My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />OPERATION AND MAINTENANCE DATA 017823 - 4 <br />C. Table of Contents: List each product included in manual, identified by product name, indexed to <br />the content of the volume, and cross-referenced to Specification Section number in Project <br />Manual. <br />D. Manual Contents: Arrange contents by specification sections chronological order. If possible, <br />assemble instructions for subsystems, equipment, and components of one system into a single <br />file. <br />1.7 SYSTEMS AND EQUIPMENT OPERATION MANUALS <br />A. Systems and Equipment Operation Manual: Assemble a complete set of data indicating <br />operation of each system, subsystem, and piece of equipment not part of a system. Include <br />information required for daily operation and management, operating standards, and routine and <br />special operating procedures. <br />1. Engage a factory-authorized service representative to assemble and prepare information <br />for each system, subsystem, and piece of equipment not part of a system. <br />2. Prepare a separate manual for each system and subsystem, in the form of an instructional <br />manual for use by Owner's operating personnel. <br />B. Content: In addition to requirements in this Section, include operation data required in <br />individual Specification Sections and the following information: <br />1. System, subsystem, and equipment descriptions. Use designations for systems and <br />equipment indicated on Contract Documents. <br />2. Performance and design criteria if Contractor has delegated design responsibility. <br />3. Operating standards. <br />4. Operating procedures. <br />5. Operating logs. <br />6. Wiring diagrams. <br />7. Control diagrams. <br />8. Piped system diagrams. <br />9. Precautions against improper use. <br />10. License requirements including inspection and renewal dates. <br />C. Descriptions: Include the following: <br />1. Product name and model number. Use designations for products indicated on Contract <br />Documents. <br />2. Manufacturer's name. <br />3. Equipment identification with serial number of each component. <br />4. Equipment function. <br />5. Operating characteristics. <br />6. Limiting conditions. <br />7. Performance curves. <br />8. Engineering data and tests. <br />9. Complete nomenclature and number of replacement parts. <br />D. Operating Procedures: Include the following, as applicable:
The URL can be used to link to this page
Your browser does not support the video tag.