Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />STORM DRAINAGE 334100 - 2 <br />E. Reports and calculations for design mixes for each class of cast-in-place concrete. <br /> <br />F. Coordination drawings showing structures, pipe sizes, locations, and elevations. Include de- <br />tails of underground structures and connections. Show other piping in same trench. Indicate <br />interface and spatial relationship between piping and proximate structures. <br /> <br />G. Inspection and test reports specified in the "Field Quality Control" Article. <br /> <br /> <br />1.5 QUALITY ASSURANCE <br /> <br />A. Environmental Agency Compliance: Comply with regulations pertaining storm drainage sys- <br />tems. <br /> <br />B. Utility Compliance: Comply with regulations pertaining to storm drainage systems. Include <br />standards of water and other utilities where appropriate. <br /> <br />C. Product Options: Drawings indicate sizes, profiles, connections, and dimensional require- <br />ments of system components and are based on specific manufacturer types indicated. Other <br />manufacturers' products with equal performance characteristics may be considered. Refer to <br />Section "Product Requirements." <br /> <br /> <br />1.6 DELIVERY, STORAGE, AND HANDLING <br /> <br />A. Do not store plastic structures in direct sunlight. <br /> <br />B. Do not store plastic pipe or fittings in direct sunlight. <br /> <br />C. Protect pipe, pipe fittings, and seals from dirt and damage. <br /> <br />D. Handle precast concrete manholes and other structures according to manufacturer's rigging in- <br />structions. <br /> <br />1.7 PROJECT CONDITIONS <br /> <br />A. Site Information: Perform site survey, research public utility records, and verify existing utili- <br />ty locations. Notify architect of potential utility conflicts prior to installation of pipe system. <br /> <br />B. Locate existing structures and piping to be closed and abandoned. <br /> <br />C. Prior to commencing construction in public right-of-way and connecting to any public storm <br />drain systems, contractor shall contact the agency of authority and obtain necessary permits. <br /> <br />C. Existing Utilities: Do not interrupt existing utilities serving facilities occupied by the Owner <br />or others except when permitted under the following conditions and then only after arranging <br />to provide acceptable temporary utility services. <br /> <br />1. Notify Architect not less than 48 hours in advance of proposed utility interruptions.