My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />EARTHWORK 312000 - 16 <br />F. When testing agency reports that subgrades, fills, or backfills have not achieved degree of <br />compaction specified, scarify and moisten or aerate, or remove and replace soil materials to <br />depth required; recompact and retest until specified compaction is obtained. <br />3.23 PROTECTION <br />A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep <br />free of trash and debris. <br />B. Repair and reestablish grades to specified tolerances where completed or partially completed <br />surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent <br />construction operations or weather conditions. <br />1. Scarify or remove and replace soil material to depth as directed by Architect; reshape and <br />recompact at optimum moisture content to the required density. <br />C. Where settling occurs before Project correction period elapses, remove finished surfacing, <br />backfill with additional soil material, compact, and reconstruct surfacing. <br />1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, <br />and eliminate evidence of restoration to greatest extent possible. <br />3.24 DISPOSAL OF SURPLUS AND WASTE MATERIALS <br />A. Remove surplus satisfactory soil and waste materials, including unsatisfactory soil, trash, and <br />debris, and legally dispose of them off Owner's property. <br />B. Transport surplus satisfactory soil to designated storage areas on Owner's property. Stockpile or <br />spread soil as directed by Architect. <br />1. Remove waste materials, including unsatisfactory soil, trash, and debris, and legally <br />dispose of them off Owner's property. <br />END OF SECTION 312000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.