Laserfiche WebLink
© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />BI <br />M <br /> <br />3 <br />6 <br />0 <br />: <br />/ <br />/ <br />0 <br />0 <br />7 <br />. <br />3 <br />7 <br />5 <br />7 <br />. <br />0 <br />0 <br />0 <br /> <br />- <br /> <br />C <br />a <br />r <br />i <br />b <br />o <br />u <br /> <br />I <br />n <br />d <br />u <br />s <br />t <br />r <br />i <br />e <br />s <br /> <br />- <br /> <br />3 <br />r <br />d <br /> <br />& <br /> <br />B <br />r <br />o <br />a <br />d <br />w <br />a <br />y <br />/ <br />3 <br />R <br />D <br />- <br />B <br />_ <br />A <br />R <br />C <br />H <br />_ <br />W <br />E <br />S <br />T <br />_ <br />R <br />2 <br />0 <br />. <br />r <br />v <br />t <br />07.3757.000 <br />3rd & Broadway <br />301 N. Broadway, Santa Ana, CA <br />09/21/2021 Issue for Plan Check <br />A 12/10/2021 Reissue for Plan Check <br />B 07/11/2022 Reissue for Plan Check <br />C 06/17/2024 REVISION TO PERMIT <br />R1-SP-103 <br />POOL & SPA PLUMBING PLAN <br />POOL CIRCULATION SYSTEM - SCH. 80 PVC - 75 GPM <br />PP1.MAIN DRAIN CIRCULATION SUCTION TRUNK : <br />212" - 75 GPM - 100% MAX. FLOW @ 5.7 FPS < 6 FPS <br />PP2.GUTTER CIRCULATION SUCTION TRUNK: <br />212" - 75 GPM - 100% MAX. FLOW @ 5.7 FPS < 6.0 FPS <br />PP3.GUTTER SUCTION LOOP: <br />2" - 37.5 GPM - 50% MAX. FLOW @ 4.4 FPS < 6.0 FPS <br />PP4.CIRCULATION INLET TRUNK: <br />212" - 75 GPM - 100% MAX. FLOW @ 5.7 FPS < 8.0 FPS <br />PP5.CIRCULATION INLET LOOP: <br />2" - 37.5 GPM - 50% MAX. FLOW @ 4.4 FPS < 8.0 FPS <br />SPA CIRCULATION SYSTEM - SCH. 80 PVC - 150 GPM <br />SP1.MAIN DRAIN CIRCULATION SUCTION TRUNK : <br />4" - 150 GPM - 100% MAX. FLOW @ 4.2 FPS < 6.0 FPS <br />SP2.GUTTER CIRCULATION SUCTION TRUNK: <br />4" - 150 GPM - 100% MAX. FLOW @ 4.2 FPS < 6.0 FPS <br />SP3.GUTTER CIRCULATION LOOP: <br />2 12" - 75 GPM - 50% MAX. FLOW @ 5.7 FPS < 6.0 FPS <br />SP4.CIRCULATION INLET TRUNK: <br />3" - 150 GPM - 100% MAX. FLOW @ 7.3 FPS < 8.0 FPS <br />SP5.CIRCULATION INLET LOOP: <br />2 12" - 75 GPM - 50% MAX. FLOW @ 5.7 FPS < 8.0 FPS <br />SPA BOOSTER SYSTEM - SCH. 80 PVC - 150 GPM <br />SP6.MAIN DRAIN BOOSTER SUCTION TRUNK : <br />4" - 150 GPM - 100% MAX. FLOW @ 4.2 FPS < 6.0 FPS <br />SP7.SPA BOOSTER INLET TRUNK: <br />3" - 150 GPM - 100% MAX. FLOW @ 7.3 FPS < 8.0 FPS <br />SP8.SPA BOOSTER INLET LOOP: <br />2 12" - 75 GPM - 50% MAX. FLOW @ 5.7 FPS < 8.0 FPS <br />SP9.SPA AIRLINE LOOP : 112" - SEE: SHEET SP-502 DETAIL 16 <br />PLUMBING AND CONDUITS <br />LP1.LIGHT CONDUIT (QTY. 3): 1" MIN. - PVC - SEE: SHEET SP-502 DETAIL 3 <br />LP2.1" COLD WATER SUPPLY: ONE PER POOL AND SPA (SEPARATE LINE) <br />Scale: 1/4" = 1' <br />POOL & SPA - 7TH FLOOR - (PLUMBING PLAN)1 <br />PP3PP5 <br />PP2PP1 <br />PP4 <br />SP6SP2 <br />SP7SP1SP4 <br />SP3SP9SP5SP8 <br />AIRLINE TRUNK, <br />RISER LOCATED <br />IN PLANTER <br />C <br />Jun 04, 2024 <br />1/7/25