Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />QUALITY REQUIREMENTS 014000 - 4 <br />D. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to <br />demonstrate their capabilities and experience. Include proof of qualifications in the form of a <br />recent report on the inspection of the testing agency by a recognized authority. <br />E. Schedule of Tests and Inspections: Prepare in tabular form and include the following: <br />1. Specification Section number and title. <br />2. Entity responsible for performing tests and inspections. <br />3. Description of test and inspection. <br />4. Identification of applicable standards. <br />5. Identification of test and inspection methods. <br />6. Number of tests and inspections required. <br />7. Time schedule or time span for tests and inspections. <br />8. Requirements for obtaining samples. <br />9. Unique characteristics of each quality-control service. <br />F. Reports: Prepare and submit certified written reports and documents as specified. <br />G. Permits, Licenses, and Certificates: For Owner's record, submit copies of permits, licenses, <br />certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee <br />payments, judgments, correspondence, records, and similar documents established for <br />compliance with standards and regulations bearing on performance of the Work. <br />1.8 CONTRACTOR'S QUALITY-CONTROL PLAN <br />A. Quality-Control Plan, General: Submit quality-control plan within 10 days of Notice to Proceed, <br />and not less than five days prior to preconstruction conference. Submit in format acceptable to <br />Architect. Identify personnel, procedures, controls, instructions, tests, records, and forms to be <br />used to carry out Contractor's quality-assurance and quality-control responsibilities. Coordinate <br />with Contractor's Construction Schedule. <br />B. Quality-Control Personnel Qualifications: Engage qualified personnel trained and experienced <br />in managing and executing quality-assurance and quality-control procedures similar in nature <br />and extent to those required for Project. <br />1. Project quality-control manager may also serve as Project superintendent. <br />C. Submittal Procedure: Describe procedures for ensuring compliance with requirements through <br />review and management of submittal process. Indicate qualifications of personnel responsible <br />for submittal review. <br />D. Testing and Inspection: In quality-control plan, include a comprehensive schedule of Work <br />requiring testing or inspection, including the following: <br />1. Contractor-performed tests and inspections including Subcontractor-performed tests and <br />inspections. Include required tests and inspections and Contractor-elected tests and <br />inspections. Distinguish source quality-control tests and inspections from field quality- <br />control tests and inspections.