Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />OPERATION AND MAINTENANCE DATA 017823 - 3 <br />2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section of the manual. <br />Mark each tab to indicate contents. Include typed list of products and major components <br />of equipment included in the section on each divider, cross-referenced to Specification <br />Section number and title of Project Manual. <br />3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic <br />software storage media for computerized electronic equipment. Enclose title pages and <br />directories in clear plastic sleeves. <br />4. Supplementary Text: Prepared on 8-1/2-by-11-inch white bond paper. <br />5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text. <br />a. If oversize drawings are necessary, fold drawings to same size as text pages and <br />use as foldouts. <br />b. If drawings are too large to be used as foldouts, fold and place drawings in labeled <br />envelopes and bind envelopes in rear of manual. At appropriate locations in <br />manual, insert typewritten pages indicating drawing titles, descriptions of contents, <br />and drawing locations. <br />1.6 REQUIREMENTS FOR OPERATION, AND MAINTENANCE MANUALS <br />A. Organization of Manual: Unless otherwise indicated, organize single manual. The manual shall <br />contain the following materials, in the order listed: <br />1. Title page. <br />2. Table of contents. <br />3. Manual contents. <br />a. Contact list <br />b. Certificate of Substantial Completion (AIA G704-2000) <br />c. Contractor's Statement of Warranty <br />d. Lead & Asbestos Free Certification Letter <br />e. Certificate of Occupancy <br />f. Final Permit Inspection Approvals <br />g. Operation & Maintenance Data (including shop drawings, where applicable) and <br />Warranties organized by specification sections chronological order and named <br />according to CSI Format. <br />B. Title Page: Include the following information: <br />1. Subject matter included in manual. <br />2. Name and address of Project. <br />3. Name and address of Owner. <br />4. Date of submittal. <br />5. Name and contact information for Contractor. <br />6. Name and contact information for Construction Manager. <br />7. Name and contact information for Architect. <br />8. Name and contact information for Commissioning Authority. <br />9. Names and contact information for major consultants to the Architect that designed the <br />systems contained in the manuals. <br />10. Cross-reference to related systems in other operation and maintenance manuals.