Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />BASIC ELECTRICAL REQUIREMENTS 260100 - 6 <br />M. Excavation, Cutting and Patching: <br />1. Excavating, trenching and backfilling required for the work of this Division in <br />accordance with the applicable requirements of Division 31. Excavating and backfilling <br />connected with electrical work, repaving cuts and providing and maintaining protective <br />measures for the electrical work excavation required by the governing authorities having <br />jurisdiction shall be performed as a part of the work of this Division. <br />2. Verify openings indicated on the drawings. Provide all cutting, patching and <br />reinforcement of the construction of the building as required to install electrical work. <br />N. Tests <br />1. Equipment and systems for which the National Electrical Testing Association (NETA) <br />has an approved or recommended procedure, shall be tested in accordance with that <br />procedure. Test values shall equal values recommended by NETA. Copies of test reports <br />shall be submitted as required under shop drawing submittals. <br />2. Resistance to ground tests shall be accomplished by a qualified independent testing firm <br />to measure resistance to ground at grounding electrodes. Make tests before slabs or <br />affected areas are poured in order that corrective measures, if required, may be taken. <br />Submit a report showing the results of these measurements. If the resistances exceed <br />values specified elsewhere or NETA test procedure recommendations, perform corrective <br />measures required to reduce resistance to acceptable values. <br />3. Prior to energizing any motor, measure the service voltage for phase balance and report if <br />unbalance exceeds 1% from mean. <br />4. Measure the three-phase voltage at no load and at maximum load conditions and submit <br />to the engineer a report showing the results of these measurements. <br />5. Upon completion of the work and adjustment of all equipment, conduct an operating test. <br />Conduct the test in the presence of an authorized representative of the Architect. <br />Demonstrate system and equipment to operate in accordance with requirements of the <br />Contract Documents and to be free from electrical and mechanical defects. Provide <br />systems free from short circuits and grounds and show an insulation resistance between <br />phase conductors and ground not less than the requirements of the governing electric <br />code. Test circuits for proper neutral connection. <br />6. Complete tests prior to final inspection of project, including corrective work based on the <br />results of the tests. <br />7. Perform special tests on systems and equipment as specified herein using personnel <br />qualified to perform such tests. <br />O. Protection: Protect finish parts of the materials and equipment against damage during the <br />progress of the work and until final completion and acceptance. Cover materials and <br />equipment in storage and during construction in such a manner that no finished surfaces will be <br />damaged or marred. Keep moving parts clean, dry and lubricated. <br />P. Cleaning Up: <br />1. Upon completion of the work and at various time during the progress of the work, <br />remove from the building all surplus materials, rubbish and debris resulting from the <br />work of this Division. <br />2. Thoroughly clean switchgear including busses, apparatus, exposed conduit, metal work <br />including the exterior and interior, and accessories for the work of this Division, of