My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />STORM DRAINAGE 334100 - 2 <br />E. Reports and calculations for design mixes for each class of cast-in-place concrete. <br /> <br />F. Coordination drawings showing structures, pipe sizes, locations, and elevations. Include de- <br />tails of underground structures and connections. Show other piping in same trench. Indicate <br />interface and spatial relationship between piping and proximate structures. <br /> <br />G. Inspection and test reports specified in the "Field Quality Control" Article. <br /> <br /> <br />1.5 QUALITY ASSURANCE <br /> <br />A. Environmental Agency Compliance: Comply with regulations pertaining storm drainage sys- <br />tems. <br /> <br />B. Utility Compliance: Comply with regulations pertaining to storm drainage systems. Include <br />standards of water and other utilities where appropriate. <br /> <br />C. Product Options: Drawings indicate sizes, profiles, connections, and dimensional require- <br />ments of system components and are based on specific manufacturer types indicated. Other <br />manufacturers' products with equal performance characteristics may be considered. Refer to <br />Section "Product Requirements." <br /> <br /> <br />1.6 DELIVERY, STORAGE, AND HANDLING <br /> <br />A. Do not store plastic structures in direct sunlight. <br /> <br />B. Do not store plastic pipe or fittings in direct sunlight. <br /> <br />C. Protect pipe, pipe fittings, and seals from dirt and damage. <br /> <br />D. Handle precast concrete manholes and other structures according to manufacturer's rigging in- <br />structions. <br /> <br />1.7 PROJECT CONDITIONS <br /> <br />A. Site Information: Perform site survey, research public utility records, and verify existing utili- <br />ty locations. Notify architect of potential utility conflicts prior to installation of pipe system. <br /> <br />B. Locate existing structures and piping to be closed and abandoned. <br /> <br />C. Prior to commencing construction in public right-of-way and connecting to any public storm <br />drain systems, contractor shall contact the agency of authority and obtain necessary permits. <br /> <br />C. Existing Utilities: Do not interrupt existing utilities serving facilities occupied by the Owner <br />or others except when permitted under the following conditions and then only after arranging <br />to provide acceptable temporary utility services. <br /> <br />1. Notify Architect not less than 48 hours in advance of proposed utility interruptions.
The URL can be used to link to this page
Your browser does not support the video tag.