ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />QUALITY REQUIREMENTS 014000 - 10 <br />1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures <br />and reviewing the completeness and adequacy of those procedures to perform the Work. <br />2. Notifying Architect, Commissioning Authority, and Contractor promptly of irregularities <br />and deficiencies observed in the Work during performance of its services. <br />3. Submitting a certified written report of each test, inspection, and similar quality-control <br />service to Architect and Commissioning Authority with copy to Contractor and to <br />authorities having jurisdiction. <br />4. Submitting a final report of special tests and inspections at Substantial Completion, that <br />includes a list of unresolved deficiencies. <br />5. Interpreting tests and inspections and stating in each report whether tested and inspected <br />work complies with or deviates from the Contract Documents. <br />6. Retesting and re-inspecting corrected work. <br />PART 2 - PRODUCTS (NOT USED) <br />PART 3 - EXECUTION <br />3.1 TEST AND INSPECTION LOG <br />A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following: <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or inspection. <br />B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and <br />inspection log for Architect's, Commissioning Authority's, reference during normal working <br />hours. <br />1. Submit log at Project closeout as part of Project Record Documents. <br />END OF SECTION 014000