My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />EARTHWORK 312000 - 15 <br />3. When thickness of compacted base course is 6 inches or less, place materials in a single <br />layer. <br />4. When thickness of compacted base course exceeds 6 inches, place materials in equal <br />layers, with no layer more than 6 inches thick or less than 3 inches thick when <br />compacted. <br />3.21 PAVEMENT REPAIR <br />A. Repair or patch asphalt pavement as specified in Section 321216 Asphalt Paving. Repair or <br />patch concrete pavement, curbs and gutters as specified in Section 321313 Concrete Paving. Do <br />not repair pavement until trench has been backfilled and compacted as herein specified. As a <br />minimum, maintain one-way traffic on roads and streets crossed by trenches. <br />3.22 FIELD QUALITY CONTROL <br />A. Testing Agency Services: Allow testing agency to inspect and test each subgrade and each fill <br />or backfill layer. Do not proceed until test results for previously completed work verify <br />compliance with requirements. <br />1. Perform field in-place density tests according to ASTM D 1556 (sand cone method), <br />ASTM D 2167 (rubber balloon method), or ASTM D 2937 (drive cylinder method), as <br />applicable. <br />a. Field in-place density tests may also be performed by the nuclear method <br />according to ASTM D 2922, provided that calibration curves are periodically <br />checked and adjusted to correlate to tests performed using ASTM D 1556. With <br />each density calibration check, check the calibration curves furnished with the <br />moisture gages according to ASTM D 3017 <br />b. When field in-place density tests are performed using nuclear methods, make <br />calibration checks of both density and moisture gages at beginning of work, on <br />each different type of material encountered, and at intervals as directed by the <br />Architect. <br />B. Footing Subgrade: At footing subgrades, at least one test of each soil stratum will be performed <br />to verify design bearing capacities. Subsequent verification and approval of other footing <br />subgrades may be based on a visual comparison of subgrade with tested subgrade when <br />approved by Architect. <br />C. Paved and Building Slab Areas: At subgrade and at each compacted fill and backfill layer, <br />perform at least one field in-place density test for every 2,000 sq. ft. or less of paved area or <br />building slab, but in no case fewer than three tests. <br />D. Foundation Wall Backfill: In each compacted backfill layer, perform at least one field in-place <br />density test for each 100 feet or less of wall length, but no fewer than two tests along a wall <br />face. <br />E. Trench Backfill: In each compacted initial and final backfill layer, perform at least one field in- <br />place density test for each 150 feet or less of trench, but no fewer than two tests.
The URL can be used to link to this page
Your browser does not support the video tag.