My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />COMMON WORK RESULTS FOR ELECTRICAL 260500 - 3 <br />2.3 GROUT <br />A. Nonmetallic, Shrinkage-Resistant Grout: ASTM C 1107, factory-packaged, nonmetallic <br />aggregate grout, noncorrosive, nonstaining, mixed with water to consistency suitable for <br />application and a 30-minute working time. <br />PART 3 - PART 3 - EXECUTION <br />3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION <br />A. Comply with NECA 1. <br />B. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit <br />for wall-mounting items. <br />C. Headroom Maintenance: If mounting heights or other location criteria is not indicated, arrange <br />and install components and equipment to provide maximum possible headroom consistent with <br />these requirements. <br />D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components <br />of both electrical equipment and other nearby installations. Connect in such a way as to <br />facilitate future disconnecting with minimum interference with other items in the vicinity. <br />E. Right of Way: Give to piping systems installed at a required slope. <br />3.2 SLEEVE INSTALLATION FOR ELECTRICAL PENETRATIONS <br />A. Electrical penetrations occur when raceways, cables, wireways, cable trays, or busways <br />penetrate concrete slabs, concrete or masonry walls, or fire-rated floor and wall assemblies. <br />B. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled holes or formed <br />openings are used. Install sleeves during erection of slabs and walls. <br />C. Use pipe sleeves unless penetration arrangement requires rectangular sleeved opening. <br />D. Fire-Rated Assemblies: Install sleeves for penetrations of fire-rated floor and wall assemblies <br />unless openings compatible with firestop system used are fabricated during construction of floor <br />or wall. <br />E. Cut sleeves to length for mounting flush with both surfaces of walls. <br />F. Extend sleeves installed in floors 2 inches above finished floor level. <br />G. Size pipe sleeves to provide 1/4-inch annular clear space between sleeve and raceway or cable, <br />unless indicated otherwise. <br />H. Seal space outside of sleeves with grout for penetrations of concrete and masonry
The URL can be used to link to this page
Your browser does not support the video tag.