Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />TEMPORARY FACILITIES AND CONTROLS 015000 - 3 <br />2.2 TEMPORARY FACILITIES <br />A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature <br />controls, and foundations adequate for normal loading. <br />B. Common-Use Field Office: Of sufficient size to accommodate needs of Owner, Architect, and <br />construction personnel office activities and to accommodate Project meetings specified in other <br />Division 01 Sections. Keep office clean and orderly. Furnish and equip offices as follows: <br />1. Furniture required for Project-site documents including file cabinets, plan tables, plan <br />racks, and bookcases. <br />2. Conference room of sufficient size to accommodate meetings of 10 individuals. Provide <br />electrical power service and 120-V ac duplex receptacles, with no fewer than one <br />receptacle on each wall. Furnish room with conference table, chairs, and 4-foot- square <br />tack and marker boards. <br />3. Drinking water and private toilet. <br />4. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 <br />to 72 deg F. <br />5. Lighting fixtures capable of maintaining average illumination of 20 fc at desk height. <br />C. Field Office, Owner: Prefabricated or mobile units of minimum size at least 12'x60'. Furnish <br />and equip offices as follows: <br />1. Furniture required for Project-site documents including file cabinets, plan tables, plan <br />racks, and bookcases. <br />2. Drinking water and private toilet. <br />3. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 <br />to 72 deg F. <br />4. Lighting fixtures capable of maintaining average illumination of 20 fc at desk height. <br />D. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate <br />materials and equipment for construction operations. <br />1. Store combustible materials apart from building. <br />2.3 EQUIPMENT <br />A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by <br />locations and classes of fire exposures. <br />B. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, provide vented, <br />self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control. <br />1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating <br />units is prohibited. <br />2. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for <br />temporary use during construction, provide filter with MERV of 8 at each return-air grille <br />in system and remove at end of construction. and clean HVAC system as required in <br />Section 017700 "Closeout Procedures."