My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />METAL BUILDING SYSTEMS 133419 - 1 <br />SECTION 133419 - METAL BUILDING SYSTEMS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section for Lunch Shelter and Metal Perforated Screenwall system. It includes: <br />1. Structural-steel framing. <br />2. Metal roof panels. <br />3. Perforated metal sheets. <br />4. Accessories. <br />B. Related Requirements: <br />1. Section 033000 “Cast-in-Place Concrete” <br />2. Section 101419 “Dimensional Letter Signage” <br />1.2 DEFINITIONS <br />A. Terminology Standard: See MBMA's "Metal Building Systems Manual" for definitions of terms <br />for metal building system construction not otherwise defined in this Section or in standards <br />referenced by this Section. <br />1.3 COORDINATION <br />A. Coordinate sizes and locations of concrete foundations and casting of anchor-rod inserts into <br />foundation walls and footings. Anchor rod installation, concrete, reinforcement, and formwork <br />requirements are specified in Section 033000 "Cast-in-Place Concrete." <br />B. Coordinate metal panel assemblies with rain drainage work, flashing, trim, and construction of <br />supports and other adjoining work to provide a leakproof, secure, and noncorrosive installation. <br />1.4 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1. Review methods and procedures related to metal building systems including, but not <br />limited to, the following: <br />a. Condition of foundations and other preparatory work performed by other trades. <br />b. Structural load limitations. <br />c. Construction schedule. Verify availability of materials and erector's personnel, <br />equipment, and facilities needed to make progress and avoid delays. <br />d. Required tests, inspections, and certifications.
The URL can be used to link to this page
Your browser does not support the video tag.