Laserfiche WebLink
© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />BI <br />M <br /> <br />3 <br />6 <br />0 <br />: <br />/ <br />/ <br />0 <br />0 <br />7 <br />. <br />3 <br />7 <br />5 <br />7 <br />. <br />0 <br />0 <br />0 <br /> <br />- <br /> <br />C <br />a <br />r <br />i <br />b <br />o <br />u <br /> <br />I <br />n <br />d <br />u <br />s <br />t <br />r <br />i <br />e <br />s <br /> <br />- <br /> <br />3 <br />r <br />d <br /> <br />& <br /> <br />B <br />r <br />o <br />a <br />d <br />w <br />a <br />y <br />/ <br />3 <br />R <br />D <br />- <br />B <br />_ <br />A <br />R <br />C <br />H <br />_ <br />W <br />E <br />S <br />T <br />_ <br />R <br />2 <br />0 <br />. <br />r <br />v <br />t <br />07.3757.000 <br />3rd & Broadway <br />301 N. Broadway, Santa Ana, CA <br />09/21/2021 Issue for Plan Check <br />A 12/10/2021 Reissue for Plan Check <br />B 07/11/2022 Reissue for Plan Check <br />C 06/17/2024 REVISION TO PERMIT <br />R1-SP-102 <br />POOL & SPA EQUIPMENT PLAN <br />S <br />CIRCULATION EQUIPMENTC <br />SANITATION EQUIPMENT <br />NOTE: PUMP VIBRATION ISOLATORS: SEE: SP-504 DETAIL 1. (QTY. 1 PER PUMP) <br />C1.CIRCULATION PUMP - POOL (P-1): PENTAIR POOL PRODUCT. MODEL: <br />WHISPERFLOXF VS, #022035, 5 HP,THREE PHASE, 208V, 13 AMPS, (QTY. 1). <br />C2.CIRCULATION PUMP - SPA (P-2): PENTAIR POOL PRODUCT. MODEL: <br />WHISPERFLOXF VS, #022035, 5 HP, THREE PHASE, 208V, 13 AMPS. (QTY. 1) <br />C3.CIRCULATION FILTERS - POOL: PENTAIR POOL PRODUCT. MODEL: TRITON <br />SAND, 4.9 SQFT, TR100C, #140315, (QTY. 1) SEE: SP-504 DETAIL 2 <br />C4.CIRCULATION FILTERS - SPA: PENTAIR POOL PRODUCT. MODEL: TRITON <br />SAND, 7.0 SQFT, TR140C, #140316, (QTY. 1)* FILTER MOUNTING ANCHORS, <br />SEE: SHEET SP-504 DETAIL 2, BACKWASH VALVE, FULL FLOW XF MODEL <br />#263010, (QTY. 1) <br />C5. HEATER - POOL & SPA: PENTAIR POOL PRODUCT - GAS FIRED MODEL ETi 400 <br />#46113, INPUT RATING OF 400,000 BTU/HR, NATURAL GAS. 120V, 4.0 AMPS, <br />WATER CONNECTION: 2-INCH NPT, GAS: 3/4-INCH NPT. SEE: SHEET SP-503, <br />DETAIL 5, 11, 12, 16 (QTY. 2) <br />C6.BOOSTER PUMP - SPA (P-3): PENTAIR POOL PRODUCT. MODEL: <br />WHISPERFLOXF VS, #022035, 5 HP, 208V, 13 AMPS. (QTY. 1). <br />S1.CHEMISTRY CONTROLLER - POOL & SPA: PENTAIR; COMMERCIAL <br />INTELLICHEM, #521357. SEE: SHEET SP-503, DETAIL 1. (QTY. 2) <br />S2.SECONDARY SANITIZER; API: E-Z POOL PRO & REVIVE PRO: CONTRACTOR <br />TO SUPPLY THE FOLLOWING: 20 LB. EZP20 WITH 30 GALLON CHEMICAL <br />TANK AND CHEMICAL FEED PUMP (E), WITH FLANGED MOUNT MIXER PN# <br />42821. (QTY. 1 EACH) CONTACT DAVE STUART (DAVES@APIWATER.COM) <br />PH: 561 339 4192. SEE: SHEET SP-503, DETAIL 4. (QTY. 2) <br />S3.CHLORINE & PH ACID CONTROL PUMPS: PRODUCT OF STENNER PUMP <br />COMPANY. MODEL #45MPH10, UP TO 10 GALLONS PER DAY. SEE: SP-503 <br />DETAIL 2 & 3 (QTY. 2 - 1 BACKUP) <br />S4.FEED TANKS: PRODUCT OF ASSMANN, MODEL #IMT 20, 20 GALLON, <br />DOUBLE WALL, CLOSED TOP, 40 CFR-264.193. SEE: SP-503, DETAIL 2 & 3 <br />(QTY. 2) <br />S5. CHEMICAL SEPARATION WALL: CONSTRUCTED WITH FIRE RESISTANT <br />MATERIALS PER DETAIL COORDINATE FINAL SIZE IN EQUIPMENT ROOM, <br />SEE SHEET SP-503, DETAIL 6. <br />S6.EYEWASH STATION: HAWS, MODEL# 7460 OR EQUAL PER MEP.SEE SHEET <br />SP-504, DETAIL 12. <br />S7. FILTER BACKWASH RISER: CONNECTION TO SEWER PROVIDED BY MEP, <br />PROVIDE 6" MIN. AIR GAP, SEE: SHEET SP-503, DETAIL 9. <br />V1.PRESSURE-VACUUM GAUGES: PRODUCT OF SUPER PRO. MODEL <br />#SPG-06-1001 (PRESSURE) & SPG-06-1008 (PRESSURE) INDUSTRIAL <br />GAUGE WITH 2" DIAL, 316 S.S CASE, GLYCERIN FILLED. RANGE OF 0-60 PSI <br />FOR PRESSURE, AND 0-30 INCHES OF MERCURY FOR VACUUM.SEE: <br />SHEET SP-503, DETAIL 15 (QTY. 6) <br />V2.DIVERTER VALVES: PENTAIR. 2.5-INCH TO 3-INCH, 2-PORT AND 2.5" TO 3", <br />3-PORT. MAX PRESSURE OF 50 PSI. (QTY. PER PLAN) <br />V3.FLOW METER/CHECK VALVE: PRODUCT OF H2FLOW. MODEL #FLOWVIS. <br />(QTY. 2) SEE: SHEET SP-503 DETAIL 8. <br />V4.BALL VALVES: ASAHI. MODEL TYPE: TRUE UNION, 1-INCH TO 3-INCH, WITH <br />VITON SEALS AND TEFLON SEATS. (QTY. AS NEEDED) <br />V5.BACK-FLOW PREVENTER: RPZ COORDINATED ITEM PROVIDED BY MEP. <br />ONE FOR EACH AUTO FILL SYSTEM, SEE: SHEET SP-503, DETAIL 8 (QTY. 2) <br />VALVES & GAUGESV <br />E1.INTELLICENTER CONTROL: POWER CENTER - #522042, i10D <br />PERSONALITY KIT - #521915, ESO BUTTON WITH ALARM - #ESO2, SPA <br />BUTTON - #RCS1, #MODESO ESO PCB. (QTY. 1) <br />E2.HEATER EM. OFF SWITCH:COORDINATE FINAL LOCATION NEAR DOOR <br />AS REQUIRED BY THE CMC, SEE HEATER NOTES ON SP-503, DETAIL 5 <br />(QTY. 1) <br />ELECTRICALE <br />PIPE ELEMENTSPE <br />PE1. PIPE MOUNTING: STAINLESS STEEL UNI-STRUT WITH 1/2" S.S. NUT AND <br />SQUARE WASHERS. SEE: SHEET SP-503, DETAIL 1 & 2. [NOT SHOWN] <br />PE2. VAULT PENETRATION SEAL: LINK SEAL; COORDINATE PENETRATION SIZE IN <br />VAULT WITH SEAL TYPE, SEE: SHEET SP-503, DETAIL 3. [NOT SHOWN] <br />PE3. FLOOR PENETRATION SEAL: FIRE RATED PER FLOOR REQUIREMENTS <br />COORDINATE, SEE: SHEET SP-505 DETAIL 1. [NOT SHOWN] <br />Scale: 1/2" = 1' <br />POOL & SPA PUMP ROOM - 6TH FLOOR - (ENLARGED PLAN)1 <br />CHEMICAL EQUIPMENT: <br />CE1. POOL EQUIPMENT ROOM SIGNS & SAFETY EQUIPMENT [NOT SHOWN] <br /> POOL CHEMICAL SIGNS; PRODUCT OF COMPLIANCY SIGNS: <br /> DANGER - AUTHORIZED PERSONNEL ONLY - #CUSTOM <br /> DANGER - HAZARDOUS POOL CHEMICALS - #ODE-7756 <br /> 704 SIGN - SODIUM HYPOCHLORITE (NAOCL) W/ CAS# - 7681-52-9 <br /> 704 SIGN - MURIATIC ACID ONLY (HCL) W/ CAS# - 7647-01-0 <br />CE2. EQUIPMENT ROOM SAFETY EQUIPMENT [NOT SHOWN] <br /> RESPIRATOR MASK: U-LINE, 3M HALF-FACE MASK - #H-1081 <br /> SAFETY GLASSES: OTG, CLEAR - #S-17940 <br /> NEOPRENE CHEMICAL RESISTANT APRON: U-LINE - #S-18815 <br /> NEOPRENE CHEMICAL RESISTANT GLOVES: ULINE - #S-11434 <br /> TESTING KIT; RECREONICS #56-192. TAYLOR COMPLETE 2005 <br />CE <br />EQUIPMENT NOTES: <br />1.THE EQUIPMENT SHALL BE SET ON A 6" MIN. CONCRETE HOUSE-KEEPING <br />PAD THAT POSITIVELY SLOPES TOWARD THE FLOOR DRAINAGE SYSTEM, <br />PAD INSTALLED BY OTHERS. <br />2.THE EYE-WASH STATION IS FOR COORDINATION ONLY, INSTALLED AND <br />PROVIDED BY OTHERS. <br />3.THE HEATER SHALL BE PROVIDED WITH A SYSTEM THAT DETECTS AND <br />MONITORS CARBON MONOXIDE IN THE EQUIPMENT ROOM, PROVIDED <br />AND INSTALLED BY OTHERS. <br />4.ADDITIONAL ITEMS INSTALLED BY OTHERS: CHEMICAL WALL, BACKWASH <br />STANDPIPE, BACK-FLOW DEVICE, HEATER VENTING, HEATER PRESSURE <br />RELIEF DRAIN AND ROUTING. FLOOR DRAIN, CO ALARM. <br />5.EQUIPMENT 3D ISOMETRIC IS FOR DIAGRAM ONLY. INSTALL MAY VARY <br />UPON FINAL SITE CONDITIONS. <br />6.G.C. TO PROVIDE GFCI PROTECTED 110V OUTLETS IN POOL EQUIPMENT <br />AREA FOR GENERAL MAINTENANCE USE . <br />7.ACCESSIBILITY. ALL FILTERS, VALVES, PUMPS, STRAINERS AND <br />EQUIPMENT REQUIRING ADJUSTMENT SHALL BE READILY ACCESSIBLE <br />FOR REPAIR AND REPLACEMENT. <br />8.RECIRCULATION PIPING SYSTEM AND COMPONENTS - PIPING SYSTEMS, <br />INCLUDING ALL PARTS AND FITTINGS OTHER THAN INLET DEVICES OR <br />VENTURI THROATS, SHALL BE SIZED SO THAT THE FLOW VELOCITY SHALL <br />NOT EXCEED 10 FEET PER SECOND, EXCEPTING THAT THE FLOW <br />VELOCITY SHALL NOT EXCEED 8 FEET PER SECOND IN ANY COPPER <br />PIPING OR IN ANY PUMP SUCTION PIPING. <br />9.PROVIDE LABELING FOR CHEMICAL LINES, EVERY CHANGE OF <br />DIRECTION, PENETRATION AND 20' LABEL WITH CHEMICAL MANE AND <br />DIRECTION OF FLOW. <br />10.PROVIDE ONE 704 PLACARD ON ENTRY DOOR OF POOL EQUIPMENT ROOM <br />TO INCLUDE CHEMICALS IN ROOM. <br />11.CHEMICAL CONTAINERS TO BE LABELED WITH PROPER CHEMICAL NAME <br />AND CONCENTRATION. <br />Scale: NTS <br />POOL & SPA PUMP ROOM - 6TH FLOOR - EQUIPMENT ISO3 <br />Scale: NTS <br />POOL & SPA PUMP ROOM - 6TH FLOOR - EQUIPMENT ISO2 <br />HEATER VENTING/INTAKE <br />BY OTHERS <br />C4 <br />C3 <br />C3 <br />C2 <br />C1 <br />C6 <br />C4 <br />C6 <br />C2 <br />C1 <br />C5 <br />C5 <br />HEATER VENTING/INTAKE <br />BY OTHERS <br />S1 <br />S1 <br />S7 <br />V5 <br />S5 <br />S5 <br />S6 <br />S6 <br />S2 <br />C5 <br />C5 <br />S3 <br />S3 <br />S2 <br />V5 <br />V1 <br />V3 <br />E2 E1 <br />S5 <br />FLOOR DRAIN <br />BY OTHERS <br />FLOOR SINK BY OTHERS <br />ELECTRICAL PANEL <br />& 3FT SETBACK <br />C <br />Jun 04, 2024 <br />1/7/25