My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 6 <br />1) Paper. <br />2) Cardboard. <br />3) Boxes. <br />4) Plastic sheet and film. <br />5) Polystyrene packaging. <br />6) Wood crates. <br />7) Wood pallets. <br />8) Plastic pails. <br />m. Construction Office Waste: Regardless of salvage/recycle goal indicated in <br />"General" Paragraph above, salvage or recycle 100 percent of the following <br />construction office waste materials: <br />1) Paper. <br />2) Aluminum cans. <br />3) Glass containers. <br />PART 3 - EXECUTION <br />3.1 PLAN IMPLEMENTATION <br />A. General: Implement approved waste management plan. Provide handling, containers, storage, <br />signage, transportation, and other items as required to implement waste management plan <br />during the entire duration of the Contract. <br />1. Comply with operation, termination, and removal requirements in Section 015000 <br />"Temporary Facilities and Controls." <br />B. Alternative Daily Cover (ADC): If ADC is included in waste reduction calculations, it must be <br />counted as waste, not as recycled material. <br />C. Waste Management Coordinator: Engage a waste management coordinator to be responsible for <br />implementing, monitoring, and reporting status of waste management work plan. Coordinator <br />shall be present at Project site full time for duration of Project. <br />D. Training: Train workers, subcontractors, and suppliers on proper waste management <br />procedures, as appropriate for the Work. <br />1. Distribute waste management plan to everyone concerned within three days of submittal <br />return. <br />2. Distribute waste management plan to entities when they first begin work on-site. Review <br />plan procedures and locations established for salvage, recycling, and disposal. <br />E. Site Access and Temporary Controls: Conduct waste management operations to ensure <br />minimum interference with roads, streets, walks, walkways, and other adjacent occupied and <br />used facilities.
The URL can be used to link to this page
Your browser does not support the video tag.