My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />SUMMARY 011000 - 2 <br />C. Architect: DLR Group. <br />1.4 WORK COVERED BY CONTRACT DOCUMENTS <br />A. The Work of Project is defined by the Contract Documents and consists of the following: <br />1. New site improvements. Specific scope includes, but is not limited, to the following: <br />a. New artificial turf field. <br />b. New lunch shelter. <br />c. New playground structure and fence enclosure. <br />d. New asphalt basketball courts and play areas. <br />e. Site ornamental fencing. <br />f. New entrance courtyard in front of administration building. <br />g. New drop off and waiting area. <br />h. New signage along McFadden Ave. <br />B. Type of Contract: <br />1. Project will be constructed under a single prime contract (per AIA document A133- <br />2019). <br />1.5 WORK BY OWNER <br />A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering <br />with or delaying work under this Contract or work by Owner. Coordinate the Work of this <br />Contract with work performed by Owner. <br />1.6 OWNER-FURNISHED PRODUCTS <br />A. Owner will furnish products indicated. The Work includes receiving, unloading, handling, <br />storing, protecting, and installing Owner-furnished products and making building services <br />connections. <br />B. Owner-Furnished Products: <br />1. As noted in Owner Furnished Material and Equipment Schedule in drawing set. <br />1.7 ACCESS TO SITE <br />A. General: Contractor shall have access to the Project site during the construction period <br />according to AIA document A133-2019. <br />1.8 WORK RESTRICTIONS <br />A. Work Restrictions, General: Comply with restrictions on construction operations.
The URL can be used to link to this page
Your browser does not support the video tag.