My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />DIMENSIONAL LETTER SIGNAGE 101419 - 5 <br />3.2 INSTALLATION <br />A. General: Install signs using mounting methods indicated and according to manufacturer's written <br />instructions. <br />1. Install signs level, plumb, true to line, and at locations and heights indicated, with sign <br />surfaces free of distortion and other defects in appearance. <br />2. Before installation, verify that sign surfaces are clean and free of materials or debris that <br />would impair installation. <br />3. Corrosion Protection: Coat concealed surfaces of exterior aluminum in contact with grout, <br />concrete, masonry, wood, or dissimilar metals, with a heavy coat of bituminous paint. <br />B. Mounting Methods: <br />1. Projecting Studs: Using a template, drill holes in substrate aligning with studs on back of <br />sign. Remove loose debris from hole and substrate surface. <br />a. Thin or Hollow Surfaces: Place spacers on studs, place sign in position with spacers <br />pinched between sign and substrate and install washers and nuts on stud ends <br />projecting through opposite side of surface and tighten. <br />2. Concealed Studs: Using a template, drill holes in substrate aligning with studs on back of <br />sign. Remove loose debris from hole and substrate surface. <br />a. Masonry Substrates: Fill holes with adhesive. Leave recess space in hole for <br />displaced adhesive. Place sign in position and push until flush to surface, embedding <br />studs in holes. Temporarily support sign in position until adhesive fully sets. <br />b. Thin or Hollow Surfaces: Place sign in position and flush to surface, install washers <br />and nuts on studs projecting through opposite side of surface, and tighten. <br />3.3 ADJUSTING AND CLEANING <br />A. Remove and replace damaged or deformed characters and signs that do not comply with specified <br />requirements. Replace characters with damaged or deteriorated finishes or components that <br />cannot be successfully repaired by finish touchup or similar minor repair procedures. <br />B. Remove temporary protective coverings and strippable films as signs are installed. <br />C. On completion of installation, clean exposed surfaces of signs according to manufacturer's written <br />instructions and touch up minor nicks and abrasions in finish. Maintain signs in a clean condition <br />during construction and protect from damage until acceptance by Owner. <br />END OF SECTION 101419
The URL can be used to link to this page
Your browser does not support the video tag.