My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Import Agent
Created:
2/24/2026 10:50 AM
Modified:
2/24/2026 8:13 AM
Text:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />STORM WATER POLLUTION CONTROL 015723 - 5 <br />3. The SWPPP document shall include the following information: <br />a. The name, location, period of construction, and a brief description of the Project. <br />b. Contact information for the Contractor, including name, address, and telephone <br />number. <br />c. Name, location, and description of any environmentally sensitive areas located on <br />or adjoining the Project. <br />d. A list of major construction materials, waste, and activities. <br />e. A list of BMPs to be used to control pollutant discharges from major construction <br />materials, wastes, and activities. <br />f. A site plan (a construction plan may be used) indicating the location of BMPs <br />where appropriate. <br />g. A developer’s certification statement that all required and selected BMPs will be <br />effectively implemented. <br />4. Whenever the Contractor is required to get any type of permit from the Department of <br />Building and Safety (DBAS), the Contractor shall submit the SWPPP document to the <br />DBAS for review and approval before obtaining the permit. At least one copy of the <br />approved SWPPP shall be kept at the construction site and accessible to City inspectors. <br />5. Publication on the General Construction Permit details are available at: <br />6. <br />7. State Water Resources Control Board Website: <br /> <br />8. <br />9. http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml <br />10. <br />11. California Stormwater Quality Association <br />12. http://www.cabmphandbooks.com <br />C. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.