My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
515 E Dyer Rd-EV Chargers & Parking lot - Plan
PBA
>
Building
>
ProjectDox
>
D
>
Dyer Rd
>
515 E Dyer Rd
>
515 E Dyer Rd-EV Chargers & Parking lot - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:41 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
20186473
101124420
101124421
Full Address
515 E Dyer Rd
Street Number
515
Street Direction
E
Street Name
Dyer
Street Suffix
Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CL 18"18" <br />COUNTER <br />GP-5 <br />9 <br />4 <br />6 <br />6 <br />PAP <br />E <br />R <br /> <br />T <br />O <br />W <br />E <br />L <br />DISP <br />E <br />N <br />S <br />E <br />R <br />CL 18"18" <br />COUNTER <br />GP-5 <br />9 <br />4 <br />6 <br />6 <br />PAP <br />E <br />R <br /> <br />T <br />O <br />W <br />E <br />L <br />DISP <br />E <br />N <br />S <br />E <br />R <br />PH: <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />DA <br />T <br />E <br />45 <br />0 <br /> <br />L <br />A <br />M <br />B <br />E <br />R <br />T <br /> <br />A <br />V <br />E <br />, <br /> <br />P <br />A <br />L <br />O <br /> <br />A <br />L <br />T <br />O <br />, <br /> <br />C <br />A <br /> <br />9 <br />4 <br />3 <br />0 <br />6 <br />(8 <br />8 <br />8 <br />) <br /> <br />3 <br />4 <br />2 <br />- <br />7 <br />3 <br />8 <br />3 <br />ORIGINAL SIZE 24"X36" <br />REV: <br />PROJ: <br />DL <br />X <br />8 <br /> <br />E <br />L <br />E <br />C <br />T <br />R <br />I <br />C <br /> <br />V <br />E <br />H <br />I <br />C <br />L <br />E <br /> <br />C <br />H <br />A <br />R <br />G <br />I <br />N <br />G <br /> <br />S <br />T <br />A <br />T <br />I <br />O <br />N <br />S <br />51 <br />5 <br /> <br />E <br />A <br />S <br />T <br /> <br />D <br />Y <br />E <br />R <br /> <br />R <br />O <br />A <br />D <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />BSE14-2 <br />DLX8_EV_OSP <br />ALEXANDER SHORTS <br />PROFESSIONA L ENGINEER <br />ELECTRICALSTATE OF CALIFORNIA <br />E 21782 <br />SITE PLAN <br />OVERVIEW <br />E1.0 <br />IFP <br />LEGEND <br /> 1" = 30'-0"1 SITE PLAN OVERALL <br />CURRENT EV STALL LOCATION <br />ALL LOACTIONS SHOWN ARE REFLECTED <br />WITHIN THIS PLAN SET. <br />(14) LV2 EV <br />CHARGERS <br />(14) LV2 EV <br />CHARGERS <br />(14) LV2 EV <br />CHARGERS <br />(18) LV2 EV <br />CHARGERS <br />(14) LV2 EV <br />CHARGERS <br />(2) LV3 EV <br />CHARGERS <br />GENERAL NOTES <br />A. REFER TO SHEET G0.0, E0.1 & E0.2 FOR ELECTRICAL NOTES. <br />B. INSTALLER TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO STARTING <br />WORK. <br />C. INSTALLER TO FIELD VERIFY EQUIPMENT SPECIFICATIONS PRIOR TO <br />INSTALLATION. <br />D. INSTALLER TO COORDINATE CONDUIT ROUTING WITH ALL <br />UNDERGROUND UTILITIES AND EXISITING UNDERGROUND LINES. <br />F. WHERE CIRCUIT CONDUCTORS ARE SPLICED WITHIN A BOX, ALL <br />ASSOCIATED EQUIPMENT GROUNDING CONDUCTORS SHALL BE <br />CONNECTED WITHIN THE BOX OR TO THE BOX AS PER 250.148. <br />G. SPLICES, SPLICING DEVICES, PULL BOXES AND HANDHOLE <br />ENCLOSURES SHALL BE INSTALLED IN ACCORDANCE WITH NEC ARTICLE <br />314. ENCLOSURES SHALL REQUIRE A TOOL TO OPEN. <br />H. REFER TO CIVIL SHEETS FOR ALL BOLLARD DETAILS AND ASSOCIATED <br />DIMENSIONS. <br />I. ELECTRICAL EQUIPMENT TO BE PAD MOUNTED. NEW PAD SHALL BE <br />MINIMUM 6" HIGH. EDGE OF PAD SHALL EXTEND 6" BEYOND EQUIPMENT <br />FRAME MIN. CHAMFER ALL OUTSIDE CORNERS. REFER TO ELECTRICAL <br />DETAILS AND CIVIL PLANS FOR ADDITIONAL INFORMATION. <br />AMAZON STANDARDS <br />THESE PLANS HAVE BEEN DESIGNED IN ACCORDANCE WITH THE <br />FOLLOWING: <br />1.AMZL EV CHARGING ELECTRICAL DESIGN STANDARDS – REV3.0 <br />ISSUED: 05.28.2024 <br />2.AMZL SITE DESIGN GUIDELINES V8, ISSUED: 12.29.2023 <br />3.AMZL DESIGN DELIVERABLES REQUIREMENTS V4, ISSUED: <br />06.02.2023 <br />SETBACK NOTES <br />CONTRACTOR TO VERIFY THAT LOCATIONS OF ALL PROPOSED EV <br />ELECTRICAL EQUIPMENT AND ASSOCIATED COMPONENTS, FEEDERS, AND <br />INFRASTRUCTURE ARE IN COMPLIANCE WITH ALL LOCAL CODES, <br />SETBACKS, AND BUFFERS. <br />UTILITY NOTES <br />THE EXISTING UTILITIES SHOWN ON THIS PLAN ARE BASED UPON <br />SUBMITTED INFORMATION FROM AMAZON AND CIVIL PLANS AND ARE NOT <br />TO BE SCALED. CONTRACTOR TO FIELD VERIFY ALL INFORMATION. ALL <br />LOCATIONS, DIMENSIONS, AND DEPTHS OF ALL EXISTING UTILITIES ARE <br />TO BE VERIFIED PRIOR TO START OF WORK. ANY DISCREPANCIES OR <br />AREAS FOR POTENTIAL CONFLICTS ARE TO BE REPORTED IN WRITING. <br />(14) LV2 EV <br />CHARGERS <br />(14) LV2 EV <br />CHARGERS <br />(18) LV2 EV <br />CHARGERS <br />0
The URL can be used to link to this page
Your browser does not support the video tag.