MECHANICAL SPECIFICATIONS
<br />30. THE DESIGN ON THE DRAWINGS (ELECTRICAL, STRUCTURAL, ETC.) IS BASED ON THE
<br />MANUFACTURER LISTED. IF THE UNIT IS FURNISHED BY ONE OF THE OTHER LISTED
<br />MANUFACTURERS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
<br />MODIFICATIONS REQUIRED TO INSTALL SUCH MANUFACTURERS UNIT. THIS SHALL
<br />INCLUDE, BUT NOT BE LIMITED TO, INCREASES IN UNIT ELECTRICAL FEEDER SIZES,
<br />SWITCH AND FUSE OR BREAKER SIZES, ETC.
<br />31.ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUIT AND PULL WIRING FOR
<br />CONTROLS. FINAL CONNECTION TO CONTROLS SHALL BE BY MECHANICAL
<br />CONTRACTOR.
<br />32. REFRIGERANT PIPING:
<br />A.ALL REFRIGERANT PIPING SHALL BE REFRIGERATION GRADE TYPE ACR DEGREASED,
<br />SEALED AT MILL COPPER TUBING.
<br />B.CONTRACTOR SHALL FURNISH A SWEAT TYPE COMBINATION SIGHT GLASS AND
<br />MOISTURE INDICATOR. INCLUDE IN THE REFRIGERATION PIPING A FILTER/DRYER.
<br />C.A SWEAT TYPE 3 WAY VALVE SHALL BE INSTALLED IN THE LIQUID LINE FOR CHARGING
<br />AND EVACUATING.
<br />D.HANGERS AND SUPPORTS:
<br />1)ALL TUBING SHALL BE SECURELY SUPPORTED AND ANCHORED WITH "UNISTRUT"
<br />OR EQUAL CLAMPS AND CHANNELS; RUBBER GROMMETS SHALL BE USED
<br />BETWEEN TUBING AND CLAMPS TO PROTECT THE TUBING FROM POSSIBLE
<br />RUBBING.
<br />33. CHARGING:
<br />A.THE PROPER AMOUNT OF REFRIGERANT SHALL BE CHARGED INTO THE SYSTEM
<br />THROUGH THE LIQUID LINE. THE OIL LEVEL SHALL BE CHECKED AND OIL EITHER ADDED
<br />OR REMOVED TO BRING THE LEVEL IN THE COMPRESSOR TO THE MIDDLE OF THE
<br />SIGHT GLASS.
<br />B.BEFORE ANY MOTORS ARE OPERATED, THE LUBRICATION SHALL BE CHECKED AND OIL
<br />OR GAS ADDED WHERE NECESSARY.
<br />1.THE WORK SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING LEGALLY
<br />CONSTITUTED AUTHORITIES AND CODES HAVING JURISDICTION.
<br />2.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR, EQUIPMENT, APPURTENANCES, AND OTHER
<br />CONTRACTUAL EXPENSES REQUIRED FOR THE COMPLETE INSTALLATION OF THE MECHANICAL WORK TO THE
<br />SATISFACTION OF THE OWNER, ARCHITECT, AND ENGINEER.
<br />3.THE CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT, APPARATUS, ACCESSORIES (I.E., THE ENTIRE
<br />INSTALLATION) AS FURNISHED BY HIM FOR A PERIOD OF ONE YEAR. THE CONTRACTOR SHALL REPAIR OR
<br />REPLACE ANY ITEM WHICH MAY PROVE DEFECTIVE WITHIN ONE (1) YEAR FROM THE DATE THE APPARATUS IS
<br />ACCEPTED AND PLACED IN OPERATION WITHOUT ANY ADDITIONAL COST TO THE OWNER.
<br />4.THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, AND INSPECTIONS REQUIRED TO
<br />COMPLETE THE MECHANICAL WORK.
<br />5.BEFORE SUBMITTING BIDS FOR THE WORK, THE CONTRACTOR SHALL MAKE A THOROUGH FIELD SURVEY OF THE
<br />WORK TO DETERMINE ANY EXISTING INTERFERENCES THAT MAY AFFECT THE INSTALLATION OF THE WORK. BY
<br />THE ACT OF SUBMITTING A BID, THE CONTRACTOR IS DEEMED TO HAVE MADE FIELD SURVEY AND HAS ACCEPTED
<br />THE EXISTING CONDITIONS THAT MAY AFFECT HIS WORK. APPOINTMENTS FOR FIELD SURVEY SHALL BE MADE
<br />THROUGH THE OWNER REPRESENTATIVE.
<br />6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, AND PATCHING TO COMPLETE THE INSTALLATION
<br />OF THE MECHANICAL WORK IF APPLICABLE. ALL EXPOSED FINISHED AREAS THAT ARE DAMAGED AS A RESULT OF
<br />THIS WORK SHALL BE REPAIRED TO MATCH THE EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
<br />7.ALL CONSTRUCTION SITES SHALL BE PROPERLY PROTECTED WITH BARRICADES, WARNING FLAGS, FENCING, AND
<br />LIGHTS AS REQUIRED BY CODE AND THE OWNER'S SECURITY DEPARTMENT. PROVIDE SHORING, BRACING, AND
<br />ACCESS LADDERS AS REQUIRED BY CODE. TAKE EXTRA CARE TO INSTRUCT ALL PERSONNEL ON SAFETY
<br />PROCEDURES. TAKE CARE TO AVOID DAMAGE TO ADJACENT DUCTWORK, PIPING AND ELECTRIC SERVICES.
<br />8.ALL UTILITY SHUT-DOWNS SHALL BE SCHEDULED AT LEAST TWO (2) DAYS IN ADVANCE THROUGH THE OWNER.
<br />PROVIDE CONTINUOUS "FIRE WATCH GUARD" TO ALL AREAS AFFECTED BY SHUT-DOWN OF ANY FIRE
<br />PROTECTION WATER SERVICE. THE CONTRACTOR'S OPERATION SHALL CAUSE NO UNNECESSARY
<br />INCONVENIENCE TO THE BUILDING'S PREMISES. THE ACCESS RIGHTS TO THE PUBLIC SHALL BE CONSIDERED AT
<br />ALL TIMES.
<br />9.SHOP DRAWINGS AND MATERIAL LISTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AT LEAST THIRTY
<br />(30) DAYS PRIOR TO THE START OF ANY WORK. NO WORK INDICATED ON ANY OF THE PLANS OR SHOP DRAWINGS
<br />SHALL BE PERFORMED, UNTIL THE SHOP DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER.
<br />10.THE CONTRACTOR SHALL SUBMIT TWO (2) COMPLETE SETS OF AS-BUILT DRAWINGS, AND OPERATIONAL AND
<br />MAINTENANCE MANUALS TO THE OWNER AS PERMANENT RECORDS AT SUCCESSFUL COMPLETION OF WORK,
<br />BEFORE FINAL PAYMENT CAN BE APPROVED BY THE OWNER REPRESENTATIVE.
<br />11.ALL EQUIPMENT SHALL BE AS SCHEDULED ON THE PLANS. ANY EQUIPMENT SUBSTITUTION SHALL BE THE
<br />CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT IT MEETS ALL THE REQUIREMENTS SUCH AS CAPACITY,
<br />DIMENSIONS, ELECTRICAL DATA, ETC. OF THE SPECIFIED EQUIPMENT SHOWN ON THE DRAWINGS.
<br />12.DUCTWORK SHALL BE PROVIDED AS FOLLOWS:
<br />A.ALL SHEET METAL DUCTWORK SHALL BE NEW GALVANIZED SHEET METAL UNLESS STATED OTHERWISE IN
<br />PLANS. DUCT GAUGES, CONSTRUCTION, SUPPORT, SEISMIC RESTRAINT, AND INSTALLATION SHALL BE IN
<br />ACCORDANCE WITH THE CALIFORNIA MECHANICAL CODE, 2022 EDITION.
<br />B.FLEXIBLE DUCTWORK SHALL BE CASCO "CAL-FLEX" FULLY LINED, UL AND NFPA RATED, INSULATED
<br />FIBERGLASS DUCT. FACTORY MADE FLEXIBLE AIR DUCTS AND CONNECTORS SHALL BE NOT MORE THAN FIVE
<br />(5) FEET IN LENGTH AND SHALL NOT BE USED IN LIEU OF RIGID ELBOWS OR FITTINGS. [2022 CMC 603.4.1]
<br />C.FLEXIBLE DUCT CONNECTIONS SHALL BE PROVIDED FOR ALL DUCTWORK ATTACHED TO AIR MOVING
<br />EQUIPMENT. FLEXIBLE CONNECTIONS SHALL BE VENTFABRICS "VENTGLASS LA" TYPE 30 OUNCE CLOSELY
<br />WOVEN GLASS FABRIC DOUBLE COATED WITH NEOPRENE. PROVIDE SHEET METAL WEATHERCOVER OVER
<br />FLEXIBLE CONNECTIONS EXPOSED TO WEATHER. NOT APPLICABLE TO GREASE DUCTWORK.
<br />D.ALL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS SHALL BE SEALED. PRESSURE SENSITIVE TAPE SHALL
<br />NOT BE USED AS PRIMARY SEALANT.
<br />E.ALL COMBINATION FIRE/SMOKE DAMPERS SHALL BE TESTED AND LISTED UNDER BOTH UL 555 AND UL 555S.
<br />UNITS SHALL BE FACTORY SUPPLIED ASSEMBLIES THAT CONSIST OF DAMPER, SLEEVE, AND APPROVED
<br />ACTUATOR. DAMPERS SHALL HAVE A MINIMUM CLASS II LEAKAGE AND DYNAMIC CLOSURE RATING UNDER UL
<br />555S, POTTORFF MODEL FSD 142 OR APPROVED EQUAL. DAMPERS SHALL BE LIKED TO FIRE ALARM SYSTEM
<br />WITH DEDICATED ELECTRICAL POWER.
<br />13.DIFFUSERS, REGISTERS, AND GRILLES HAVE BEEN SIZED ON THE BASIS OF MANUFACTURER AND TYPE
<br />INDICATED ON THE PLANS. ALL DIFFUSERS, REGISTERS, AND GRILLES SHALL BE LOCATED TO OPERATE WITHOUT
<br />OBJECTIONABLE NOISE OR DRAFTS.
<br />14.PIPING SHALL BE PROVIDED AS FOLLOWS:
<br />A. COPPER TUBING. TYPE "L" (REFRIGERANT LINES):
<br />1) PIPING SYST EM SHALL BE ARRANGED TO PREVENT LIQUID REFRIGERANT FROM ENTERING THE
<br />COMPRESSOR. PIPING SHALL BE ARRANGED SO OIL WILL RETURN TO THE COMPRESSOR.
<br />2) HORIZONTAL SUCTION LINES SHALL SLOPE TOWARD THE COMPRESSOR. AT THE BOTTOM OF EACH RISER
<br />SHALL BE A "U" TRAP.
<br />3) ALL LINES SHALL BE STRAIGHT AND FREE FROM KINKS OR RESTRICTIONS AND SHALL BE PROPERLY
<br />WRAPPED TO MINIMIZE VIBRATIONS.
<br />B. ALL SWEAT TYPE COPPER FITTINGS SHALL BE WROUGHT COPPER. ALL ELBOWS AND RETURN BENDS SHALL
<br />BE LONG RADIUS TYPE EXCEPT FOR TRAPS IN RISERS WHICH MAY BE FORMED OF SHORT SWEEP STREET ELLS
<br />OR SHORT RETURN BENDS OF FACTORY FABRICATED TRAPS SUCH AS MUELLER BRASS CO. "U" TRAPS.
<br />C. THE PIPING SHALL BE PLANNED AND ARRANGED TO KEEP THE NUMBER OF FITTINGS AT A MINIMUM AND TO
<br />KEEP THE RUNS AS SHORT POSSIBLE. ARRANGE THE PIPING SO THAT NORMAL INSPECTION AND SERVICING OF
<br />THE COMPRESSOR AND OTHER EQUIPMENT IS NOT HINDERED. DO NOT OBSTRUCT THE VIEW OF THE CRANK
<br />CASE OIL SIGHT GLASS OR RUN PIPING SO IT INTERFERES WITH REMOVAL OF THE COMPRESSOR, ACCESS
<br />PLATES, FANS, FAN MOTORS, OR OTHER PARTS.
<br />D. FOR REFRIGERANT LINE LENGTHS THAT EXCEED 50 EQUIVALENT FEET, VERIFY REFRIGERANT PIPE SIZING
<br />WITH MANUFACTURER.
<br />E. ALL PIPING, EXCEPT WHERE EXISTING PIPING IS INDICATED TO BE REUSED, SHALL BE NEW PIPING
<br />MATERIALS. PIPING SCHEDULE, MATERIALS, CONSTRUCTION, SUPPORT, SEISMIC RESTRAINT, AND INSTALLATION
<br />SHALL BE IN ACCORDANCE WITH THE CALIFORNIA MECHANICAL CODE, 2022 EDITION AND SMACNA "GUIDELINES
<br />FOR THE RESTRAINT OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS".
<br />F. CONDENSATE DRAIN PIPING SHALL BE TYPE "M" COPPER WITH WROUGHT COPPER FITTINGS FOR 95-5
<br />SOLDER. PLASTIC PIPING IS NOT ACCEPTABLE FOR CONDENSATE DRAIN PIPING.
<br />G. FIRE RATED PENETRATION SEALS FOR FLOORS, CEILING AND WALLS SHALL BE PROSET SYSTEM "A" FOR
<br />COPPER AND STEEL PIPING.
<br />H. PROVIDE PIPE SLEEVES AND ESCUTCHEON PLATES FOR PIPES RUNNING THROUGH WALLS, PARTITIONS,
<br />CEILING AND FLOORS EXPOSED TO VIEW. ESCUTCHEON PLATES SHALL BE CHROME PLATED BRASS OR
<br />STAINLESS
<br />STEEL.
<br />15. THERMAL INSULATION FOR DUCTWORK AND PIPING SHALL BE PROVIDED AS FOLLOWS:
<br />A.SUPPLY AND RETURN DUCTWORK (WITHOUT DUCT LINER) IN CONCEALED CEILING SPACES SHALL BE WRAPPED
<br />AND WIRED WITH MANVILLE "R-SERIES MICROLITE WITH FSK" TYPE FIBERGLASS INSULATION WITH ALUMINUM
<br />FOIL VAPOR BARRIER. THE INSULATION SHALL BE 2 INCHES THICK AND 1.5 LB/CU. FT. DENSITY.
<br />B.SOUND LINED DUCT AND PLENUM BOXES SIZES SHOWN ON PLANS ARE NET INSIDE DIMENSIONS. DUCT LINER
<br />SHALL BE MANVILLE "LINACOUSTIC" TYPE FIBERGLASS DUCT LINER WITH NEOPRENE COATING OR APPROVED
<br />EQUAL BY OWENS CORNING.
<br />C.CONDENSATE DRAIN PIPING IN CONCEALED CEILING AND WALL SPACES SHALL BE INSULATED WITH AEROTUBE II
<br />FLEXIBLE CLOSED CELL PIPING INSULATION. ALL SEAMS AND MITERED JOINTS SHALL BE SEALED WITH
<br />BENJAMIN FOSTER 82-31 ADHESIVE.
<br />D.REFRIGERANT SUCTION PIPE SHALL BE PROVIDED WITH 1" THICK OWENS CORNING MOLDED FIBERGLASS PIPE
<br />INSULATION WITH A FACTORY APPLIED ALL SERVICE (ASJ) VAPOR BARRIER JACKET STAPLED IN PLACE WITH 1/2
<br />INCH GALVANIZED STAPLES SPACED 4 INCHES ON CENTER. LONGITUDINAL AND BUTT JOINTS SHALL BE SEALED
<br />WITH BENJAMIN FOSTER 82-31.
<br />E.SUPPLIED ASSEMBLIES THAT CONSIST OF DAMPER, SLEEVE AND APPROVED FITTINGS SHALL BE INSULATED BY
<br />CUTTING AND MITERING TO SKIP OVER THE CONTROLS.
<br />F.FITTING SEALED WITH BENJAMIN FOSTER 82-31 ADHESIVE.
<br />G.ALL DUCT/PIPING INSULATION THAT IS EXPOSED TO THE SUN SHALL BE WEATHER PROOF WITH CANVAS
<br />JACKET/ ALUMINUM JACKET / PVC WRAP.
<br />16. MANUAL VOLUME DAMPERS SHALL BE OPPOSED BLADE TYPE FOR RECTANGULAR DUCTWORK OR BUTTERFLY
<br /> TYPE FOR ROUND DUCTWORK. CONSTRUCTION AND INSTALLATION SHALL BE AS DETAILED IN THE SMACNA "LOW
<br /> PRESSURE DUCTWORK CONSTRUCTION MANUAL". PROVIDE WITH QUADRANT TYPE SCREW LOCKING HANDLE AND
<br /> EXTENSION ARM TO CLEAR INSULATION.
<br />A.DUCTS WITH EXTERNAL INSULATION: DAMPER OPERATORS SHALL BE LOCKING QUADRANTS WITH ELEVATED
<br />DIAL REGULATOR SPRING END BEARING OR APPROVED EQUAL.
<br />B.DUCTS WITH INTERNAL INSULATION: DAMPER OPERATORS SHALL BE LOCKING QUADRANTS WITH SPRING END
<br />BEARING OR APPROVED EQUAL.
<br />17. AIR EXTRACTOR SHALL BE TITUS AC-35 WITH NO. 3 OPERATOR, KRUEGER EX-8A OR APPROVED EQUAL.
<br />18. TURNING VANES SHALL BE AIR FOILED FOR ALL SUPPLY AIR ELBOWS SHARPER THAN 45 DEGREES. SQUARE AND
<br />RECTANGULAR ELBOWS SHALL HAVE TURNING VANES. MITER ELBOWS (NOT SQUARE) SHALL HAVE SPLITTER
<br />VANES 3 INCHES ON CENTERS.
<br />19.THE DRAWING INDICATES IN DIAGRAMMATIC FORM ARRANGEMENTS DESIRED FOR PRINCIPAL APPARATUS,
<br />PIPING CONDUIT, ETC., AND SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE. SCALED AND FIGURED DIMENSIONS
<br />ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY. OFFSET AND TRANSITION TO AVOID
<br />OBSTRUCTIONS IN PATH OF DUCTWORK AND PIPING SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED.
<br />BEFORE PROCEEDING WITH ANY WORK, CHECK AND VERIFY EXISTING CONDITIONS, DIMENSIONS, SIZES AND
<br />ASSUME FULL RESPONSIBILITY FOR FITTING-IN OF EQUIPMENT AND MATERIALS, (INCLUDING PROVISION FOR
<br />OFFSETS, BENDS, ELBOWS, TRANSITIONS, ETC.).
<br />20.DUCTWORK, EQUIPMENT, AND PIPING SHALL BE INSTALLED TO RUN PARALLEL OR PERPENDICULAR TO THE
<br />BUILDING STRUCTURE AND SHALL BE ARRANGED TO FORM NEAT SYMMETRICAL PATTERNS TO ASSURE THE BEST
<br />POSSIBLE APPEARANCE. HANGERS ON PARALLEL ADJACENT PIPING SHALL BE IN LINE WITH EACH OTHER AND
<br />PARALLEL TO THE LINES OF THE BUILDING STRUCTURE. ALL PIPING SHALL BE SUPPORTED FROM THE BUILDING
<br />STRUCTURE ONLY, NO PIPING SHALL BE SUPPORTED FROM OTHER PIPING OR AIR CONDITIONING DUCTWORK.
<br />21.HOLD DUCTWORK TIGHT TO UNDERSIDE OF STRUCTURE ABOVE TO MAXIMIZE FREE SPACE IN CEILING PLENUM.
<br />COORDINATE LOCATION OF DUCTWORK AND PIPING TO AVOID CREATING INTERFERENCES WITH OTHER TRADES
<br />SUCH AS PLUMBING, ELECTRICAL, LIGHTING, ETC.
<br />22.PROVIDE HANGERS TO SUPPORT DUCTWORK AND EQUIPMENT. DUCT AND PIPE HANGER CONSTRUCTION,
<br />MATERIALS, ATTACHMENT TO THE STRUCTURE, AND OVERALL INSTALLATION SHALL BE IN ACCORDANCE WITH
<br />THE CALIFORNIA MECHANICAL CODE, CALIFORNIA PLUMBING CODE, 2022 EDITION AND SMACNA "GUIDELINES FOR
<br />THE RESTRAINT OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS"
<br />23.PIPING AND COMPONENTS SHALL BE SPACED SO THAT A THREADED PIPE FITTING MAY BE REMOVED BETWEEN
<br />ADJACENT PIPES. NOT LESS THAN 1/2-INCH OF CLEAR SPACE SHALL EXIST BETWEEN THE FINISHED SURFACE
<br />AND OTHER WORK, AND BETWEEN FINISHED SURFACE OF PARALLEL ADJACENT PIPING.
<br />24.PROVISION AND INSTALLATION OF CONDUIT AND WIRING FOR MECHANICAL CONTROLS AND ITS FINAL
<br />CONNECTION TO RELATED CONTROLS SHALL BE THE SOLE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR
<br />IN ORDER TO HAVE A COMPLETE AND FUNCTIONAL CONTROL SYSTEM. IT IS ACCEPTABLE FOR MECHANICAL
<br />CONTRACTOR TO SUB OUT THIS WORK AS LONG AS THE MECHANICAL CONTRACTOR WILL BE RESPONSIBLE FOR
<br />ALL RELATED WORK.
<br />25.SHEET METAL PLENUMS TO BE FIELD FABRICATED. SUBMIT SHOP DRAWINGS OF CONSTRUCTION TO ENGINEER
<br />FOR REVIEW.
<br />26.FIRE RATED SEALS SHALL BE PROVIDED AT ALL PENETRATIONS THROUGH FIRE RATED AREAS.
<br />27.BALANCE AND ADJUST ALL FANS, DIFFUSERS, REGISTERS AND GRILLES FOR OPTIMUM AIR DISTRIBUTION AND
<br />MINIMUM NOISE. SUBMIT A QUALIFIED AIR BALANCE REPORT BY INDEPENDENT AABC REGISTERED AIR BALANCE
<br />CONTRACTOR TO THE ENGINEER FOR REVIEW.
<br />28.AT THE COMPLETION OF THE WORK, ALL PARTS OF THE INSTALLATION SHALL BE THOROUGHLY CLEANED. ALL
<br />FIXTURES, VALVES, PIPES, AND FITTINGS SHALL BE CLEANED OF GREASE, METAL CUTTINGS, SLUDGE, AND
<br />OTHER DEBRIS THAT MAY HAVE ACCUMULATED DURING INSTALLATION.
<br />29.THE OWNER SHALL BE RESPONSIBLE FOR LEGAL REMOVAL AND OR ABATEMENT OF ASBESTOS INSULATION.
<br />CONTACT THE OWNER'S REPRESENTATIVE FOR INSTRUCTIONS, IF ENCOUNTERED IN THE WORK AREA.
<br />Scale
<br />Date
<br />Drawn By
<br />Checked By
<br />Project Number
<br />14
<br />3
<br />0
<br />
<br />E
<br />
<br />E
<br />D
<br />I
<br />N
<br />G
<br />E
<br />R
<br />
<br />A
<br />V
<br />E
<br />,
<br />
<br />S
<br />A
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />5
<br />NOVUM
<br />A R C H I T E C T U R E, Inc
<br />www.novumarchitecture.com
<br />OFFICES: SOUTH BAY / ORANGE COUNTY
<br />116 S CATALINA AVE. STE. 122,
<br />REDONDO BEACH, CA 90277
<br />TEL: 310-383-1827 / 310-709-4476
<br />N
<br />AS SHOWN
<br />TO
<br />M
<br />'
<br />S
<br />
<br />J
<br />R
<br />DC
<br />TT
<br />9-1-2023
<br />tom's2023
<br />Mr
<br />.
<br />
<br />S
<br />p
<br />i
<br />r
<br />o
<br />s
<br />
<br />P
<br />o
<br />l
<br />i
<br />t
<br />i
<br />s
<br />No.Description Date
<br />1 PC Comments 08/08/2024
<br />2 HlthDep.Corr.2 09/03/2024
<br />MECHANICAL SHEET INDEX
<br />Sheet Number Sheet Title REMARKS
<br />M-200 MECHANICAL NOTES & SHEET INDEX PC CORR#1
<br />M-201 GENERAL NOTES SYMBOLS & SCHEDULE PC CORR#1
<br />M-202 SCHEDULE PC CORR#1
<br />T-001 TITLE 24 - SHEET 1 PC CORR#1
<br />T-002 TITLE 24 - SHEET 2 PC CORR#1
<br />T-003 TITLE 24 - SHEET 3 PC CORR#1
<br />M-203 MECHANICAL FLOOR PLAN PC CORR#1
<br />M-204 MECHANICAL ROOF PLAN PC CORR#1
<br />M-205 HOOD 1 & 2 ELEVATION PC CORR#1
<br />M-206 HOOD 3 ELEVATION PC CORR#1
<br />M-207 MECHANICAL DETAILS - SHEET 1 PC CORR#1
<br />M-208 MECHANICAL DETAILS - SHEET 2 PC CORR#1
<br />M-209 HOOD DETAILS - SHEET 1 PC CORR#1
<br />M-210 HOOD DETAILS - SHEET 2 PC CORR#1
<br />M-211 HOOD DETAILS - SHEET 3 PC CORR#1
<br />M-212 HOOD DETAILS - SHEET 4 PC CORR#1
<br />M-213 HOOD DETAILS - SHEET 5 PC CORR#1
<br />M-214 HOOD DETAILS - SHEET 6 PC CORR#1
<br />M-215 HOOD DETAILS - SHEET 7 PC CORR#1
<br />M-216 HOOD DETAILS - SHEET 8 PC CORR#1
<br />M-217 HOOD DETAILS - SHEET 9 PC CORR#1
<br />M-218 HOOD DETAILS - SHEET 10 PC CORR#1
<br />M-219 HOOD DETAILS - SHEET 11 PC CORR#1
<br />M-220 HOOD DETAILS - SHEET 12 PC CORR#1
<br />M-221 HOOD DETAILS - SHEET 13 PC CORR#1
<br />MECHANICAL NOTES
<br />& SHEET INDEX
<br />M-200
<br />SCOPE OF WORK
<br />1.PROVIDE NEW PACKAGED GAS/ELECTRIC ROOFTOP UNITS, ASSOCIATED DUCTWORK
<br />AND DIFFUSERS.
<br />2.PROVIDE CEILING MOUNTED EXHAUST FANS TO ALL RESTROOMS.
<br />3.PROVIDE NEW TYPE I HOODS, UTILITY EXHAUST FANS, AND MAKE-UP AIR UNIT FOR
<br />KITCHEN VENTILATION.
<br />1
<br />1
<br />1
<br />1
<br />1430 E Edinger Ave
<br />3/27/2025
|