Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />PAYMENT PROCEDURES 012900 - 1 <br />SECTION 012900 - PAYMENT PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements necessary to prepare and process <br />Applications for Payment. <br />B. Related Requirements: <br />1. Section 012600 "Contract Modification Procedures" for administrative procedures for <br />handling changes to the Contract. <br />2. Section 013200 "Construction Progress Documentation" for administrative requirements <br />governing the preparation and submittal of the Contractor's construction schedule. <br />1.3 DEFINITIONS <br />A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract <br />Sum to various portions of the Work and used as the basis for reviewing Contractor's <br />Applications for Payment. <br />1.4 SCHEDULE OF VALUES <br />A. Format and Content: Use Project Manual table of contents as a guide to establish line items for <br />the schedule of values. Provide at least one line item for each Specification Section. <br />1. Identification: Include the following Project identification on the schedule of values: <br />a. Project name and location. <br />b. Name of Architect. <br />c. Architect's Project number. <br />d. Contractor's name and address. <br />e. Date of submittal. <br />2. Arrange the schedule of values in tabular form, with separate columns to indicate the <br />following for each item listed: <br />a. Related Specification Section or Division. <br />b. Description of the Work.