Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />PROJECT MANAGEMENT AND COORDINATION 013100 - 8 <br />i. Procedures for RFIs. <br />j. Procedures for testing and inspecting. <br />k. Procedures for processing Applications for Payment. <br />l. Distribution of the Contract Documents. <br />m. Submittal procedures. <br />n. Preparation of Record Documents. <br />o. Use of the premises. <br />p. Work restrictions. <br />q. Working hours. <br />r. Owner's occupancy requirements. <br />s. Responsibility for temporary facilities and controls. <br />t. Procedures for moisture and mold control. <br />u. Procedures for disruptions and shutdowns. <br />v. Construction waste management and recycling. <br />w. Parking availability. <br />x. Office, work, and storage areas. <br />y. Equipment deliveries and priorities. <br />z. First aid. <br />aa. Security. <br />3. Minutes: Entity responsible for conducting meeting will record and distribute meeting <br />minutes. <br />C. Pre-installation Conferences: Conduct a pre-installation conference at Project site before each <br />construction activity when required by other sections and when required for coordination with <br />other construction. <br />1. Attendees: Installer and representatives of manufacturers and fabricators involved in or <br />affected by the installation and its coordination or integration with other materials and <br />installations that have preceded or will follow, shall attend the meeting. Advise <br />Architect and Owner's Commissioning Authority of scheduled meeting dates. <br />2. Agenda: Review progress of other construction activities and preparations for the <br />particular activity under consideration, including requirements for the following: <br />a. Contract Documents. <br />b. Options. <br />c. Related RFIs. <br />d. Related Change Orders. <br />e. Purchases. <br />f. Deliveries. <br />g. Submittals. <br />h. Sustainable design requirements. <br />i. Review of mockups. <br />j. Possible conflicts. <br />k. Compatibility requirements. <br />l. Time schedules. <br />m. Weather limitations. <br />n. Manufacturer's written instructions. <br />o. Warranty requirements. <br />p. Compatibility of materials.