Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />PROJECT MANAGEMENT AND COORDINATION 013100 - 1 <br />SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative provisions for coordinating construction operations on Project <br />including, but not limited to, the following: <br />1. General coordination procedures. <br />2. Coordination drawings. <br />3. RFIs. <br />4. Digital project management procedures. <br />5. Project meetings. <br />B. Related Requirements: <br />1. Section 013200 "Construction Progress Documentation" for preparing and submitting <br />Contractor's construction schedule. <br />2. Section 017700 "Closeout Procedures" for coordinating closeout of the Contract. <br />1.3 DEFINITIONS <br />A. BIM: Building Information Modeling. <br />B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking <br />information required by or clarifications of the Contract Documents. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each <br />portion of the Work, including those who are to furnish products or equipment fabricated to a <br />special design. Include the following information in tabular form: <br />1. Name, address, telephone number, and email address of entity performing subcontract or <br />supplying products. <br />2. Number and title of related Specification Section(s) covered by subcontract. <br />3. Drawing number and detail references, as appropriate, covered by subcontract.