Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />SUMMARY 011000 - 3 <br />1. Comply with limitations on use of public streets and with other requirements of <br />authorities having jurisdiction. <br />B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or <br />others unless permitted under the following conditions and then only after providing temporary <br />utility services according to requirements indicated: <br />1. Notify Owner not less than two days in advance of proposed utility interruptions. <br />2. Obtain Owner's written permission before proceeding with utility interruptions. <br />C. Restricted Substances: Use of tobacco products and other controlled substances on Project site <br />is not permitted. <br />D. Employee Identification: Provide identification tags for Contractor personnel working on <br />Project site. Require personnel to use identification tags at all times. <br />E. Employee Screening: Comply with Owner's requirements for screening of Contractor personnel <br />working on Project site. <br />1. Maintain list of approved screened personnel with Owner's representative. <br />2. Badging to be provided by contractor. <br />1.9 SPECIFICATION AND DRAWING CONVENTIONS <br />A. Specification Content: The Specifications use certain conventions for the style of language and <br />the intended meaning of certain terms, words, and phrases when used in particular situations. <br />These conventions are as follows: <br />1. Imperative mood and streamlined language are generally used in the Specifications. The <br />words "shall," "shall be," or "shall comply with," depending on the context, are implied <br />where a colon (:) is used within a sentence or phrase. <br />2. Specification requirements are to be performed by Contractor unless specifically stated <br />otherwise. <br />B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work <br />of all Sections in the Specifications. <br />C. Drawing Coordination: Requirements for materials and products identified on Drawings are <br />described in detail in the Specifications. One or more of the following are used on Drawings to <br />identify materials and products: <br />1. Terminology: Materials and products are identified by the typical generic terms used in <br />the individual Specifications Sections. <br />2. Abbreviations: Materials and products are identified by abbreviations published as part of <br />the U.S. National CAD Standard and scheduled on Drawings.