My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />TEMPORARY TREE AND PLANT PROTECTION 015639 - 5 <br />3.13 CLEAN-UP <br />A. Remove and dispose of excess Mulch and other material brought to the site by the Contractor. <br />3.14 REMOVAL OF FENCING AND OTHER TREE AND PLANT PROTECTION <br />A. At the end of the construction period or when requested by the Owner's Representative remove <br />protection fencing, mulch, and any other Tree Protection material. <br />3.15 DAMAGE OR LOSS TO EXISTING PLANTS TO REMAIN <br />A. Actual tree damage such as trunk scoring and broken limbs or damaged roots inside the Zone of <br />Protection will be assessed according to the percentage of loss of tree value. Percentage of tree <br />value will be determined by the Owner's Representative. Tree value will be determined from <br />“Evaluation of Landscape Trees, Shrubs, and Other Landscape Plants” by International Society <br />of Arboriculture. <br />B. Any remedial work on damaged existing trees recommended by the consulting arborist shall be <br />completed by the Contractor at no cost to the Owner. Remedial work shall include but is not <br />limited to: soil compaction remediation and vertical mulching, pruning and or cabling, insect and <br />disease control including injections, compensatory watering, additional mulching, and could <br />include application tree growth regulators. <br />C. Remedial work may extend up to two years following the completion of construction to allow for <br />any requirements of multiple applications or the need to undertake applications at required <br />seasons of the year. <br />END OF SECTION 015639
The URL can be used to link to this page
Your browser does not support the video tag.