Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />TEMPORARY FACILITIES AND CONTROLS 015000 - 6 <br />1. The Contractor shall provide an e-mail account for the duration of the project, <br />commencing from the time job site offices are established to post final completion. All <br />communication to be via email or the Owner’s eBuilder site. Faxes will not be accepted. <br />2. Provide the following infrastructure for the computer to be used by the Owner, <br />Architect/Engineers. <br />3. <br />a. An RJ45 wall jack on the near location when the computer is to be set, connected <br />to: <br />b. A network device that has the capability, such as a router, which has the capability <br />to issue a DHCP address to the computer that we will be using at that site. <br />c. The network device (router) should also have the ability to connect the computer <br />that we will be using at that site to the internet. <br />d. An RJ 45 cable to connect from the RJ45 wall jack to the computer that we will be <br />using at that site. <br />3.4 SUPPORT FACILITIES INSTALLATION <br />A. General: Comply with the following: <br />1. Locate field offices, storage sheds, sanitary facilities, and other temporary construction <br />and support facilities for easy access. Contractor’s temporary facility locations shall be <br />sited to provide the least disturbance possible to neighboring properties – Owner reserves <br />the right to direct the location of temporary facilities like job-site trailers or temporary <br />toilets. <br />2. Provide construction for temporary offices, shops, and sheds located within construction <br />area or within 30 feet of building lines that is noncombustible according to ASTM E 136. <br />Comply with NFPA 241. <br />3. Maintain support facilities until Architect schedules Substantial Completion inspection. <br />Remove before Substantial Completion. Personnel remaining after Substantial <br />Completion will be permitted to use permanent facilities, under conditions acceptable to <br />Owner. <br />4. Combustible structures should not be within 30 feet of trees or power poles. <br />B. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas <br />adequate for construction operations. Locate temporary roads and paved areas within <br />construction limits indicated on Drawings. <br />1. Provide dust-control treatment that is nonpolluting and nontracking. Reapply treatment as <br />required to minimize dust. <br />C. Temporary Use of Planned Permanent Roads and Paved Areas: Locate temporary roads and <br />paved areas in same location as permanent roads and paved areas. Construct and maintain <br />temporary roads and paved areas adequate for construction operations. Extend temporary roads <br />and paved areas, within construction limits indicated, as necessary for construction operations. <br />1. Coordinate elevations of temporary roads and paved areas with permanent roads and <br />paved areas.