My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />TEMPORARY FACILITIES AND CONTROLS 015000 - 4 <br />C. Air-Filtration Units: Primary and secondary HEPA-filter-equipped portable units with four- <br />stage filtration. Provide single switch for emergency shutoff. Configure to run continuously. <br />PART 3 - EXECUTION <br />3.1 TEMPORARY FACILITIES, GENERAL <br />A. Conservation: Coordinate construction and use of temporary facilities with consideration given <br />to conservation of energy, water, and materials. Coordinate use of temporary utilities to <br />minimize waste. <br />1. Salvage materials and equipment involved in performance of, but not actually <br />incorporated into, the Work. See other Sections for disposition of salvaged materials that <br />are designated as Owner's property. <br />3.2 INSTALLATION, GENERAL <br />A. Locate facilities where they will serve Project adequately and result in minimum interference <br />with performance of the Work. Relocate and modify facilities as required by progress of the <br />Work. <br />B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities <br />are no longer needed or are replaced by authorized use of completed permanent facilities. <br />3.3 TEMPORARY UTILITY INSTALLATION <br />A. General: Install temporary service or connect to existing service. <br />1. Arrange with utility company, Owner, and existing users for time when service can be <br />interrupted, if necessary, to make connections for temporary services. <br />B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully. <br />1. Connect temporary sewers to municipal system as directed by authorities having <br />jurisdiction. <br />C. Water Service: Install water service and distribution piping in sizes and pressures adequate for <br />construction as needed. <br />D. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water <br />service facilities in a condition acceptable to Owner. At Substantial Completion, restore these <br />facilities to condition existing before initial use as available. <br />E. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of <br />construction personnel. Comply with requirements of authorities having jurisdiction for type, <br />number, location, operation, and maintenance of fixtures and facilities.
The URL can be used to link to this page
Your browser does not support the video tag.