<br />ELECTRICAL DRAWINGS, THE FORMER TAKES PRECEDENCE. ELECTRICAL
<br />CONTRACTOR TO INFORM THE ENGINEER IMMEDIATELY.
<br />34.FUSES SPECIFIED FOR MOTORS AND AIR CONDITIONING EQUIPMENT 600A AND
<br />UNDER SHALL BE TIME DELAY DUAL ELEMENT TYPE FRN-R (250V) AND FRS-R
<br />(600V) CLASS "L" U.O.N.
<br />35.FUSES SPECIFIED IN SWITCHBOARDS 600A AND UNDER SHALL BE FAST ACTING
<br />TYPE KTN-R (250V) AND KTS-R (600V) CLASS RKI. FOR 601A AND ABOVE USE
<br />TYPE KTU (600V) CLASS "L" U.O.N.
<br />36.LIGHTING CONTROL PANEL SHALL BE 365-DAYS PROGRAMMABLE WITH 10-HOURS
<br />BATTERY BACKUP.
<br />37.FIRE ALARM CONSULTANT SHALL SUBMIT FIRE ALARM SYSTEM DESIGN ON A
<br />SEPARATE PACKAGE. FIRE ALARM IS NOT PART OF THIS CONTRACT AND SHALL
<br />BE DONE BY OTHERS.
<br />38.ALL ELECTRICAL MATERIALS SHALL BEAR THE UNDERWRITERS (OR EQUIVALENT
<br />TESTING AGENCY) LABEL. ELECTRICAL EQUIPMENT SHALL BE LISTED BY A CITY
<br />OF LOS ANGELES RECOGNIZED ELECTRICAL TESTING LABORATORY OR
<br />APPROVED BY THE DEPARTMENT.
<br />39.UNLESS INFORMED OTHERWISE IN WRITING, THIS PROJECT HAS BEEN
<br />DETERMINED TO REQUIRE THE LOCAL CITY AUTHORITIES PLAN CHECK
<br />APPROVAL AND VALID PERMIT IN ACCORDANCE WITH THE LAW. ALL DESIGN
<br />WORK INDICATED ON PLANS AND SPECIFICATIONS IS SUBJECT TO REVIEW AND
<br />CHANGES BY SAID PLAN CHECK AUTHORITIES.
<br />40.DO NOT ORDER ANY EQUIPMENT OR PERFORM ANY WORK OVER $500 IN TOTAL
<br />VALUE ON THE JOB UNTIL THE COMPLETION OF THE PLAN CHECK APPROVAL
<br />PROCESS AND OBTAINING OF ALL REQUIRED PERMITS. INSTALLATION OF ANY
<br />EQUIPMENT WITHOUT VALID PERMITS, WHEN REQUIRED, IS A VIOLATION OF THE
<br />CODE.
<br />41.UNDER THE STATE OF CALIFORNIA CONTRACTORS STATE LICENSE BOARD
<br />REGULATIONS, ALL CONTRACTORS ARE REQUIRED TO ADHERE TO THE LOCAL
<br />CODES AND LAWS WITHOUT EXCEPTION.
<br />42.ELECTRICAL CONTRACTOR TO OBTAIN ARCHITECTURAL APPROVAL OF ALL
<br />LIGHTING FIXTURES SPECIFIED FOR THE PROJECT PRIOR TO ORDERING.
<br />43.ELECTRICAL CONTRACTOR SHALL PROVIDE CLEARANCES FOR ALL ELECTRICAL
<br />EQUIPMENT PER TABLE 110.26 (A) (1) CEC 2019.
<br />44.PROVIDE GROUND FAULT CIRCUIT INTERRUPTER (GFCI) PROTECTION ON
<br />RECEPTACLES LOCATED IN THE FOLLOWING AREAS:
<br />A.KITCHEN, BATHROOM, GARAGES, OUTDOORS, CRAWL SPACES, AND
<br />UNFINISHED BASEMENTS OF DWELLING UNITS.
<br />B.WITHIN 6 FEET OF LAUNDRY, UTILITY AND WET BAR SINK IN DWELLING
<br />UNITS.
<br />C.OUTDOOR SPACES.
<br />45.THESE ELECTRICAL PLAN ARE SAID TO BE FINAL WHEN STAMPED AND
<br />APPROVED BY BUILDING & SAFETY DEPARTMENT.
<br />46.PLAN CHECK REVISIONS (IF ANY) WILL BE ISSUED AT A LATER DATE AS AN
<br />ADDENDUM.
<br />47.THE WORK SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH THE
<br />FOLLOWING LEGALLY CONSTITUTED AUTHORITIES AND CODES HAVING
<br />JURISDICTION.
<br />A.2022 CALIFORNIA ELECTRICAL CODE (CEC)
<br />B.2022 CALIFORNIA BUILDING CODE (CBC)
<br />C.2022 CALIFORNIA MECHANICAL CODE (CMC)
<br />D.2022 CALIFORNIA PLUMBING CODE (CPC)
<br />E.2022 CALIFORNIA ENERGY CODE (CENC)
<br />48.CONTRACTOR TO VERIFY MOTOR STARTER SWITCH REQUIREMENTS OF ALL AHU,
<br />A/C AND PUMPS. PROVIDE AS NECESSARY.
<br />49.CONTRACTOR TO BE RESPONSIBLE FOR FINAL COORDINATION AND LOCATION
<br />OF MAIN TELEPHONE BACKBOARD WITH TELEPHONE COMPANY AND BUILDING
<br />OWNER'S REP.
<br />50.CONTRACTOR TO PROVIDE TYPED CIRCUIT DIRECTORY SHOWING CIRCUIT
<br />ARRANGEMENT OF ELECTRICAL LOADS IN THE PANEL BOARD.
<br />51.CONDUCTORS OF A MULTI-WIRE BRANCH CIRCUIT SHALL ORIGINATE FROM THE
<br />SAME PANEL BOARD. THE BRANCH CIRCUIT SHALL BE PROVIDED WITH A MEANS
<br />THAT WILL SIMULTANEOUSLY VIBRATING MOTORIZED EQUIPMENT FINAL
<br />CONNECTION SHALL BE PROVIDED WITH LIQUID TIGHT ORIGINATES PER
<br />[210.4,240.15(B)(1)]
<br />52. ALL UNDERGROUND CONDUITS SHALL BE PVC SCHEDULE 40.
<br />53.ALL EXPOSED CONDUITS (NOT SUBJECT TO THE MOISTURE) SHALL BE
<br />ELECTRICAL METALLIC TUBING (EMT). (C). ALL VIBRATING MOTORIZED
<br />EQUIPMENT FINAL CONNECTION SHALL BE PROVIDED WITH LIQUID TIGHT
<br />FLEXIBLE CONDUIT. (D) MINIMUM CONDUIT SIZE SHALL BE 3/4"C.
<br />54.THE WORD "PROVIDE" MEANS FURNISH, INSTALL AND ELECTRICALLY CONNECT
<br />AS PART OF THE WORK OF DIVISION 26.
<br />55.BONDING OF PIPING SYSTEMS IN ACCORDANCE WITH NEC ART. 250.80 SHALL
<br />INCLUDE BONDING OF ALL WATER, GAS, FIRE SPRINKLER, COMPRESSED AIR
<br />AND/OR ANY OTHER METALLIC PIPING.
<br />56.NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL
<br />BE PERMITTED TO BE LOCATED WITHIN THE DEDICATED SPACE ABOVE THE
<br />INDOOR/OUTDOOR ELECTRICAL EQUIPMENT.
<br />57.COORDINATE ALL SWITCHING LOCATIONS WITH THE ARCHITECT PRIOR TO
<br />ROUGH IN CONSTRUCTION OCCUPANCY SENSOR CONTROLS (I.E., WALL
<br />MOUNTED SINGLE AND DOUBLE POLE, CEILING MOUNTED SENSORS)
<br />58.EVERY SINGLE HOMERUNS SHALL BE PROVIDED WITH THE APPROPRIATE
<br />CONDUIT SIZE AS INDICATED ON THE ELECTRICAL PLAN. MINIMUM SIZE OF
<br />CONDUIT SHALL BE 3/4" C. U.N.O.
<br />59.EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED.
<br />60.EXIT SIGNS SHALL BE ILLUMINATED BY AN EXTERNAL SOURCE SHALL HAVE AN
<br />INTENSITY OF NOT LESS THAN 5-FOOT CANDLES (54 LUX).
<br />61.INTERNALLY ILLUMINATED SIGNS SHALL BE LISTED AND LABELED AND SHALL BE
<br />INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND
<br />SECTION 2702.
<br />62.EXIT SIGNS SHALL BE ILLUMINATED AT ALL TIMES.
<br />63.EXIT SIGNS SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM THAT
<br />WILL PROVIDE AN ILLUMINATION OF NOT LESS THAN 90 MIN. IN CASE OF PRIMARY
<br />POWER LOSS. (1011.5-1011.6.3).
<br />64.THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE
<br />ILLUMINATED AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF
<br />EGRESS IS OCCUPIED. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT
<br />BE LESS THAN 1 FOOT-CANDLE AT THE WALKING SURFACE. (1006.1)
<br />65.ALL EMERGENCY AND EXIT LIGHTS SHALL BE PROVIDED WITH UNCONTROLLED
<br />HOT WIRE AS REQUIRED. EMERGENCY LIGHTING SHALL BE PROVIDED WITH
<br />MINIMUM 90 MINUTE BATTERY PACK.
<br />66.PROVIDE ARC-FLASH HAZARD WARNING AS REQUIRED.
<br />110.16A. GENERAL
<br />A.ELECTRICAL EQUIPMENT, SUCH AS SWITCHBOARDS, SWITCHGEAR,
<br />PANELBOARDS, INDUSTRIAL CONTROL PANELS, METER SOCKET
<br />ENCLOSURES, AND MOTOR CONTROL CENTERS, THAT IS IN OTHER THAN
<br />DWELLING UNITS, AND IS LIKELY TO REQUIRE EXAMINATION, ADJUSTMENT,
<br />SERVICING, OR MAINTENANCE WHILE ENERGIZED, SHALL BE FIELD OR
<br />FACTORY MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL
<br />ELECTRIC ARC FLASH HAZARDS. THE MARKING SHALL MEET THE
<br />REQUIREMENTS IN 110.21
<br />B.AND SHALL BE LOCATED SO AS TO BE CLEARLY VISIBLE TO QUALIFIED
<br />PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR
<br />MAINTENANCE OF THE EQUIPMENT.
<br />110.16B SERVICE EQUIPMENT. IN OTHER THAN DWELLING UNITS, IN ADDITION
<br />TO THE REQUIREMENTS IN (A), A PERMANENT LABEL SHALL BE FIELD OR
<br />FACTORY APPLIED TO SERVICE EQUIPMENT RATED 1200 AMPS OR MORE. THE
<br />LABEL SHALL MEET THE REQUIREMENTS OF 110.21(B) AND CONTAIN THE
<br />FOLLOWING INFORMATION:
<br />(1)NOMINAL SYSTEM VOLTAGE
<br />(2)AVAILABLE FAULT CURRENT AT THE SERVICE OVERCURRENT
<br />PROTECTIVE DEVICES
<br />(3)THE CLEARING TIME OF SERVICE OVERCURRENT PROTECTIVE
<br />DEVICES BASED ON THE AVAILABLE FAULT CURRENT AT THE SERVICE
<br />EQUIPMENT.
<br />(4)THE DATE THE LABEL WAS APPLIED
<br />EXCEPTION: SERVICE EQUIPMENT LABELING SHALL NOT BE REQUIRED IF AN
<br />ARC FLASH LABEL IS APPLIED IN ACCORDANCE WITH ACCEPTABLE INDUSTRY
<br />PRACTICE.
<br />67.PROVIDE LOCK OUT DISCONNECT SWITCH TO EACH ILLUMINATED SIGN RATED
<br />FOR ITS USE AS REQUIRED BY CEC 600.6.
<br />68.PROVIDE SHUNT TRIP TYPE CIRCUIT BREAKER/S TO EACH COOKING EQUIPMENT
<br />AS REQUIRED IN COMMERCIAL KITCHEN AND INTEGRATE WITH FIRE
<br />SUPPRESSION SYSTEM.
<br />GENERAL NOTES SCOPE OF WORK
<br />PROVIDE NEW MAIN SWITCHBOARD MSB 600A, 120/208V, 3Ø, 4W.
<br />PROVIDE NEW PANELBOARDS FOR LIGHTING, POWER, MECHANICAL AND
<br />PLUMBING CONNECTIONS.
<br />PROVIDE CONNECTIONS TO NEW LIGHTING (NORMAL AND EMERGENCY),
<br />POWER, AND KITCHEN EQUIPMENT.
<br />PROVIDE CONNECTION TO EACH MECHANICAL, PLUMBING AND KITCHEN
<br />EQUIPMENT.
<br />FIRE ALARM NOTES
<br />(SEPARATE SUBMITTAL AND PERMIT)
<br />1.CONTRACTOR (LIFE SAFETY VENDOR) SHALL BE RESPONSIBLE FOR
<br />SUBMITTING COMPLETE FIRE ALARM PLANS, REQUIRED CONNECTION
<br />DIAGRAMS, WIRING DIAGRAMS, BATTERY CALCULATIONS AND WORST
<br />CASE VOLTAGE DROP CALCULATIONS TO THE CITY FIRE
<br />DEPARTMENT FOR REVIEW AND OBTAIN APPROVAL FROM THE CITY
<br />PRIOR TO INSTALLING THE SYSTEM.
<br />2.AN APPROVED MANUAL AND AUTOMATIC FIRE ALARM SYSTEM SHALL
<br />BE INSTALLED IN ACCORDANCE WITH CFC, SECTION 907 AND
<br />CALIFORNIA BUILDING CODE.
<br />3.VARIANCE FOR THE FIRE ALARM SYSTEM SHALL BE SEPARATE.
<br />ELECTRICAL CONTRACTOR TO PAY SEPARATE FEE FOR
<br />VARIANCE/MODIFICATION UPON PLAN CHECK RESUBMITTAL.
<br />Scale
<br />Date
<br />Drawn By
<br />Checked By
<br />Project Number
<br />14
<br />3
<br />0
<br />
<br />E
<br />
<br />E
<br />D
<br />I
<br />N
<br />G
<br />E
<br />R
<br />
<br />A
<br />V
<br />E
<br />,
<br />
<br />S
<br />A
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />5
<br />NOVUM
<br />A R C H I T E C T U R E, Inc
<br />www.novumarchitecture.com
<br />OFFICES: SOUTH BAY / ORANGE COUNTY
<br />116 S CATALINA AVE. STE. 122,
<br />REDONDO BEACH, CA 90277
<br />TEL: 310-383-1827 / 310-709-4476
<br />N
<br />AS SHOWN
<br />TO
<br />M
<br />'
<br />S
<br />
<br />J
<br />R
<br />CAD
<br />Author
<br />9-1-2023
<br />tom's2023
<br />Mr
<br />.
<br />
<br />S
<br />p
<br />i
<br />r
<br />o
<br />s
<br />
<br />P
<br />o
<br />l
<br />i
<br />t
<br />i
<br />s
<br />No.Description Date
<br />1 PC Comments 08/08/2024
<br />2 HlthDep.Corr.2 09/03/2024
<br />GENERAL NOTES &
<br />SHEET INDEX
<br />E-101
<br />ELECTRICAL SHEET INDEX
<br />SHEET #SHEET TITLE ISSUE TAG
<br />E-101 GENERAL NOTES & SHEET INDEX HEALTH DEPT.CORR.2
<br />E-102 SYMBOLS LIST & ABBREVIATION HEALTH DEPT.CORR.2
<br />E-103 SINGLE LINE DIAGRAM HEALTH DEPT.CORR.2
<br />E-104 LUMINAIRE SCHEDULE HEALTH DEPT.CORR.2
<br />E-105 PANEL SCHEDULES HEALTH DEPT.CORR.2
<br />E-106 INTERIOR LIGHTING TITLE 24 HEALTH DEPT.CORR.2
<br />E-107 OUTDOOR LIGHTING TITLE 24 HEALTH DEPT.CORR.2
<br />E-108 ELECTRICAL SITE PLAN HEALTH DEPT.CORR.2
<br />E-109 SITE LIGHTING PHOTOMETRIC
<br />CALCULATIONS HEALTH DEPT.CORR.2
<br />E-110 LIGHTING PLAN HEALTH DEPT.CORR.2
<br />E-111 EMERGENCY PHOTOMETRIC PLAN HEALTH DEPT.CORR.2
<br />E-112 POWER PLAN HEALTH DEPT.CORR.2
<br />E-113 ELECTRICAL ROOF PLAN HEALTH DEPT.CORR.2
<br />E-114 ELECTRICAL DETAILS HEALTH DEPT.CORR.2
<br />E-115 ELECTRICAL DETAILS HEALTH DEPT.CORR.2
<br />E-116 ELECTRICAL DETAILS HEALTH DEPT.CORR.2
<br />E-117 ELECTRICAL DETAILS HEALTH DEPT.CORR.2
<br />E-118 EQUIPMENT SCHEDULE HEALTH DEPT.CORR.2
<br />E-119 POWER TITLE 24 HEALTH DEPT.CORR.2