MECHANICAL SPECIFICATIONS <br />30. THE DESIGN ON THE DRAWINGS (ELECTRICAL, STRUCTURAL, ETC.) IS BASED ON THE <br />MANUFACTURER LISTED. IF THE UNIT IS FURNISHED BY ONE OF THE OTHER LISTED <br />MANUFACTURERS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />MODIFICATIONS REQUIRED TO INSTALL SUCH MANUFACTURERS UNIT. THIS SHALL <br />INCLUDE, BUT NOT BE LIMITED TO, INCREASES IN UNIT ELECTRICAL FEEDER SIZES, <br />SWITCH AND FUSE OR BREAKER SIZES, ETC. <br />31.ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUIT AND PULL WIRING FOR <br />CONTROLS. FINAL CONNECTION TO CONTROLS SHALL BE BY MECHANICAL <br />CONTRACTOR. <br />32. REFRIGERANT PIPING: <br />A.ALL REFRIGERANT PIPING SHALL BE REFRIGERATION GRADE TYPE ACR DEGREASED, <br />SEALED AT MILL COPPER TUBING. <br />B.CONTRACTOR SHALL FURNISH A SWEAT TYPE COMBINATION SIGHT GLASS AND <br />MOISTURE INDICATOR. INCLUDE IN THE REFRIGERATION PIPING A FILTER/DRYER. <br />C.A SWEAT TYPE 3 WAY VALVE SHALL BE INSTALLED IN THE LIQUID LINE FOR CHARGING <br />AND EVACUATING. <br />D.HANGERS AND SUPPORTS: <br />1)ALL TUBING SHALL BE SECURELY SUPPORTED AND ANCHORED WITH "UNISTRUT" <br />OR EQUAL CLAMPS AND CHANNELS; RUBBER GROMMETS SHALL BE USED <br />BETWEEN TUBING AND CLAMPS TO PROTECT THE TUBING FROM POSSIBLE <br />RUBBING. <br />33. CHARGING: <br />A.THE PROPER AMOUNT OF REFRIGERANT SHALL BE CHARGED INTO THE SYSTEM <br />THROUGH THE LIQUID LINE. THE OIL LEVEL SHALL BE CHECKED AND OIL EITHER ADDED <br />OR REMOVED TO BRING THE LEVEL IN THE COMPRESSOR TO THE MIDDLE OF THE <br />SIGHT GLASS. <br />B.BEFORE ANY MOTORS ARE OPERATED, THE LUBRICATION SHALL BE CHECKED AND OIL <br />OR GAS ADDED WHERE NECESSARY. <br />1.THE WORK SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING LEGALLY <br />CONSTITUTED AUTHORITIES AND CODES HAVING JURISDICTION. <br />2.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR, EQUIPMENT, APPURTENANCES, AND OTHER <br />CONTRACTUAL EXPENSES REQUIRED FOR THE COMPLETE INSTALLATION OF THE MECHANICAL WORK TO THE <br />SATISFACTION OF THE OWNER, ARCHITECT, AND ENGINEER. <br />3.THE CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT, APPARATUS, ACCESSORIES (I.E., THE ENTIRE <br />INSTALLATION) AS FURNISHED BY HIM FOR A PERIOD OF ONE YEAR. THE CONTRACTOR SHALL REPAIR OR <br />REPLACE ANY ITEM WHICH MAY PROVE DEFECTIVE WITHIN ONE (1) YEAR FROM THE DATE THE APPARATUS IS <br />ACCEPTED AND PLACED IN OPERATION WITHOUT ANY ADDITIONAL COST TO THE OWNER. <br />4.THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, AND INSPECTIONS REQUIRED TO <br />COMPLETE THE MECHANICAL WORK. <br />5.BEFORE SUBMITTING BIDS FOR THE WORK, THE CONTRACTOR SHALL MAKE A THOROUGH FIELD SURVEY OF THE <br />WORK TO DETERMINE ANY EXISTING INTERFERENCES THAT MAY AFFECT THE INSTALLATION OF THE WORK. BY <br />THE ACT OF SUBMITTING A BID, THE CONTRACTOR IS DEEMED TO HAVE MADE FIELD SURVEY AND HAS ACCEPTED <br />THE EXISTING CONDITIONS THAT MAY AFFECT HIS WORK. APPOINTMENTS FOR FIELD SURVEY SHALL BE MADE <br />THROUGH THE OWNER REPRESENTATIVE. <br />6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, AND PATCHING TO COMPLETE THE INSTALLATION <br />OF THE MECHANICAL WORK IF APPLICABLE. ALL EXPOSED FINISHED AREAS THAT ARE DAMAGED AS A RESULT OF <br />THIS WORK SHALL BE REPAIRED TO MATCH THE EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. <br />7.ALL CONSTRUCTION SITES SHALL BE PROPERLY PROTECTED WITH BARRICADES, WARNING FLAGS, FENCING, AND <br />LIGHTS AS REQUIRED BY CODE AND THE OWNER'S SECURITY DEPARTMENT. PROVIDE SHORING, BRACING, AND <br />ACCESS LADDERS AS REQUIRED BY CODE. TAKE EXTRA CARE TO INSTRUCT ALL PERSONNEL ON SAFETY <br />PROCEDURES. TAKE CARE TO AVOID DAMAGE TO ADJACENT DUCTWORK, PIPING AND ELECTRIC SERVICES. <br />8.ALL UTILITY SHUT-DOWNS SHALL BE SCHEDULED AT LEAST TWO (2) DAYS IN ADVANCE THROUGH THE OWNER. <br />PROVIDE CONTINUOUS "FIRE WATCH GUARD" TO ALL AREAS AFFECTED BY SHUT-DOWN OF ANY FIRE <br />PROTECTION WATER SERVICE. THE CONTRACTOR'S OPERATION SHALL CAUSE NO UNNECESSARY <br />INCONVENIENCE TO THE BUILDING'S PREMISES. THE ACCESS RIGHTS TO THE PUBLIC SHALL BE CONSIDERED AT <br />ALL TIMES. <br />9.SHOP DRAWINGS AND MATERIAL LISTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AT LEAST THIRTY <br />(30) DAYS PRIOR TO THE START OF ANY WORK. NO WORK INDICATED ON ANY OF THE PLANS OR SHOP DRAWINGS <br />SHALL BE PERFORMED, UNTIL THE SHOP DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER. <br />10.THE CONTRACTOR SHALL SUBMIT TWO (2) COMPLETE SETS OF AS-BUILT DRAWINGS, AND OPERATIONAL AND <br />MAINTENANCE MANUALS TO THE OWNER AS PERMANENT RECORDS AT SUCCESSFUL COMPLETION OF WORK, <br />BEFORE FINAL PAYMENT CAN BE APPROVED BY THE OWNER REPRESENTATIVE. <br />11.ALL EQUIPMENT SHALL BE AS SCHEDULED ON THE PLANS. ANY EQUIPMENT SUBSTITUTION SHALL BE THE <br />CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT IT MEETS ALL THE REQUIREMENTS SUCH AS CAPACITY, <br />DIMENSIONS, ELECTRICAL DATA, ETC. OF THE SPECIFIED EQUIPMENT SHOWN ON THE DRAWINGS. <br />12.DUCTWORK SHALL BE PROVIDED AS FOLLOWS: <br />A.ALL SHEET METAL DUCTWORK SHALL BE NEW GALVANIZED SHEET METAL UNLESS STATED OTHERWISE IN <br />PLANS. DUCT GAUGES, CONSTRUCTION, SUPPORT, SEISMIC RESTRAINT, AND INSTALLATION SHALL BE IN <br />ACCORDANCE WITH THE CALIFORNIA MECHANICAL CODE, 2022 EDITION. <br />B.FLEXIBLE DUCTWORK SHALL BE CASCO "CAL-FLEX" FULLY LINED, UL AND NFPA RATED, INSULATED <br />FIBERGLASS DUCT. FACTORY MADE FLEXIBLE AIR DUCTS AND CONNECTORS SHALL BE NOT MORE THAN FIVE <br />(5) FEET IN LENGTH AND SHALL NOT BE USED IN LIEU OF RIGID ELBOWS OR FITTINGS. [2022 CMC 603.4.1] <br />C.FLEXIBLE DUCT CONNECTIONS SHALL BE PROVIDED FOR ALL DUCTWORK ATTACHED TO AIR MOVING <br />EQUIPMENT. FLEXIBLE CONNECTIONS SHALL BE VENTFABRICS "VENTGLASS LA" TYPE 30 OUNCE CLOSELY <br />WOVEN GLASS FABRIC DOUBLE COATED WITH NEOPRENE. PROVIDE SHEET METAL WEATHERCOVER OVER <br />FLEXIBLE CONNECTIONS EXPOSED TO WEATHER. NOT APPLICABLE TO GREASE DUCTWORK. <br />D.ALL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS SHALL BE SEALED. PRESSURE SENSITIVE TAPE SHALL <br />NOT BE USED AS PRIMARY SEALANT. <br />E.ALL COMBINATION FIRE/SMOKE DAMPERS SHALL BE TESTED AND LISTED UNDER BOTH UL 555 AND UL 555S. <br />UNITS SHALL BE FACTORY SUPPLIED ASSEMBLIES THAT CONSIST OF DAMPER, SLEEVE, AND APPROVED <br />ACTUATOR. DAMPERS SHALL HAVE A MINIMUM CLASS II LEAKAGE AND DYNAMIC CLOSURE RATING UNDER UL <br />555S, POTTORFF MODEL FSD 142 OR APPROVED EQUAL. DAMPERS SHALL BE LIKED TO FIRE ALARM SYSTEM <br />WITH DEDICATED ELECTRICAL POWER. <br />13.DIFFUSERS, REGISTERS, AND GRILLES HAVE BEEN SIZED ON THE BASIS OF MANUFACTURER AND TYPE <br />INDICATED ON THE PLANS. ALL DIFFUSERS, REGISTERS, AND GRILLES SHALL BE LOCATED TO OPERATE WITHOUT <br />OBJECTIONABLE NOISE OR DRAFTS. <br />14.PIPING SHALL BE PROVIDED AS FOLLOWS: <br />A. COPPER TUBING. TYPE "L" (REFRIGERANT LINES): <br />1) PIPING SYST EM SHALL BE ARRANGED TO PREVENT LIQUID REFRIGERANT FROM ENTERING THE <br />COMPRESSOR. PIPING SHALL BE ARRANGED SO OIL WILL RETURN TO THE COMPRESSOR. <br />2) HORIZONTAL SUCTION LINES SHALL SLOPE TOWARD THE COMPRESSOR. AT THE BOTTOM OF EACH RISER <br />SHALL BE A "U" TRAP. <br />3) ALL LINES SHALL BE STRAIGHT AND FREE FROM KINKS OR RESTRICTIONS AND SHALL BE PROPERLY <br />WRAPPED TO MINIMIZE VIBRATIONS. <br />B. ALL SWEAT TYPE COPPER FITTINGS SHALL BE WROUGHT COPPER. ALL ELBOWS AND RETURN BENDS SHALL <br />BE LONG RADIUS TYPE EXCEPT FOR TRAPS IN RISERS WHICH MAY BE FORMED OF SHORT SWEEP STREET ELLS <br />OR SHORT RETURN BENDS OF FACTORY FABRICATED TRAPS SUCH AS MUELLER BRASS CO. "U" TRAPS. <br />C. THE PIPING SHALL BE PLANNED AND ARRANGED TO KEEP THE NUMBER OF FITTINGS AT A MINIMUM AND TO <br />KEEP THE RUNS AS SHORT POSSIBLE. ARRANGE THE PIPING SO THAT NORMAL INSPECTION AND SERVICING OF <br />THE COMPRESSOR AND OTHER EQUIPMENT IS NOT HINDERED. DO NOT OBSTRUCT THE VIEW OF THE CRANK <br />CASE OIL SIGHT GLASS OR RUN PIPING SO IT INTERFERES WITH REMOVAL OF THE COMPRESSOR, ACCESS <br />PLATES, FANS, FAN MOTORS, OR OTHER PARTS. <br />D. FOR REFRIGERANT LINE LENGTHS THAT EXCEED 50 EQUIVALENT FEET, VERIFY REFRIGERANT PIPE SIZING <br />WITH MANUFACTURER. <br />E. ALL PIPING, EXCEPT WHERE EXISTING PIPING IS INDICATED TO BE REUSED, SHALL BE NEW PIPING <br />MATERIALS. PIPING SCHEDULE, MATERIALS, CONSTRUCTION, SUPPORT, SEISMIC RESTRAINT, AND INSTALLATION <br />SHALL BE IN ACCORDANCE WITH THE CALIFORNIA MECHANICAL CODE, 2022 EDITION AND SMACNA "GUIDELINES <br />FOR THE RESTRAINT OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS". <br />F. CONDENSATE DRAIN PIPING SHALL BE TYPE "M" COPPER WITH WROUGHT COPPER FITTINGS FOR 95-5 <br />SOLDER. PLASTIC PIPING IS NOT ACCEPTABLE FOR CONDENSATE DRAIN PIPING. <br />G. FIRE RATED PENETRATION SEALS FOR FLOORS, CEILING AND WALLS SHALL BE PROSET SYSTEM "A" FOR <br />COPPER AND STEEL PIPING. <br />H. PROVIDE PIPE SLEEVES AND ESCUTCHEON PLATES FOR PIPES RUNNING THROUGH WALLS, PARTITIONS, <br />CEILING AND FLOORS EXPOSED TO VIEW. ESCUTCHEON PLATES SHALL BE CHROME PLATED BRASS OR <br />STAINLESS <br />STEEL. <br />15. THERMAL INSULATION FOR DUCTWORK AND PIPING SHALL BE PROVIDED AS FOLLOWS: <br />A.SUPPLY AND RETURN DUCTWORK (WITHOUT DUCT LINER) IN CONCEALED CEILING SPACES SHALL BE WRAPPED <br />AND WIRED WITH MANVILLE "R-SERIES MICROLITE WITH FSK" TYPE FIBERGLASS INSULATION WITH ALUMINUM <br />FOIL VAPOR BARRIER. THE INSULATION SHALL BE 2 INCHES THICK AND 1.5 LB/CU. FT. DENSITY. <br />B.SOUND LINED DUCT AND PLENUM BOXES SIZES SHOWN ON PLANS ARE NET INSIDE DIMENSIONS. DUCT LINER <br />SHALL BE MANVILLE "LINACOUSTIC" TYPE FIBERGLASS DUCT LINER WITH NEOPRENE COATING OR APPROVED <br />EQUAL BY OWENS CORNING. <br />C.CONDENSATE DRAIN PIPING IN CONCEALED CEILING AND WALL SPACES SHALL BE INSULATED WITH AEROTUBE II <br />FLEXIBLE CLOSED CELL PIPING INSULATION. ALL SEAMS AND MITERED JOINTS SHALL BE SEALED WITH <br />BENJAMIN FOSTER 82-31 ADHESIVE. <br />D.REFRIGERANT SUCTION PIPE SHALL BE PROVIDED WITH 1" THICK OWENS CORNING MOLDED FIBERGLASS PIPE <br />INSULATION WITH A FACTORY APPLIED ALL SERVICE (ASJ) VAPOR BARRIER JACKET STAPLED IN PLACE WITH 1/2 <br />INCH GALVANIZED STAPLES SPACED 4 INCHES ON CENTER. LONGITUDINAL AND BUTT JOINTS SHALL BE SEALED <br />WITH BENJAMIN FOSTER 82-31. <br />E.SUPPLIED ASSEMBLIES THAT CONSIST OF DAMPER, SLEEVE AND APPROVED FITTINGS SHALL BE INSULATED BY <br />CUTTING AND MITERING TO SKIP OVER THE CONTROLS. <br />F.FITTING SEALED WITH BENJAMIN FOSTER 82-31 ADHESIVE. <br />G.ALL DUCT/PIPING INSULATION THAT IS EXPOSED TO THE SUN SHALL BE WEATHER PROOF WITH CANVAS <br />JACKET/ ALUMINUM JACKET / PVC WRAP. <br />16. MANUAL VOLUME DAMPERS SHALL BE OPPOSED BLADE TYPE FOR RECTANGULAR DUCTWORK OR BUTTERFLY <br /> TYPE FOR ROUND DUCTWORK. CONSTRUCTION AND INSTALLATION SHALL BE AS DETAILED IN THE SMACNA "LOW <br /> PRESSURE DUCTWORK CONSTRUCTION MANUAL". PROVIDE WITH QUADRANT TYPE SCREW LOCKING HANDLE AND <br /> EXTENSION ARM TO CLEAR INSULATION. <br />A.DUCTS WITH EXTERNAL INSULATION: DAMPER OPERATORS SHALL BE LOCKING QUADRANTS WITH ELEVATED <br />DIAL REGULATOR SPRING END BEARING OR APPROVED EQUAL. <br />B.DUCTS WITH INTERNAL INSULATION: DAMPER OPERATORS SHALL BE LOCKING QUADRANTS WITH SPRING END <br />BEARING OR APPROVED EQUAL. <br />17. AIR EXTRACTOR SHALL BE TITUS AC-35 WITH NO. 3 OPERATOR, KRUEGER EX-8A OR APPROVED EQUAL. <br />18. TURNING VANES SHALL BE AIR FOILED FOR ALL SUPPLY AIR ELBOWS SHARPER THAN 45 DEGREES. SQUARE AND <br />RECTANGULAR ELBOWS SHALL HAVE TURNING VANES. MITER ELBOWS (NOT SQUARE) SHALL HAVE SPLITTER <br />VANES 3 INCHES ON CENTERS. <br />19.THE DRAWING INDICATES IN DIAGRAMMATIC FORM ARRANGEMENTS DESIRED FOR PRINCIPAL APPARATUS, <br />PIPING CONDUIT, ETC., AND SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE. SCALED AND FIGURED DIMENSIONS <br />ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY. OFFSET AND TRANSITION TO AVOID <br />OBSTRUCTIONS IN PATH OF DUCTWORK AND PIPING SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED. <br />BEFORE PROCEEDING WITH ANY WORK, CHECK AND VERIFY EXISTING CONDITIONS, DIMENSIONS, SIZES AND <br />ASSUME FULL RESPONSIBILITY FOR FITTING-IN OF EQUIPMENT AND MATERIALS, (INCLUDING PROVISION FOR <br />OFFSETS, BENDS, ELBOWS, TRANSITIONS, ETC.). <br />20.DUCTWORK, EQUIPMENT, AND PIPING SHALL BE INSTALLED TO RUN PARALLEL OR PERPENDICULAR TO THE <br />BUILDING STRUCTURE AND SHALL BE ARRANGED TO FORM NEAT SYMMETRICAL PATTERNS TO ASSURE THE BEST <br />POSSIBLE APPEARANCE. HANGERS ON PARALLEL ADJACENT PIPING SHALL BE IN LINE WITH EACH OTHER AND <br />PARALLEL TO THE LINES OF THE BUILDING STRUCTURE. ALL PIPING SHALL BE SUPPORTED FROM THE BUILDING <br />STRUCTURE ONLY, NO PIPING SHALL BE SUPPORTED FROM OTHER PIPING OR AIR CONDITIONING DUCTWORK. <br />21.HOLD DUCTWORK TIGHT TO UNDERSIDE OF STRUCTURE ABOVE TO MAXIMIZE FREE SPACE IN CEILING PLENUM. <br />COORDINATE LOCATION OF DUCTWORK AND PIPING TO AVOID CREATING INTERFERENCES WITH OTHER TRADES <br />SUCH AS PLUMBING, ELECTRICAL, LIGHTING, ETC. <br />22.PROVIDE HANGERS TO SUPPORT DUCTWORK AND EQUIPMENT. DUCT AND PIPE HANGER CONSTRUCTION, <br />MATERIALS, ATTACHMENT TO THE STRUCTURE, AND OVERALL INSTALLATION SHALL BE IN ACCORDANCE WITH <br />THE CALIFORNIA MECHANICAL CODE, CALIFORNIA PLUMBING CODE, 2022 EDITION AND SMACNA "GUIDELINES FOR <br />THE RESTRAINT OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS" <br />23.PIPING AND COMPONENTS SHALL BE SPACED SO THAT A THREADED PIPE FITTING MAY BE REMOVED BETWEEN <br />ADJACENT PIPES. NOT LESS THAN 1/2-INCH OF CLEAR SPACE SHALL EXIST BETWEEN THE FINISHED SURFACE <br />AND OTHER WORK, AND BETWEEN FINISHED SURFACE OF PARALLEL ADJACENT PIPING. <br />24.PROVISION AND INSTALLATION OF CONDUIT AND WIRING FOR MECHANICAL CONTROLS AND ITS FINAL <br />CONNECTION TO RELATED CONTROLS SHALL BE THE SOLE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR <br />IN ORDER TO HAVE A COMPLETE AND FUNCTIONAL CONTROL SYSTEM. IT IS ACCEPTABLE FOR MECHANICAL <br />CONTRACTOR TO SUB OUT THIS WORK AS LONG AS THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE FOR <br />ALL RELATED WORK. <br />25.SHEET METAL PLENUMS TO BE FIELD FABRICATED. SUBMIT SHOP DRAWINGS OF CONSTRUCTION TO ENGINEER <br />FOR REVIEW. <br />26.FIRE RATED SEALS SHALL BE PROVIDED AT ALL PENETRATIONS THROUGH FIRE RATED AREAS. <br />27.BALANCE AND ADJUST ALL FANS, DIFFUSERS, REGISTERS AND GRILLES FOR OPTIMUM AIR DISTRIBUTION AND <br />MINIMUM NOISE. SUBMIT A QUALIFIED AIR BALANCE REPORT BY INDEPENDENT AABC REGISTERED AIR BALANCE <br />CONTRACTOR TO THE ENGINEER FOR REVIEW. <br />28.AT THE COMPLETION OF THE WORK, ALL PARTS OF THE INSTALLATION SHALL BE THOROUGHLY CLEANED. ALL <br />FIXTURES, VALVES, PIPES, AND FITTINGS SHALL BE CLEANED OF GREASE, METAL CUTTINGS, SLUDGE, AND <br />OTHER DEBRIS THAT MAY HAVE ACCUMULATED DURING INSTALLATION. <br />29.THE OWNER SHALL BE RESPONSIBLE FOR LEGAL REMOVAL AND OR ABATEMENT OF ASBESTOS INSULATION. <br />CONTACT THE OWNER'S REPRESENTATIVE FOR INSTRUCTIONS, IF ENCOUNTERED IN THE WORK AREA. <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />14 <br />3 <br />0 <br /> <br />E <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />NOVUM <br />A R C H I T E C T U R E, Inc <br />www.novumarchitecture.com <br />OFFICES: SOUTH BAY / ORANGE COUNTY <br />116 S CATALINA AVE. STE. 122, <br />REDONDO BEACH, CA 90277 <br />TEL: 310-383-1827 / 310-709-4476 <br />N <br />AS SHOWN <br />TO <br />M <br />' <br />S <br /> <br />J <br />R <br />DC <br />TT <br />9-1-2023 <br />tom's2023 <br />Mr <br />. <br /> <br />S <br />p <br />i <br />r <br />o <br />s <br /> <br />P <br />o <br />l <br />i <br />t <br />i <br />s <br />No.Description Date <br />1 PC Comments 08/08/2024 <br />2 HlthDep.Corr.2 09/03/2024 <br />MECHANICAL SHEET INDEX <br />Sheet Number Sheet Title REMARKS <br />M-200 MECHANICAL NOTES & SHEET INDEX PC CORR#1 <br />M-201 GENERAL NOTES SYMBOLS & SCHEDULE PC CORR#1 <br />M-202 SCHEDULE PC CORR#1 <br />T-001 TITLE 24 - SHEET 1 PC CORR#1 <br />T-002 TITLE 24 - SHEET 2 PC CORR#1 <br />T-003 TITLE 24 - SHEET 3 PC CORR#1 <br />M-203 MECHANICAL FLOOR PLAN PC CORR#1 <br />M-204 MECHANICAL ROOF PLAN PC CORR#1 <br />M-205 HOOD 1 & 2 ELEVATION PC CORR#1 <br />M-206 HOOD 3 ELEVATION PC CORR#1 <br />M-207 MECHANICAL DETAILS - SHEET 1 PC CORR#1 <br />M-208 MECHANICAL DETAILS - SHEET 2 PC CORR#1 <br />M-209 HOOD DETAILS - SHEET 1 PC CORR#1 <br />M-210 HOOD DETAILS - SHEET 2 PC CORR#1 <br />M-211 HOOD DETAILS - SHEET 3 PC CORR#1 <br />M-212 HOOD DETAILS - SHEET 4 PC CORR#1 <br />M-213 HOOD DETAILS - SHEET 5 PC CORR#1 <br />M-214 HOOD DETAILS - SHEET 6 PC CORR#1 <br />M-215 HOOD DETAILS - SHEET 7 PC CORR#1 <br />M-216 HOOD DETAILS - SHEET 8 PC CORR#1 <br />M-217 HOOD DETAILS - SHEET 9 PC CORR#1 <br />M-218 HOOD DETAILS - SHEET 10 PC CORR#1 <br />M-219 HOOD DETAILS - SHEET 11 PC CORR#1 <br />M-220 HOOD DETAILS - SHEET 12 PC CORR#1 <br />M-221 HOOD DETAILS - SHEET 13 PC CORR#1 <br />MECHANICAL NOTES <br />& SHEET INDEX <br />M-200 <br />SCOPE OF WORK <br />1.PROVIDE NEW PACKAGED GAS/ELECTRIC ROOFTOP UNITS, ASSOCIATED DUCTWORK <br />AND DIFFUSERS. <br />2.PROVIDE CEILING MOUNTED EXHAUST FANS TO ALL RESTROOMS. <br />3.PROVIDE NEW TYPE I HOODS, UTILITY EXHAUST FANS, AND MAKE-UP AIR UNIT FOR <br />KITCHEN VENTILATION. <br />1 <br />1 <br />1 <br />1 <br />1430 E Edinger Ave <br />3/27/2025