My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />PROJECT MANAGEMENT AND COORDINATION 013100 - 2 <br />B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key <br />personnel assignments, including superintendent and other personnel in attendance at Project <br />site. Provide organizational chart and chain of command. Identify individuals and their duties <br />and responsibilities; list addresses and cellular telephone numbers and e-mail addresses. Provide <br />names, addresses, and telephone numbers of individuals assigned as alternates in the absence of <br />individuals assigned to Project. <br />1. Post copies of list in project meeting room, in temporary field office, in web-based <br />Project software directory, and in prominent location in built facility. Keep list current at <br />all times. <br />1.5 GENERAL COORDINATION PROCEDURES <br />A. Coordination: Coordinate construction operations included in different Sections of the <br />Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate <br />construction operations included in different Sections that depend on each other for proper <br />installation, connection, and operation. <br />1. Schedule construction operations in sequence required to obtain the best results where <br />installation of one part of the Work depends on installation of other components, before <br />or after its own installation. <br />2. Coordinate installation of different components to ensure maximum performance and <br />accessibility for required maintenance, service, and repair. <br />3. Make adequate provisions to accommodate items scheduled for later installation. <br />B. Prepare memoranda for distribution to each party involved, outlining special procedures <br />required for coordination. Include such items as required notices, reports, and list of attendees at <br />meetings. <br />1. Prepare similar memoranda for Owner and separate contractors if coordination of their <br />Work is required. <br />C. Administrative Procedures: Coordinate scheduling and timing of required administrative <br />procedures with other construction activities to avoid conflicts and to ensure orderly progress of <br />the Work. Such administrative activities include, but are not limited to, the following: <br />1. Preparation of Contractor's construction schedule. <br />2. Preparation of the schedule of values. <br />3. Installation and removal of temporary facilities and controls. <br />4. Delivery and processing of submittals. <br />5. Progress meetings. <br />6. Pre-installation conferences. <br />7. Project closeout activities. <br />8. Startup and adjustment of systems.
The URL can be used to link to this page
Your browser does not support the video tag.