Laserfiche WebLink
1.THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND <br />THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS AND THE <br />EXACT NATURE AND EXTENT OF THE WORK TO BE PERFORMED. ELECTRICAL <br />CONTRACTOR IS TO TAKE INTO CONSIDERATION SPECIAL OR UNUSUAL <br />FEATURES PECULIAR TO THIS JOB. <br />2.CONTACT UTILITY COMPANIES AND PROVIDE ALL SERVICES, WORK, <br />INSTALLATION AND COORDINATION REQUIRED FOR THEIR USE. PAY ANY <br />CHARGES MADE BY THEM. <br />3.DO ALL WORK PER GOVERNING CODE REQUIREMENTS AND SUBMIT EVIDENCE <br />OF APPROVAL. ALL WORK SHALL COMPLY WITH 2022 CEC & NEC. <br />4.OBTAIN AND PAY FOR ALL ELECTRICAL PERMITS, INSPECTION FEES, ETC. <br />5.COORDINATE WORK WITH ALL OTHER TRADES AND AS REQUIRED FOR FUTURE <br />INCREMENTS OF CONSTRUCTION. <br />6.PRIOR TO FINAL INSPECTION, FURNISH TO THE ENGINEER A SET OF "AS-BUILT" <br />TRANSPARENCIES (OBTAINED FROM THE ARCHITECT AT THE COWNER'S COST) <br />OF THE ORIGINAL DRAWINGS CORRECTED TO SHOW ALL CHANGES IN <br />INSTALLATION. <br />7.THE ELECTRICAL CONTRACTOR SHALL EXERCISE ALL CONTRACT PLANS IN <br />ORDER ORDER TO LOCATE WORK IN COORDINATION WITH THE CONSTRUCTION <br />OF SUCH ITEMS AS CABINETS, BEAMS, FURRING, DOORS, DUCTS, PIPES AND <br />CEILINGS. <br />8.EXACT LOCATION AND DIMENSIONS OF ALL EQUIPMENT SHALL BE VERIFIED IN <br />FIELD PRIOR TO ORDERING AND INSTALLATION, AS PER NORMAL INDUSTRY <br />STANDARDS. <br />9.REFER TO MECHANICAL/PLUMBING DRAWINGS FOR EXACT LOCATION OF ALL <br />MECHANICAL/PLUMBING EQUIPMENT RESPECTIVELY. <br />10.REFER TO MECHANICAL CONTROL WIRING DIAGRAMS FOR ITEMS AND DEVICES <br />TO BE FURNISHED, INSTALLED AND/OR CONNECTED BY ELECTRICAL <br />CONTRACTOR FOR COMPLETE AND OPERABLE "HVAC" SYSTEM. <br />11.REFER TO PLUMBING DRAWINGS FOR ITEMS AND DEVICES TO BE FURNISHED, <br />INSTALLED AND/OR CONNECTED BY ELECTRICAL CONTRACTOR. <br />12.CONDUIT STUBS SHALL BE TERMINATED IN ACCESSIBLE LOCATIONS, SECURELY <br />CAPPED AND IDENTIFIED BY VISIBLE MARKER. <br />13.INSTALL APPROVED GROUNDING BUSHING AT EACH TERMINATION OF RIGID <br />CONDUIT, AND AS OTHERWISE REQUIRED BY CODE. <br />14.ALL WIRE SHALL BE NEW, ALUMINUM OR COPPER AS INDICATED, THWN OR THHN. <br />ALL COPPER CONDUCTORS WITH #1 OR SMALLER SHALL BE RATED 60° CELSIUS. <br />ALL COPPER CONDUCTOR WITH #1/0 OR BIGGER SHALL BE RATED 75 DEGRESS <br />CELSIUS, U.O.N. <br />15.PERMANENTLY AND VISIBLY LABEL ALL J-BOX COVER PLATES WITH CIRCUIT AND <br />VOLTAGE CONTAINED. <br />16.CONDUIT RUNS ARE SHOWN DIAGRAMMATICALLY FOR CIRCUITING PURPOSES <br />ONLY AND MAY BE VARIED IF APPROVED IN WRITING. <br />17.PROVIDE A MINIMUM OF 12" SEPARATION BETWEEN POWER AND TELEPHONE <br />CONDUITS WHERE THEY ARE INSTALLED IN THE SAME TRENCH OR CROSS, U.O.N. <br />18.CONDUITS SHALL BE CLEAN OF WATER DEBRIS AND OTHER FOREIGN MATERIAL <br />PRIOR TO PULLING CABLES. <br />19.ALL CONDUITS FOR FUTURE USE SHALL HAVE PULL ROPE LEFT IN PLACE. <br />20.THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND <br />MARKING THE CORRECT PHASING OF THE BRANCH CIRCUIT OF THE ELECTRICAL <br />PANELS AND BRANCH CIRCUITS. <br />21.OVERCURRENT PROTECTION AND DISCONNECTING MEANS FOR ALL MOTORS <br />SHALL BE INSTALLED TO COMPLY WITH N.E.C. AND LOCAL JURISDICTION. <br />22.ALL ELECTRICAL EQUIPMENT SHALL BE UL LISTED AND ALL OUTDOOR OUTLET <br />SHALL BE GFCI, WEATHERPROOF. ALL OUTDOOR EQUIPMENT SHALL BE <br />WEATHERPROOF. <br />23.IT IS THE INTENT OF THESE DRAWINGS THAT THIS BE A COMPLETE ELECTRICAL <br />JOB. ANY DISCREPANCIES OR OMISSIONS SHALL BE BROUGHT TO THE <br />ATTENTION OF THE ENGINEER PRIOR TO BIDDING. <br />24. ALL CIRCUIT BREAKERS IN PANELS ARE RATED 14,000 A FOR 277V & 10KAIC FOR <br />120V. ALL CIRCUIT BREAKERS TO BE RATED AT 75 DEGREES U.O.N. <br />25.ELECTRICAL CONTRACTOR TO VERIFY IN FIELD THE MOST FEASIBLE WAY OF <br />ROUTING AND COMBINING HOME RUNS AND PERFORM ACCORDINGLY. <br />26.ALL ELECTRICAL OUTLETS READILY ACCESSIBLE LOCATED IN THE BATHROOMS <br />AND KITCHEN SHALL BE EQUIPPED WITH GROUND FAULT CIRCUIT INTERRUPTIVE <br />DEVICE. <br />27.ALL COLORS AND FINISHES OF ELECTRICAL EQUIPMENT AND LIGHTING FIXTURES <br />TO BE VERIFIED WITH OWNER AND/OR ARCHITECT PRIOR TO ORDERING. <br />28.ELECTRICAL CONTRACTOR TO SIZE ALL J-BOXES AS PER TABLE 370-16A. ALL <br />J-BOXES TO BE SQUARE 4"X 2-1/8" MINIMUM. ALL J-BOXES TO BE READILY <br />ACCESSIBLE. <br />29.ALL PANELBOARDS, SWITCHBOARDS, ETC. SHALL BE RATED AT 75° CELSIUS <br />U.N.O. <br />30.THE MAXIMUM LENGTH OF SOLAR EXPOSED CONDUITS SHALL NOT EXCEED 4 <br />FEET. <br />31.ALL CIRCUIT BREAKER TRIP SHALL BE OF A TYPE TO BE ADJUSTED BY A <br />QUALIFIED PERSON ONLY. <br />32.FOR EXACT LIGHTING FIXTURE SPECIFICATIONS, REFER TO SHEET E1.01 <br />33.REFER TO ARCHITECTURAL OR SPACE PLANNING DRAWINGS FOR EXACT <br />LOCATION OF LIGHTING FIXTURES, OUTLETS, FURNITURE AND OTHER <br />EQUIPMENT. IN CASE OF ANY DISCREPANCY BETWEEN THE ARCHITECTURAL OR <br />ELECTRICAL DRAWINGS, THE FORMER TAKES PRECEDENCE. ELECTRICAL <br />CONTRACTOR TO INFORM THE ENGINEER IMMEDIATELY. <br />34.FUSES SPECIFIED FOR MOTORS AND AIR CONDITIONING EQUIPMENT 600A AND <br />UNDER SHALL BE TIME DELAY DUAL ELEMENT TYPE FRN-R (250V) AND FRS-R <br />(600V) CLASS "L" U.O.N. <br />35.FUSES SPECIFIED IN SWITCHBOARDS 600A AND UNDER SHALL BE FAST ACTING <br />TYPE KTN-R (250V) AND KTS-R (600V) CLASS RKI. FOR 601A AND ABOVE USE <br />TYPE KTU (600V) CLASS "L" U.O.N. <br />36.LIGHTING CONTROL PANEL SHALL BE 365-DAYS PROGRAMMABLE WITH 10-HOURS <br />BATTERY BACKUP. <br />37.FIRE ALARM CONSULTANT SHALL SUBMIT FIRE ALARM SYSTEM DESIGN ON A <br />SEPARATE PACKAGE. FIRE ALARM IS NOT PART OF THIS CONTRACT AND SHALL <br />BE DONE BY OTHERS. <br />38.ALL ELECTRICAL MATERIALS SHALL BEAR THE UNDERWRITERS (OR EQUIVALENT <br />TESTING AGENCY) LABEL. ELECTRICAL EQUIPMENT SHALL BE LISTED BY A CITY <br />OF LOS ANGELES RECOGNIZED ELECTRICAL TESTING LABORATORY OR <br />APPROVED BY THE DEPARTMENT. <br />39.UNLESS INFORMED OTHERWISE IN WRITING, THIS PROJECT HAS BEEN <br />DETERMINED TO REQUIRE THE LOCAL CITY AUTHORITIES PLAN CHECK <br />APPROVAL AND VALID PERMIT IN ACCORDANCE WITH THE LAW. ALL DESIGN <br />WORK INDICATED ON PLANS AND SPECIFICATIONS IS SUBJECT TO REVIEW AND <br />CHANGES BY SAID PLAN CHECK AUTHORITIES. <br />40.DO NOT ORDER ANY EQUIPMENT OR PERFORM ANY WORK OVER $500 IN TOTAL <br />VALUE ON THE JOB UNTIL THE COMPLETION OF THE PLAN CHECK APPROVAL <br />PROCESS AND OBTAINING OF ALL REQUIRED PERMITS. INSTALLATION OF ANY <br />EQUIPMENT WITHOUT VALID PERMITS, WHEN REQUIRED, IS A VIOLATION OF THE <br />CODE. <br />41.UNDER THE STATE OF CALIFORNIA CONTRACTORS STATE LICENSE BOARD <br />REGULATIONS, ALL CONTRACTORS ARE REQUIRED TO ADHERE TO THE LOCAL <br />CODES AND LAWS WITHOUT EXCEPTION. <br />42.ELECTRICAL CONTRACTOR TO OBTAIN ARCHITECTURAL APPROVAL OF ALL <br />LIGHTING FIXTURES SPECIFIED FOR THE PROJECT PRIOR TO ORDERING. <br />43.ELECTRICAL CONTRACTOR SHALL PROVIDE CLEARANCES FOR ALL ELECTRICAL <br />EQUIPMENT PER TABLE 110.26 (A) (1) CEC 2019. <br />44.PROVIDE GROUND FAULT CIRCUIT INTERRUPTER (GFCI) PROTECTION ON <br />RECEPTACLES LOCATED IN THE FOLLOWING AREAS: <br />A.KITCHEN, BATHROOM, GARAGES, OUTDOORS, CRAWL SPACES, AND <br />UNFINISHED BASEMENTS OF DWELLING UNITS. <br />B.WITHIN 6 FEET OF LAUNDRY, UTILITY AND WET BAR SINK IN DWELLING <br />UNITS. <br />C.OUTDOOR SPACES. <br />45.THESE ELECTRICAL PLAN ARE SAID TO BE FINAL WHEN STAMPED AND <br />APPROVED BY BUILDING & SAFETY DEPARTMENT. <br />46.PLAN CHECK REVISIONS (IF ANY) WILL BE ISSUED AT A LATER DATE AS AN <br />ADDENDUM. <br />47.THE WORK SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH THE <br />FOLLOWING LEGALLY CONSTITUTED AUTHORITIES AND CODES HAVING <br />JURISDICTION. <br />A.2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />B.2022 CALIFORNIA BUILDING CODE (CBC) <br />C.2022 CALIFORNIA MECHANICAL CODE (CMC) <br />D.2022 CALIFORNIA PLUMBING CODE (CPC) <br />E.2022 CALIFORNIA ENERGY CODE (CENC) <br />48.CONTRACTOR TO VERIFY MOTOR STARTER SWITCH REQUIREMENTS OF ALL AHU, <br />A/C AND PUMPS. PROVIDE AS NECESSARY. <br />49.CONTRACTOR TO BE RESPONSIBLE FOR FINAL COORDINATION AND LOCATION <br />OF MAIN TELEPHONE BACKBOARD WITH TELEPHONE COMPANY AND BUILDING <br />OWNER'S REP. <br />50.CONTRACTOR TO PROVIDE TYPED CIRCUIT DIRECTORY SHOWING CIRCUIT <br />ARRANGEMENT OF ELECTRICAL LOADS IN THE PANEL BOARD. <br />51.CONDUCTORS OF A MULTI-WIRE BRANCH CIRCUIT SHALL ORIGINATE FROM THE <br />SAME PANEL BOARD. THE BRANCH CIRCUIT SHALL BE PROVIDED WITH A MEANS <br />THAT WILL SIMULTANEOUSLY VIBRATING MOTORIZED EQUIPMENT FINAL <br />CONNECTION SHALL BE PROVIDED WITH LIQUID TIGHT ORIGINATES PER <br />[210.4,240.15(B)(1)] <br />52. ALL UNDERGROUND CONDUITS SHALL BE PVC SCHEDULE 40. <br />53.ALL EXPOSED CONDUITS (NOT SUBJECT TO THE MOISTURE) SHALL BE <br />ELECTRICAL METALLIC TUBING (EMT). (C). ALL VIBRATING MOTORIZED <br />EQUIPMENT FINAL CONNECTION SHALL BE PROVIDED WITH LIQUID TIGHT <br />FLEXIBLE CONDUIT. (D) MINIMUM CONDUIT SIZE SHALL BE 3/4"C. <br />54.THE WORD "PROVIDE" MEANS FURNISH, INSTALL AND ELECTRICALLY CONNECT <br />AS PART OF THE WORK OF DIVISION 26. <br />55.BONDING OF PIPING SYSTEMS IN ACCORDANCE WITH NEC ART. 250.80 SHALL <br />INCLUDE BONDING OF ALL WATER, GAS, FIRE SPRINKLER, COMPRESSED AIR <br />AND/OR ANY OTHER METALLIC PIPING. <br />56.NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL <br />BE PERMITTED TO BE LOCATED WITHIN THE DEDICATED SPACE ABOVE THE <br />INDOOR/OUTDOOR ELECTRICAL EQUIPMENT. <br />57.COORDINATE ALL SWITCHING LOCATIONS WITH THE ARCHITECT PRIOR TO <br />ROUGH IN CONSTRUCTION OCCUPANCY SENSOR CONTROLS (I.E., WALL <br />MOUNTED SINGLE AND DOUBLE POLE, CEILING MOUNTED SENSORS) <br />58.EVERY SINGLE HOMERUNS SHALL BE PROVIDED WITH THE APPROPRIATE <br />CONDUIT SIZE AS INDICATED ON THE ELECTRICAL PLAN. MINIMUM SIZE OF <br />CONDUIT SHALL BE 3/4" C. U.N.O. <br />59.EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. <br />60.EXIT SIGNS SHALL BE ILLUMINATED BY AN EXTERNAL SOURCE SHALL HAVE AN <br />INTENSITY OF NOT LESS THAN 5-FOOT CANDLES (54 LUX). <br />61.INTERNALLY ILLUMINATED SIGNS SHALL BE LISTED AND LABELED AND SHALL BE <br />INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND <br />SECTION 2702. <br />62.EXIT SIGNS SHALL BE ILLUMINATED AT ALL TIMES. <br />63.EXIT SIGNS SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM THAT <br />WILL PROVIDE AN ILLUMINATION OF NOT LESS THAN 90 MIN. IN CASE OF PRIMARY <br />POWER LOSS. (1011.5-1011.6.3). <br />64.THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE <br />ILLUMINATED AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF <br />EGRESS IS OCCUPIED. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT <br />BE LESS THAN 1 FOOT-CANDLE AT THE WALKING SURFACE. (1006.1) <br />65.ALL EMERGENCY AND EXIT LIGHTS SHALL BE PROVIDED WITH UNCONTROLLED <br />HOT WIRE AS REQUIRED. EMERGENCY LIGHTING SHALL BE PROVIDED WITH <br />MINIMUM 90 MINUTE BATTERY PACK. <br />66.PROVIDE ARC-FLASH HAZARD WARNING AS REQUIRED. <br />110.16A. GENERAL <br />A.ELECTRICAL EQUIPMENT, SUCH AS SWITCHBOARDS, SWITCHGEAR, <br />PANELBOARDS, INDUSTRIAL CONTROL PANELS, METER SOCKET <br />ENCLOSURES, AND MOTOR CONTROL CENTERS, THAT IS IN OTHER THAN <br />DWELLING UNITS, AND IS LIKELY TO REQUIRE EXAMINATION, ADJUSTMENT, <br />SERVICING, OR MAINTENANCE WHILE ENERGIZED, SHALL BE FIELD OR <br />FACTORY MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL <br />ELECTRIC ARC FLASH HAZARDS. THE MARKING SHALL MEET THE <br />REQUIREMENTS IN 110.21 <br />B.AND SHALL BE LOCATED SO AS TO BE CLEARLY VISIBLE TO QUALIFIED <br />PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR <br />MAINTENANCE OF THE EQUIPMENT. <br />110.16B SERVICE EQUIPMENT. IN OTHER THAN DWELLING UNITS, IN ADDITION <br />TO THE REQUIREMENTS IN (A), A PERMANENT LABEL SHALL BE FIELD OR <br />FACTORY APPLIED TO SERVICE EQUIPMENT RATED 1200 AMPS OR MORE. THE <br />LABEL SHALL MEET THE REQUIREMENTS OF 110.21(B) AND CONTAIN THE <br />FOLLOWING INFORMATION: <br />(1)NOMINAL SYSTEM VOLTAGE <br />(2)AVAILABLE FAULT CURRENT AT THE SERVICE OVERCURRENT <br />PROTECTIVE DEVICES <br />(3)THE CLEARING TIME OF SERVICE OVERCURRENT PROTECTIVE <br />DEVICES BASED ON THE AVAILABLE FAULT CURRENT AT THE SERVICE <br />EQUIPMENT. <br />(4)THE DATE THE LABEL WAS APPLIED <br />EXCEPTION: SERVICE EQUIPMENT LABELING SHALL NOT BE REQUIRED IF AN <br />ARC FLASH LABEL IS APPLIED IN ACCORDANCE WITH ACCEPTABLE INDUSTRY <br />PRACTICE. <br />67.PROVIDE LOCK OUT DISCONNECT SWITCH TO EACH ILLUMINATED SIGN RATED <br />FOR ITS USE AS REQUIRED BY CEC 600.6. <br />68.PROVIDE SHUNT TRIP TYPE CIRCUIT BREAKER/S TO EACH COOKING EQUIPMENT <br />AS REQUIRED IN COMMERCIAL KITCHEN AND INTEGRATE WITH FIRE <br />SUPPRESSION SYSTEM. <br />GENERAL NOTES SCOPE OF WORK <br />PROVIDE NEW MAIN SWITCHBOARD MSB 600A, 120/208V, 3Ø, 4W. <br />PROVIDE NEW PANELBOARDS FOR LIGHTING, POWER, MECHANICAL AND <br />PLUMBING CONNECTIONS. <br />PROVIDE CONNECTIONS TO NEW LIGHTING (NORMAL AND EMERGENCY), <br />POWER, AND KITCHEN EQUIPMENT. <br />PROVIDE CONNECTION TO EACH MECHANICAL, PLUMBING AND KITCHEN <br />EQUIPMENT. <br />FIRE ALARM NOTES <br />(SEPARATE SUBMITTAL AND PERMIT) <br />1.CONTRACTOR (LIFE SAFETY VENDOR) SHALL BE RESPONSIBLE FOR <br />SUBMITTING COMPLETE FIRE ALARM PLANS, REQUIRED CONNECTION <br />DIAGRAMS, WIRING DIAGRAMS, BATTERY CALCULATIONS AND WORST <br />CASE VOLTAGE DROP CALCULATIONS TO THE CITY FIRE <br />DEPARTMENT FOR REVIEW AND OBTAIN APPROVAL FROM THE CITY <br />PRIOR TO INSTALLING THE SYSTEM. <br />2.AN APPROVED MANUAL AND AUTOMATIC FIRE ALARM SYSTEM SHALL <br />BE INSTALLED IN ACCORDANCE WITH CFC, SECTION 907 AND <br />CALIFORNIA BUILDING CODE. <br />3.VARIANCE FOR THE FIRE ALARM SYSTEM SHALL BE SEPARATE. <br />ELECTRICAL CONTRACTOR TO PAY SEPARATE FEE FOR <br />VARIANCE/MODIFICATION UPON PLAN CHECK RESUBMITTAL. <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />14 <br />3 <br />0 <br /> <br />E <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />NOVUM <br />A R C H I T E C T U R E, Inc <br />www.novumarchitecture.com <br />OFFICES: SOUTH BAY / ORANGE COUNTY <br />116 S CATALINA AVE. STE. 122, <br />REDONDO BEACH, CA 90277 <br />TEL: 310-383-1827 / 310-709-4476 <br />N <br />AS SHOWN <br />TO <br />M <br />' <br />S <br /> <br />J <br />R <br />CAD <br />Author <br />9-1-2023 <br />tom's2023 <br />Mr <br />. <br /> <br />S <br />p <br />i <br />r <br />o <br />s <br /> <br />P <br />o <br />l <br />i <br />t <br />i <br />s <br />No.Description Date <br />1 PC Comments 08/08/2024 <br />2 HlthDep.Corr.2 09/03/2024 <br />GENERAL NOTES & <br />SHEET INDEX <br />E-101 <br />ELECTRICAL SHEET INDEX <br />SHEET #SHEET TITLE ISSUE TAG <br />E-101 GENERAL NOTES & SHEET INDEX HEALTH DEPT.CORR.2 <br />E-102 SYMBOLS LIST & ABBREVIATION HEALTH DEPT.CORR.2 <br />E-103 SINGLE LINE DIAGRAM HEALTH DEPT.CORR.2 <br />E-104 LUMINAIRE SCHEDULE HEALTH DEPT.CORR.2 <br />E-105 PANEL SCHEDULES HEALTH DEPT.CORR.2 <br />E-106 INTERIOR LIGHTING TITLE 24 HEALTH DEPT.CORR.2 <br />E-107 OUTDOOR LIGHTING TITLE 24 HEALTH DEPT.CORR.2 <br />E-108 ELECTRICAL SITE PLAN HEALTH DEPT.CORR.2 <br />E-109 SITE LIGHTING PHOTOMETRIC <br />CALCULATIONS HEALTH DEPT.CORR.2 <br />E-110 LIGHTING PLAN HEALTH DEPT.CORR.2 <br />E-111 EMERGENCY PHOTOMETRIC PLAN HEALTH DEPT.CORR.2 <br />E-112 POWER PLAN HEALTH DEPT.CORR.2 <br />E-113 ELECTRICAL ROOF PLAN HEALTH DEPT.CORR.2 <br />E-114 ELECTRICAL DETAILS HEALTH DEPT.CORR.2 <br />E-115 ELECTRICAL DETAILS HEALTH DEPT.CORR.2 <br />E-116 ELECTRICAL DETAILS HEALTH DEPT.CORR.2 <br />E-117 ELECTRICAL DETAILS HEALTH DEPT.CORR.2 <br />E-118 EQUIPMENT SCHEDULE HEALTH DEPT.CORR.2 <br />E-119 POWER TITLE 24 HEALTH DEPT.CORR.2 <br />2 <br />1430 E Edinger Ave <br />3/27/2025