My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />QUALITY REQUIREMENTS 014000 - 5 <br />2. Special inspections required by authorities having jurisdiction and indicated on the <br />Statement of Special Inspections will be conducted by Owner. <br />3. Owner-performed tests and inspections indicated in the Contract Documents, including <br />tests and inspections indicated to be performed by Commissioning Authority. <br />E. Continuous Inspection of Workmanship: Describe process for continuous inspection during <br />construction to identify and correct deficiencies in workmanship in addition to testing and <br />inspection specified. Indicate types of corrective actions to be required to bring work into <br />compliance with standards of workmanship established by Contract requirements and approved <br />mockups. <br />F. Monitoring and Documentation: Maintain testing and inspection reports including log of <br />approved and rejected results. Include work Architect has indicated as nonconforming or <br />defective. Indicate corrective actions taken to bring nonconforming work into compliance with <br />requirements. Comply with requirements of authorities having jurisdiction. <br />1.9 REPORTS AND DOCUMENTS <br />A. Test and Inspection Reports: Prepare and submit certified written reports specified in other <br />Sections. Include the following: <br />1. Date of issue. <br />2. Project title and number. <br />3. Name, address, telephone number, and email address of testing agency. <br />4. Dates and locations of samples and tests or inspections. <br />5. Names of individuals making tests and inspections. <br />6. Description of the Work and test and inspection method. <br />7. Identification of product and Specification Section. <br />8. Complete test or inspection data. <br />9. Test and inspection results and an interpretation of test results. <br />10. Record of temperature and weather conditions at time of sample taking and testing and <br />inspection. <br />11. Comments or professional opinion on whether tested or inspected Work complies with <br />the Contract Document requirements. <br />12. Name and signature of laboratory inspector. <br />13. Recommendations on retesting and re-inspecting. <br />B. Manufacturer's Technical Representative's Field Reports: Prepare written information <br />documenting manufacturer's technical representative's tests and inspections specified in other <br />Sections. Include the following: <br />1. Name, address, telephone number, and email address of technical representative making <br />report. <br />2. Statement on condition of substrates and their acceptability for installation of product. <br />3. Statement that products at Project site comply with requirements. <br />4. Summary of installation procedures being followed, whether they comply with <br />requirements and, if not, what corrective action was taken. <br />5. Results of operational and other tests and a statement of whether observed performance <br />complies with requirements.
The URL can be used to link to this page
Your browser does not support the video tag.