My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />STORM WATER POLLUTION CONTROL 015723 - 3 <br />PART 2 - PART 2 - PRODUCTS <br />2.1 2.1 MATERIALS <br />A. A. Provide all temporary and permanent Best Management Practices (BMP’s) storm water <br />pollution prevention equipment, material, and facilities as required by or as necessary to comply <br />with the SWPPP and meet the General Construction Permit requirements. <br />B. <br />PART 3 - PART 3 - EXECUTION <br />3.1 3.1 IMPLEMENTATION <br />A. Measures required in SWPPP shall be executed as dictated by SWPPP itself. <br />B. Legally Responsible Person (LRP) authorized by the Owner shall file Notice of Intent and <br />obtain project WDID number. <br />C. Contractor shall not commence construction until a Notice of Intent has been filed to the State <br />and project WDID number has been issued. <br />1. Concurrent with commencement of construction activities, Contractor shall implement <br />and retain at project site, the Storm Water Pollution Prevention Plan and a monitoring <br />program and reporting plan throughout construction in accordance with the General <br />Permit. <br />D. Contractor shall be responsible for paying the necessary permit fees and complying with State <br />Water Resources Control Board Order No. 2009-009-DWQ, implementing provisions of the <br />Clean Water Act relating to storm water discharges. <br />E. The plan will address all potential sources of pollutants which may enter the storm water <br />system, it must explain what steps will be taken during construction to minimize the risk of <br />storm water contamination and must address management procedures to be utilized during <br />construction to prevent pollution discharges such as spills, leaking, and dumping. <br />F. A copy of said plan shall be provided to owner and upon request contractor shall certify, in <br />writing, compliance with the relevant rules, regulations and laws. <br />G. Additional information regarding State Water Resources Control Board requirements can be <br />obtained from State Water Resources Control Board, Division of Water Quality: <br />H. <br />I. Attention: Storm Water Permit Unit, <br />J. P.O. Box 1977, Sacramento, CA 95812-1977.
The URL can be used to link to this page
Your browser does not support the video tag.