Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 7 <br />1. Designate and label specific areas on Project site necessary for separating materials that <br />are to be salvaged and recycled. <br />2. Comply with Section 015000 "Temporary Facilities and Controls" for controlling dust <br />and dirt, environmental protection, and noise control. <br />F. Waste Management in Historic Zones or Areas: Transportation equipment and other materials <br />shall be of sizes that clear surfaces within historic spaces, areas, rooms, and openings, by 12 <br />inches - or more. <br />3.2 SALVAGING DEMOLITION WASTE <br />A. Comply with requirements in Section 024113 “Site Demolition”. <br />B. Salvaged Items for Reuse in the Work: Salvage items for reuse and handle as follows: <br />1. Clean salvaged items. <br />2. Pack or crate items after cleaning. Identify contents of containers with label indicating <br />elements, date of removal, quantity, and location where removed. <br />3. Store items in a secure area until installation. <br />4. Protect items from damage during transport and storage. <br />5. Install salvaged items to comply with installation requirements for new materials and <br />equipment. Provide connections, supports, and miscellaneous materials necessary to <br />make items functional for use indicated. <br />C. Salvaged Items for Sale and Donation: Not permitted on Project site. <br />D. Salvaged Items for Owner's Use: Salvage items for Owner's use and handle as follows: <br />1. Clean salvaged items. <br />2. Pack or crate items after cleaning. Identify contents of containers with label indicating <br />elements, date of removal, quantity, and location where removed. <br />3. Store items in a secure area until delivery to Owner. <br />4. Transport items to Owner's storage area designated by Owner. <br />5. Protect items from damage during transport and storage. <br />E. Doors and Hardware: Brace open end of door frames. Except for removing door closers, leave <br />door hardware attached to doors. <br />F. Equipment: Drain tanks, piping, and fixtures. Seal openings with caps or plugs. Protect <br />equipment from exposure to weather. <br />G. Plumbing Fixtures: Separate by type and size. <br />H. Lighting Fixtures: Separate lamps by type and protect from breakage. <br />I. Electrical Devices: Separate switches, receptacles, switchgear, transformers, meters, <br />panelboards, circuit breakers, and other devices by type.