Laserfiche WebLink
P-1 <br />P-1 POOL CIRCULATION PUMP <br />PENTAIR WHISPERFLOXF VS #022035 <br />5 HP, 208V, THREE PHASE, 13 AMPS <br />SET AT 75 GPM <br />MAIN DRAIN SYSTEM <br />TRUNK: 2.5" PVC, 75 GPM @ 5.7 FPS <br />EACH WAY: 2" PVC, 37.5 GPM @ 4.4 FPS <br /> (QTY. 2) <br />SUCTION LOOP <br />2" PVC, 37.5 GPM @ 4.4 FPS <br />PENTAIR TR-100C SAND FILTER <br />4.91 SQFT EACH (QTY. 1) <br />PSI RELIEF <br />3/4" GAS <br />CONDENSATE DRAIN <br />GUTTER GRATE SUCTION SYSTEM <br />TRUNK: 2.5" PVC, 75 GPM @ 5.7 FPS <br />LOOP: 2" PVC, 37.5 GPM @ 4.4 FPS <br />RISERS: 2" PVC, 7.5 GPM @ .87 FPS (QTY. 10) <br />RETURN LOOP <br />2" PVC, 37.5 GPM @ 4.4 FPS <br />WALL INLET SYSTEM <br />TRUNK: 2.5" PVC, 75 GPM @ 5.7 FPS <br />LOOP: 2" PVC, 37.5 GPM @ 4.4 FPS <br />RISERS: 1.5" PVC, 7.5 GPM @ 1.5 FPS (QTY. 10) <br />ORP PH <br />CHEMICAL CONTROLLER TO BE ELECTRICALLY <br />INTERLOCKED WITH CIRCULATION PUMP <br />THROUGH RELAY IN INTELLICENTER <br />CHLORINE TANKACID TANKEZPOOL PRO SYSTEM <br />(POOL & SPA) <br />OPTIONAL BYPASS FOR <br />FUTURE SOLAR HEATING <br />TO BACKWASH <br />RISER <br />1" (POOL) <br />1" (POOL) <br />J-BOX <br />TRANS <br />POOL LIGHTING SYSTEM <br />18W, 12V LIGHTS (QTY. 2) <br />INTELLICENTER <br />ADA LIFT BATTERY <br />PROVIDE DEDICATED <br />OUTLET FOR CHARGING <br />115V GFCI OUTLET <br />1" (SPA) <br />HEAVY DUTY FLOAT VALVE <br />IN GUTTER W/ BYPASS FILL <br />2.5" PVC, 75 GPM @ 5.7 FPS <br />P-2 <br />P-2 SPA CIRCULATION PUMP <br />PENTAIR WHISPERFLOXF VS #022035 <br />5 HP, 208V, THREE PHASE, 13 AMPS <br />SET AT 150 GPM <br />MAIN DRAIN SYSTEM <br />TRUNK: 4" PVC, 150 GPM @ 4.2 FPS <br />EACH WAY: 4" PVC, 75 GPM @ 2.1 FPS <br /> (QTY. 2) <br />SUCTION LOOP <br />2.5" PVC, 75 GPM @ 5.7 FPS <br />PENTAIR TR-140C SAND FILTER <br />7.06 SQFT EACH (QTY. 1) <br />PSI RELIEF <br />3/4" GAS <br />CONDENSATE DRAIN <br />RETURN LOOP <br />2.5" PVC, 75 GPM @ 5.7 FPS <br />ORP PH <br />CHEMICAL CONTROLLER TO BE ELECTRICALLY <br />INTERLOCKED WITH CIRCULATION PUMP <br />THROUGH RELAY IN INTELLICENTER <br />CHLORINE TANKACID TANK <br />3" PVC, 150 GPM @ 7.3 FPS <br />EZPOOL PRO SYSTEM <br />(POOL & SPA) <br />3" PVC, 150 GPM @ 7.3 FPS <br />OPTIONAL BYPASS FOR <br />FUTURE SOLAR HEATING <br />TO BACKWASH <br />RISER <br />1" (POOL) <br />1" (POOL) <br />J-BOX <br />TRANS <br />SPA LIGHTING SYSTEM <br />18W, 12V LIGHTS (QTY. 1) <br />INTELLICENTER <br />1" (SPA) <br />HEAVY DUTY FLOAT VALVE <br />IN GUTTER W/ BYPASS FILL <br />P-3 <br />RETURN LOOP <br />2.5" PVC, 75 GPM @ 5.7 FPS <br />MAIN DRAIN SYSTEM <br />TRUNK: 4" PVC, 150 GPM @ 4.2 FPS <br />EACH WAY: 4" PVC, 75 GPM @ 2.1 FPS <br /> (QTY. 2) <br />P-3 SPA JET PUMP <br />PENTAIR WHISPERFLOXF VS #022035 <br />5 HP, 208V, THREE PHASE, 13 AMPS <br />SET AT 150 GPM <br />JET INLET SYSTEM <br />TRUNK: 3" PVC, 150 GPM @ 7.3 FPS <br />LOOP: 2.5" PVC, 75 GPM @ 5.7 FPS <br />RISERS: 1.5" PVC, 25 GPM @ 4.6 (QTY. 10) <br />SPA WATER LINE <br />2" REMOTE AIR <br />RISER <br />COORDINATE ALL PIPE <br />PENETRATION LOCATIONS <br />AND SLEEVED PENETRATION <br />TYPE IN STRUCTURE VAULT <br />G.C. BEFORE WORK <br />PRESSURE GROUT WITH <br />NON-SHRINK GROUT THEN USE <br />LOW VISCOSITY EPOXY POLYGEM <br />1001-SLV TO FILL REMAINING <br />VOIDS. SUBMIT GROUT TO <br />ARCHITECT FOR COORDINATION <br />POOL VAULT WALL <br />PIPE SIZE VARIES <br />NOTE: <br />1.DETAIL IS FOR COORDINATION ONLY, CONTRACTOR TO COORDINATE WITH G.C. AND BUILDING STRUCTURAL <br />ENGINEER. POOL CONTRACTOR FINAL SUBMIT DESIGN. LINK SEALS WILL BE CONSIDERED AS ALTERNATE DESIGN. <br />LINK SEAL PENETRATION SEAL <br />WATER-PROOFING BY OTHERS <br />VA <br />R <br />I <br />E <br />S <br />WALL ASSEMBLY - STUDS <br />& FIRE RATE GYPSUM PER <br />ARCHITECTURAL SHEETS <br />FILL, VOID, CAVITY WITH <br />FIRE-STOP SYSTEM. <br />INSTALL TO COMPLETELY <br />FILL THE ANNULAR SPACE <br />BETWEEN THE PIPES AND <br />GYPSUM WALLBOARD ON <br />BOTH SIDES OF WALL <br />SECTION FRONT VIEW <br />NOTE: <br />1. PIPE SHALL BE RIGIDLY SUPPORTED ON BOTH SIDES OF THE FLOOR OR WALL ASSEMBLY. <br />2. FILL VOID WITH FIRE-STOP SYSTEM SHALL BE EQUAL TO HOURLY FIRE RATED WALL ASSEMBLY <br />FOR WHICH IT IS INSTALLED <br />3/ <br />4 <br />" <br /> <br />M <br />I <br />N <br /> <br />- <br /> <br />1 <br />- <br />1 <br />/ <br />4 <br />" <br /> <br />M <br />A <br />X <br />. <br />4" MAX. <br />CONCRETE FLOOR - FIRE RATE <br />PER ARCHITECTURAL SHEETS <br />FILL, VOID, CAVITY WITH FIRE-STOP <br />SYSTEM. INSTALL TO COMPLETELY FILL <br />THE ANNULAR SPACE BETWEEN THE PIPES <br />AND CONCRETE FLOOR ON BOTH SIDES <br />NOTE: <br />1. PIPE SHALL BE FIRE-STOP SYSTEM SHALL BE ON BOTH SIDES OF THE FLOOR OR WALL ASSEMBLY. <br />2. FILL VOID WITH FIRE-STOP SYSTEM SHALL BE EQUAL TO HOURLY FIRE RATED FLOOR ASSEMBLY <br />FOR WHICH IT IS INSTALLED. <br />3/16" MIN - 5/16" MAX. <br />4- <br />1 <br />/ <br />2 <br />" <br /> <br />M <br />I <br />N <br />. <br />3" MAX.PER STRUCTURAL <br />EQUAL <br />FL <br />A <br />N <br />G <br />E <br />PI <br />P <br />E <br /> <br />Ø <br />SHOTCRETE WALL OR FLOOR <br />HEAT OR SOLVENT WELDED <br />PVC FLANGE TO COUPLING <br />PIPE SIZES FLANGE WIDTH <br />12" TO 3" <br />4" TO 6" <br />PER STRUCTURAL <br />EQUAL <br />FL <br />A <br />N <br />G <br />E <br />PI <br />P <br />E <br /> <br />Ø <br />SHOTCRETE WALL OR FLOOR <br />HEAT OR SOLVENT WELDED <br />PVC FLANGE TO COUPLING <br />PIPE SIZES FLANGE WIDTH <br />12" TO 3" <br />4" TO 6"1 12" <br /> 12" <br />POOL PIPE SHALL BE ATTACHED TO UNDERSIDE <br />OF STRUCTURAL DECK, SUPPORT PIPE PER IPC. <br />PIPE SHALL BE SUPPORTED IN ACCORDANCE <br />WITH TABLE 308.5. THE CONTRACTOR SHALL <br />SUBMIT SUPPORT SYSTEM DESIGN TO <br />ARCHITECT BEFORE START OF THIS WORK. <br />COORDINATE FINAL LOCATIONS OF PIPE <br />PENETRATIONS THROUGH STRUCTURAL <br />VAULT, COORDINATE PENETRATION <br />DESIGN WITH STRUCTURAL ENGINEER. <br />CAULK BOTH SIDES OF PENETRATION <br />LEVEL (2) STRUCTURAL SLAB <br />PIPE INSULATION AS <br />REQUIRED PER CODE <br />COORDINATE ANCHOR <br />CONNECTION WITH <br />BUILDING STRUCTURAL <br />NOTE: <br />1.POOL PIPE INSTALLED IN A PLENUM OR SUBJECT TO FREEZING SHALL BE INSULATED PER SPECIFICATION. <br />2.POOL PIPE RUNNING THROUGH BUILDING EXPANSION JOINT AREAS SHALL BE INSTALLED WITH <br />APPROVED RUBBER PIPE EXPANSION JOINTS WITHSTANDING CHEMICALLY TREATED WATER. <br />HOLDRITE SILENCER <br />CLAMPS ACOUSTICAL <br />TRAPEZE MEMBER <br />(DOUBLE STRUT) <br />STRUCTURAL DECK ABOVE <br />COORDINATE CONNECTION <br />STRUCTURE ATTACHMENT <br />PIPE SIZE VARIES <br />NOTE: <br />1.DETAIL IS FOR COORDINATION ONLY, CONTRACTOR TO SUBMIT DESIGN. <br />2.CONTRACTOR TO SUBMIT DESIGN LOAD SIZING PER FINAL LAYOUT. <br />3.THE PIPE OR CONDUIT LOADS ON THE TRAPEZE SYSTEM SHOULD BE RELATIVELY UNIFORM AND SYMMETRICAL <br />ALONG THE LENGTH OF THE MEMBER. <br />LON <br />G <br />I <br />T <br />U <br />D <br />I <br />N <br />A <br />L <br /> <br />B <br />R <br />A <br />C <br />E <br />1/2" ALL THREAD ROD <br />SIZE AS REQUIRED <br />COORDINATE FINAL TRAPEZE LENGTH <br />CO <br />O <br />R <br />D <br />I <br />N <br />A <br />T <br />E <br />45 <br />° <br />HOLDRITE <br />ACOUSTICAL <br />PIPE SUPPORT <br />NOTE: <br />1.DETAIL IS FOR COORDINATION ONLY, COORDINATE FINAL PIPE ROUTING WITH GENERAL CONTRACTOR AND SUBMIT <br />SHOP DRAWING FOR FINAL DESIGN APPROVAL TO BUILDING STRUCTURAL ENGINEER. <br />2.THE PIPE OR CONDUIT LOADS ON THE UNI-STRUT SYSTEM SHOULD BE RELATIVELY UNIFORM AND SYMMETRICAL <br />ALONG THE LENGTH OF THE MEMBER. <br />2-1/2 <br /> <br />S <br />U <br />C <br />T <br />I <br />O <br />N <br />1" C <br />O <br />L <br />D <br /> <br />W <br />A <br />T <br />E <br />R <br />2-1/2 <br /> <br />S <br />U <br />C <br />T <br />I <br />O <br />N <br />2-1/2 <br /> <br />R <br />E <br />T <br />U <br />R <br />N <br />COORDINATE PENETRATION WITH <br />BUILDING STRUCTURAL ENGINEER, <br />SEE DETAIL 5 ON THIS SHEET <br /> MOUNTING HARDWARE <br />ON STRUCTURAL DECK <br />POOL PLUMBING PER PLAN <br />SECURE PIPING TO <br />MOUNTING HARDWARE <br />SEE PIPING PLAN FOR VAULT <br />PENETRATION LOCATIONS <br />DECK MOUNTING HARDWARE <br />45° POOL PIPE AS <br />NEEDED OVER <br />PLUMBING LINES <br />POOL VAULT PER STRUCTURAL <br />BOTTOM OF SLAB <br />LEVER-OPERATED <br />BUTTERFLY VALVE <br />TRUE UNION BALL VALVE <br />GCFI POWER <br />FLOW METER <br />SOLENOID <br />BACKFLOW PREVENTOR <br />UNDERWATER LIGHT <br />SCHEMATIC LEGEND <br />CHECK VALVE <br />PIPE CAP <br />TEMPERATURE SENSOR <br />NEUTRALIZER <br />VACUUM RELIEF VALVE <br />2-WAY MULTIPORT VALVE <br />PRESSURE / VACUUM GAGUE <br />3-WAY MULTIPORT VALVE <br />WALL INLET SYSTEM <br />TRUNK: 3" PVC, 150 GPM @ 7.3 FPS <br />LOOP: 2.5" PVC, 75 GPM @ 5.7 FPS <br />RISERS: 1.5" PVC, 25 GPM @ 4.6 FPS(QTY. 6) <br />Scale: N.T.S. <br />POOL - CIRCULATION SYSTEM (SCHEMATIC)9 Scale: NTS <br />SPA - CIRCULATION SYSTEM (SCHEMATIC)10 <br />Scale: 1-1/2" = 1' <br />VAULT PIPE PENETRATIONS4Scale: 1" = 1' <br />PLASTIC PIPE THROUGH FIRE RATED WALL2Scale: NTS <br />PLASTIC PIPE THROUGH CONCRETE FLOOR1 Scale: NTS <br />CONCRETE PIPE FLANGES (SECTION)3 <br />Scale:3/4"= 1 FT. <br />PIPE ROUTING (SECTION)6Scale: NTS <br />PIPE HANGERS (SCHEMATIC)5 Scale: NTS <br />PIPE & CONDUIT ROUTING (ISOMETRIC)8Scale: NTS <br />SLAB MOUNTED PIPE ROUTING (SECTION)7 <br />© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />BI <br />M <br /> <br />3 <br />6 <br />0 <br />: <br />/ <br />/ <br />0 <br />0 <br />7 <br />. <br />3 <br />7 <br />5 <br />7 <br />. <br />0 <br />0 <br />0 <br /> <br />- <br /> <br />C <br />a <br />r <br />i <br />b <br />o <br />u <br /> <br />I <br />n <br />d <br />u <br />s <br />t <br />r <br />i <br />e <br />s <br /> <br />- <br /> <br />3 <br />r <br />d <br /> <br />& <br /> <br />B <br />r <br />o <br />a <br />d <br />w <br />a <br />y <br />/ <br />3 <br />R <br />D <br />- <br />B <br />_ <br />A <br />R <br />C <br />H <br />_ <br />W <br />E <br />S <br />T <br />_ <br />R <br />2 <br />0 <br />. <br />r <br />v <br />t <br />07.3757.000 <br />3rd & Broadway <br />301 N. Broadway, Santa Ana, CA <br />09/21/2021 Issue for Plan Check <br />A 12/10/2021 Reissue for Plan Check <br />B 07/11/2022 Reissue for Plan Check <br />C 06/17/2024 REVISION TO PERMIT <br />R1-SP-505CC <br />Jun 04, 2024 <br />1/7/25