Laserfiche WebLink
WD PROJ. #DRAWN BY:CHECKED DATE <br />23411 JA EG/SH <br />WESTGROUP DESIGNS, INC.© <br />ISSUED FOR: <br />REGISTRATION/SIGNATURE: <br />SHEET TITLE: <br />SHEET NUMBER: <br />S1.01 <br />REVISIONS: <br />02/19/25 <br />STRUCTURAL NOTES <br />No.3503 <br />L <br />I <br />GNE <br />L <br />S NO <br />B A <br />LAE <br />A LI OFRNIA <br />N <br />E <br />ER <br />I <br />E <br />ET <br />ORPD <br />F E <br />R IR <br />L.KC <br />E <br />TS <br />AT <br />CFO <br />RE <br />G <br />S <br />I <br />S <br />URALTSRUCTPRO <br />G <br />R <br />E <br />S <br />S <br /> <br />- <br />NO <br />T <br /> <br />F <br />O <br />R <br /> <br />P <br />L <br />A <br />N <br />REV <br />I <br />E <br />W <br />H: <br />\ <br />2 <br />0 <br />2 <br />3 <br />\ <br />2 <br />3 <br />0 <br />2 <br />2 <br />1 <br />\ <br />3 <br />_ <br />D <br />r <br />a <br />w <br />i <br />n <br />g <br />s <br />\ <br />D <br />w <br />g <br />s <br />- <br />0 <br />0 <br />\ <br />2 <br />3 <br />- <br />0 <br />2 <br />2 <br />1 <br />- <br />0 <br />0 <br />_ <br />S <br />1 <br />. <br />0 <br />1 <br /> <br />S <br />T <br />R <br />U <br />C <br />T <br />U <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br />. <br />d <br />w <br />g <br /> <br /> <br /> <br /> <br />P <br />L <br />O <br />T <br />T <br />E <br />D <br /> <br />B <br />Y <br />: <br /> <br /> <br />Ch <br />a <br />n <br />n <br />o <br />n <br /> <br />S <br />h <br />i <br />d <br />a <br />k <br />i <br /> <br /> <br /> <br /> <br />O <br />N <br />: <br /> <br /> <br />Ma <br />r <br />c <br />h <br /> <br />2 <br />4 <br />, <br /> <br />2 <br />0 <br />2 <br />5 <br />BEWLEY STREET <br />RESIDENCE <br />ILLUMINATION <br />FOUNDATION <br />918 BEWLEY STREET, <br />SANTA ANA, CA 92703 <br />LONG BEACH • SAN DIEGO <br />Project: <br />LONG BEACH OFFICE <br />3900 Cover Street, Long Beach <br />CA 90808 • 562.985.3200 <br />S T R U C T U R A L E N G I N SREE <br />23-0221-00 <br />02/19/251 DELTA 1 <br />02/19/25CITY APPROVAL <br />03/24/252 DELTA 2 <br />FRAMING LUMBER: <br />1.ALL STRUCTURAL LUMBER SHALL BE DOUGLAS FIR-LARCH, WEST COAST (WCDF) OF THE FOLLOWING MINIMUM GRADES <br />(UNLESS NOTED OTHERWISE): <br />A. PLATES, BLOCKING, 2X FRAMING AND 2X6 STUDS AND LARGER = NO. 2 <br />B. 2X4 STUDDING = CONSTRUCTION GRADE <br />C. BEAMS, HEADERS, POSTS AND OTHER 4X OR LARGER MEMBERS (UNO) = NO. 1 <br />2.REDBUILT LAMINATED LUMBER SHALL BE SERIES LVL BEAM/JOIST AND INSTALLATIONS SHALL CONFORM TO ICC SR-2993. <br />ALLOWABLE DESIGN VALUES SHALL BE: <br />Fb = 2,900 PSI Fc = (PERPENDICULAR) = 750 PSI <br />Fv = 265 PSI Fc = (PARALLEL) = 2,635 PSI <br />Ft = 1,660 PSI E = 2x106 PSI <br />3.STRUCTURAL PLYWOOD SHALL BE DOUGLAS FIR CONFORMING TO UNITED STATES PRODUCT STANDARD PS-1-19 <br />EXPOSURE I, MARKED STRUCTURAL I AND SHALL BE STAMPED BY AN APPROVED FABRICATOR. <br />4.“STRUCTURAL WALLS” WHERE CALLED OUT IN THE DRAWINGS REFERS TO SHEAR WALLS, EXTERIOR WALLS, AND/OR <br />BEARING WALLS. <br />5.CONTRACTOR SHALL COORDINATE SPECIAL INSPECTIONS AND CONSTRUCTION SCHEDULE SO THAT ALL ELEMENTS <br />REQUIRING SPECIAL INSPECTION MAY BE OBSERVED BY THE SPECIAL INSPECTOR PRIOR TO INSTALLATION OF COVERING <br />MATERIAL. <br />6.FRAMING ON WHICH THE DIAPHRAGM AND SHEAR WALL SHEATHING IS INSTALLED SHALL BE OF THE SIZE AND GRADE <br />AND MOISTURE CONTENT SPECIFIED. WET LUMBER SHALL BE ALLOWED TO AIR DRY TO COMPLY WITH THE SPECIFIED <br />MOISTURE CONTENT UNDER WHICH IT IS GRADED, PRIOR TO COVERING WITH SHEATHING. SPACING OF FRAMING <br />MEMBERS SHALL BE AS SPECIFIED AND ACCURATELY MAINTAINED SO AS TO ENSURE ADEQUATE EDGE AND END <br />DISTANCES. WHERE ADEQUATE EDGE OR END DISTANCES ARE NOT OBTAINED, THE FRAMING SHALL BE ADJUSTED OR <br />THE SHEATHING TRIMMED TO SECURE PROPER END AND EDGE DISTANCES AND OTHER CLEARANCES. FRAMING <br />OBSERVED TO HAVE BEEN SPLIT BY FASTENERS SHALL BE REPLACED AND THE SHEATHING REFASTENED. <br />7.SHEATHING SHALL BE OF THE TYPE, THICKNESS AND GRADE CALLED FOR ON THE PLANS. ALTERNATE SHEATHING <br />MATERIAL SHALL NOT BE USED WITHOUT THE WRITTEN AUTHORIZATION OF THE SEOR. <br />8.FASTENERS USED TO CONNECT SHEATHING TO UNDERLYING FRAMING SHALL BE OF THE SIZE SPECIFIED ON THE PLANS, <br />INSTALLED AT THE CENTER-TO-CENTER SPACING NOTED THEREIN. FASTENERS SHALL BE INSTALLED AT THE MINIMUM <br />DISTANCE FROM THE EDGE OR END OF THE DIAPHRAGM OR SHEAR WALL SHEATHING. THE FASTENER HEAD SHALL BE <br />DRIVEN FLUSH BUT SHALL NOT FRACTURE THE SURFACE OF THE SHEATHING. FASTENERS SHALL BE STAGGERED ALONG <br />THE UNDERLYING FRAMING MEMBERS TO THE EXTENT PERMITTED BY EDGE AND END DISTANCE REQUIREMENTS. <br />FASTENERS SHALL PENETRATE THROUGH THE SHEATHING AND INTO SOLID FRAMING OR BLOCKING BEHIND. <br />INCORRECTLY FASTENED SHEATHING SHALL BE IDENTIFIED AND REPAIRED AS DIRECTED BY THE SEOR. <br />9.BLOCKING CALLED FOR AT THE UNSUPPORTED EDGES OF PANEL SHEATHING AND ELSEWHERE, SHALL BE OF THE <br />THICKNESS AND GRADE OF MATERIAL SPECIFIED AND/OR NOTED. BLOCKING BETWEEN WOOD MEMBERS SHALL BE <br />SNUGLY FIT. BLOCKING OBSERVED TO HAVE BEEN SPLIT BY THE FASTENERS SHALL BE REPLACED AND SHEATHING <br />REFASTENED. <br />10.SPECIAL FASTENINGS SHOWN ON THE PLANS, SUCH AS HORIZONTAL DIAPHRAGM AND SHEAR WALL SHEATHING NAILING <br />TO CHORDS, DRAG STRUTS, POST TIE-DOWNS AND BLOCKING ABOVE SHEAR WALLS, SHALL BE INSTALLED. SILLS SHALL <br />BE SECURED AS SHOWN ON THE PLANS. SPECIAL CLIPS, STRAPS, TIE-DOWNS AND OTHER CONNECTIONS WITHIN OR <br />BETWEEN DIAPHRAGMS AND SHEAR WALLS SHALL BE INSTALLED AS SHOWN ON THE PLANS. SPECIAL INSPECTION <br />SERVICES SHALL BE SCHEDULED SO AS TO ALLOW ANY CORRECTIVE WORK TO BE ACCOMPLISHED WITHOUT <br />INTERFERENCE WITH LATER SCHEDULED WORK. <br />11.NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED UNLESS SPECIFICALLY SHOWN, NOTED OR APPROVED BY THE <br />SEOR. <br />12.MAXIMUM MOISTURE CONTENT FOR 2X FRAMING SHALL NOT EXCEED 19 PERCENT (19%) AT TIME OF COVER-UP <br />(COVER-UP INCLUDES APPLICATION OF PLYWOOD OR GYPBOARD). 2X FRAMING SHALL BE STAMPED “S-DRY” OR “KD”. FOR <br />PROJECTS NOT GOVERNED BY DSA OR OSHPD, 2X FRAMING MAY BE STAMPED “S-GREEN”. MOISTURE CONTENT OF 2X <br />FRAMING SHALL BE TESTED AND INSPECTED PER FRAMED LUMBER SPECIAL INSPECTION NOTES. <br />13.BOLT HOLE DIAMETER SHALL BE THE DIAMETER OF BOLT PLUS 1/16" UNLESS NOTED OTHERWISE. PROVIDE WASHERS <br />UNDER HEADS AND NUTS OF ALL BOLTS AND LAG SCREWS BEARING ON WOOD. ALL BOLTS SHALL BE RE-TIGHTENED JUST <br />PRIOR TO COVER-UP. <br />14.PRESERVATIVE-TREATED WOOD (I.E. PROTECTED AGAINST DECAY OR INSECT ATTACK) SHALL BE USED FOR WOOD <br />FRAMING MEMBERS WHICH FORM THE STRUCTURAL SUPPORTS OF BUILDINGS, BALCONIES, PORCHES OR SIMILAR <br />PERMANENT BUILDING APPURTENANCES WHEN SUCH MEMBERS ARE EITHER IN CONTACT WITH CONCRETE OR MASONRY <br />OR ARE EXPOSED TO THE WEATHER WITHOUT ADEQUATE PROTECTION FROM A ROOF, EAVE, OVERHANG OR OTHER <br />COVERING TO PREVENT MOISTURE OR WATER ACCUMULATION ON THE SURFACE OR AT JOINTS BETWEEN MEMBERS. <br />WHERE MEMBERS ARE FIELD CUT, DRILLED, NOTCHED OR OTHERWISE ALTERED IN THE FIELD, ALL AFFECTED SURFACES <br />SHALL BE RE-TREATED. <br />15.WOOD FRAMING TO BE PRESERVATIVE-TREATED SHALL CONFORM TO THE REQUIREMENTS OF THE AWPA STANDARD U1 <br />AND APPLICABLE AWPA UC STANDARDS FOR THE SPECIES, PRODUCT, PRESERVATIVE AND END USE. THESE WOOD <br />MEMBERS SHALL BEAR THE QUALITY MARK OF AN INSPECTION AGENCY THAT MAINTAINS CONTINUING SUPERVISION, <br />TESTING AND INSPECTION OVER THE QUALITY OF THE PRESERVATIVE-TREATED WOOD. <br />16.WHERE PRESERVATIVE-TREATED WOOD IS USED IN ENCLOSED LOCATIONS WHERE DRYING IN SERVICE CANNOT READILY <br />OCCUR, SUCH WOOD SHALL BE AT A MOISTURE CONTENT OF 19 PERCENT (19%) OR LESS BEFORE BEING COVERED WITH <br />INSULATION, INTERIOR WALL FINISH, FLOOR COVERING OR OTHER MATERIALS. <br />17.FRAMING HANGERS, CAPS, HOLDOWNS, POST BASES, ANCHORS, CONNECTORS, ETC., SHALL BE AS MANUFACTURED BY <br />"SIMPSON COMPANY" OR APPROVED EQUAL TO BE SUBMITTED TO STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO <br />INSTALLATION. NAIL OPTIONS THAT SIMPSON PROVIDES FOR FULL CONNECTOR VALUE OTHER THAN COMMON WIRE MAY <br />BE USED. <br />18.FASTENERS INCLUDING NUTS AND WASHERS IN INTERIOR LOCATIONS IN CONTACT WITH PRESERVATIVE-TREATED WOOD <br />MEMBERS SHALL BE OF HOT-DIPPED ZINC-COATED GALVANIZED STEEL (ASTM A-153), STAINLESS STEEL, SILICON BRONZE <br />OR COPPER, EXCEPT THAT ANCHOR BOLTS MAY BE IN ADDITION OF MECHANICALLY DEPOSITED ZINC-COATED STEEL <br />(ASTM B-695, CLASS 55 MINIMUM). WHERE FASTENERS IN INTERIOR LOCATIONS (EXCLUDING EXTERIOR WALL SILL <br />PLATES) IN CONTACT WITH ZINC BORATE PRESERVATIVE-TREATED WOOD MAY BE PLAIN CARBON STEEL. <br />19.NAILS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F-1667. NAILS SHALL BE COMMON WIRE (UNO) AND THE <br />NUMBER OF NAILS CONNECTING WOOD MEMBERS SHALL BE PER THE PLANS AND DETAILS BUT NOT LESS THAN THE <br />AMOUNTS SET FORTH IN TYPICAL WOOD FASTENING SCHEDULE IN THE DRAWINGS. GALVANIZED COMMON NAILS SHALL <br />BE USED FOR ALL EXPOSED EXTERIOR WOOD. COMMON NAILS SHALL CONFORM TO THE SPECIFICATIONS OF NAIL <br />PROPERTIES SCHEDULE BELOW: <br />20.TOE NAILS SHALL BE DRIVEN AT AN ANGLE OF APPROXIMATELY 30 DEGREES WITH THE MEMBER AND STARTED <br />APPROXIMATELY 1/3 THE LENGTH OF THE NAIL FROM THE MEMBER END. <br />21.AT FLOORS AND ROOFS, PROVIDE FULL HEIGHT SOLID BLOCKING AT ENDS OF SAWN LUMBER JOISTS OR RAFTERS, <br />ABOVE BEARING WALLS, BELOW BEARING WALLS WHERE JOISTS ARE PERPENDICULAR TO WALL AND AT INTERMEDIATE <br />POINTS NOT TO EXCEED 8'-0" ON CENTER FROM BLOCK TO BLOCK; OR WHERE NONE OF THE ABOVE OCCURS PROVIDE, <br />AT A MINIMUM, THE FOLLOWING: <br />A.AT SPANS GREATER THAN 16'-0", PROVIDE TWO (2) ROWS OF CONTINUOUS FULL HEIGHT BLOCKING SPACED AT 1/3 <br />POINTS AND AT ENDS OF JOISTS OR RAFTERS. <br />B.AT SPANS 16'-0" AND LESS, BUT GREATER THAN 8'-0", PROVIDE ONE (1) CONTINUOUS ROW OF FULL HEIGHT SOLID <br />BLOCKING AT MID-SPAN AND AT END OF JOISTS OR RAFTERS. <br />21.STITCH NAILING FOR DOUBLE SAWN JOISTS SHALL BE 16D NAILS AT 12" ON CENTER STAGGERED TOP AND BOTTOM. <br />STITCH BOLTING FOR BUILT UP BEAMS (FOUR 2X MEMBERS MAXIMUM) SHALL BE 1/2" DIAMETER MACHINE BOLT AT 18" ON <br />CENTER. STITCH BOLTING FOR FIVE 2X MEMBERS OR MORE SHALL BE 5/8" DIAMETER MACHINE BOLTS AT 18" ON CENTER <br />STAGGERED TOP AND BOTTOM, UNLESS NOTED OTHERWISE. <br />22.STITCH NAIL DOUBLE STUDS A MINIMUM OF 16D NAILS AT 16" ON CENTER, UNLESS NOTED OTHERWISE. <br />23.ALL STUDDING SHALL BE CONTINUOUS BETWEEN POINTS OF LATERAL SUPPORT. <br />24.PROVIDE A MINIMUM OF A DOUBLE STUD UNDER 4X AND LARGER (OR BUILT-UP BEAMS) UNLESS NOTED OTHERWISE ON <br />PLAN. <br />25.PRE-DRILL ALL LAG SCREW HOLES WITH DIAMETER (D) FOR UNTHREADED SHANK, 40% TO 70% OF D FOR THREADED <br />PORTION. THE THREADED PORTION OF LAG SCREWS SHALL BE INSERTED IN ITS LEAD HOLE BY TURNING WITH A <br />WRENCH, NOT BY DRIVING WITH A HAMMER. PROVIDE SOAP OR LUBRICANT ON LAG SCREWS OR IN LEAD HOLE TO <br />FACILITATE INSERTION AND PREVENT DAMAGE TO LAG SCREWS OR WOOD SCREWS. <br />26.SEE SPECIAL INSPECTION NOTES FOR INSPECTION REQUIREMENTS. <br />NAIL PROPERTIES SCHEDULE <br />DESIGNATION LENGTH WIRE DIAMETER HEAD DIAMETER <br />6d 2"0.113"0.266" <br />8d 2 1/2"0.131"0.281" <br />10d 3"0.148"0.312" <br />12d 3 1/4"0.148"0.312" <br />16d 3 1/2"0.162"0.344" <br />20d 4"0.192"0.406" <br />NOTE: 10d COMMON SHORT (2 1/8" LONG) MAY BE USED AT 1/2" AND THINNER <br />PLYWOOD IN LIEU OF 10d COMMON (3") OR 8d COMMON (2 1/2" LONG). NAILING <br />SHALL NOT BREAK THROUGH OUTER PLY OF PLYWOOD. IF PNEUMATIC GUNS <br />ARE USED, THEY SHALL BE ADJUSTED TO SATISFY THE ABOVE CRITERIA. <br />POST-INSTALLED ANCHORS: <br />1.POST INSTALLED ANCHOR NOTES IN THIS SECTION SHALL APPLY TO ALL ANCHORS (INCLUDING THREADED ROD OR <br />REINFORCING BARS) INSTALLED INTO HARDENED CONCRETE OR MASONRY EXCEPT FOR POWDER DRIVEN FASTENERS, <br />AS APPLICABLE, SEE POWDER DRIVEN FASTENER GENERAL NOTES FOR MORE INFORMATION. <br />2.INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S INSTRUCTIONS AND THE APPLICABLE EVALUATION REPORT <br />AND SHALL BE INSTALLED BY PERSONNEL TRAINED TO INSTALL THE TYPE OF POST-INSTALLED ANCHOR BEING <br />INSTALLED. <br />3.LOCATE EXISTING REINFORCING BY NON-DESTRUCTIVE METHODS PRIOR TO DRILLING. EXISTING REINFORCING SHALL <br />NOT BE CUT OR DAMAGED. <br />4.CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF F'C = 2500 PSI, BE A MINIMUM OF 21 DAYS OLD AND <br />HAVE A MINIMUM TEMPERATURE OF 50 DEGREES FAHRENHEIT WHEN DRILLING OCCURS. <br />5.HOLES FOR INSTALLATION OF THE POST-INSTALLED ANCHOR SHALL BE DRILLED USING A DRILL THAT HAS A <br />CARBIDE-TIPPED BIT THAT COMPLIES WITH ANSI B212.15. A REBAR CUTTING DRILL BIT IS NOT ALLOWED. <br />6.CONTRACTOR SHALL USE APPROPRIATE EQUIPMENT AND METHODS AS REQUIRED TO PROVIDE DRILLED HOLES FOR <br />POST-INSTALLED ANCHORS IN ACCORDANCE WITH APPLICABLE STANDARDS, MANUFACTURER'S RECOMMENDATIONS, <br />AND QUALIFYING (ICC) TEST REPORTS. CARE SHALL BE TAKEN TO PREVENT OVERSIZING, OVALING, AND/OR BLOW-OUT <br />THROUGH THE BACK FACE OF THE DRILLED MEMBER. IF OVERSIZING, OVALING, AND/OR BLOW-OUT OCCURS, THE <br />EMPLOYED EQUIPMENT AND METHODS SHALL BE DISCONTINUED. ADDITIONAL DRILLING SHALL NOT BE RESUMED UNTIL <br />THE SEOR HAS PROVIDED APPROVED REPAIR PROCEDURES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST <br />OF ALL SUCH REPAIRS. WHEN RESUMING DRILLING, THE CONTRACTOR SHALL MODIFY THE PROCEDURES AS NECESSARY <br />TO PREVENT FURTHER DAMAGE. <br />7.HOLES SHALL BE CLEANED OF DUST AND DEBRIS, USING A WIRE BRUSH AND COMPRESSED AIR OR MANUFACTURER'S <br />BLOW-OUT BULB (AS PER MANUFACTURER'S RECOMMENDATIONS) AS REQUIRED TO REMOVE PARTICULATE DEBRIS AND <br />TO ACHIEVE A RELATIVELY DUST-FREE SURFACE. <br />8.OIL, SCALE, AND RUST SHALL BE REMOVED FROM THE POST-INSTALLED ANCHOR AND HOLES SHALL BE DRY, PRIOR TO <br />INSTALLATION. <br />9.POST-INSTALLED EMBEDMENT DEPTHS NOTED ON THE PLANS OR DETAILS ARE NOMINAL (I.E. MEASURED FROM FACE OF <br />CONCRETE OR MASONRY TO EMBEDDED TIP OF ANCHOR/REBAR). FOR CORRESPONDING HOLE DEPTH, REFER TO <br />APPLICABLE EVALUATION REPORT. <br />10.ANCHORS IN APPROVED ADHESIVE ANCHOR SYSTEMS SHALL HAVE MINIMUM Fy = 36 KSI AND SHALL BE ZINC <br />ELECTROPLATED OR HOT-DIP GALVANIZED AS REQUIRED PER ESR. <br />11.APPROVED ADHESIVE ANCHOR SYSTEMS AND EVALUATION REPORTS ARE AS FOLLOWS: <br />A.CONCRETE: <br />§HILTI HIT-RE 500 V3 ESR-3814 <br />§HILTI HIT-HY 200 V3 ESR-4868 <br />§DEWALT PURE 110+ESR-3298 <br />§DEWALT AC200+ESR-4027 <br />B.HORIZONTAL SLAB-ON-GRADE DOWELS: <br />§HILTI HIT-RE 100 ESR-3829 <br />§HILTI HIT-HY 100 ESR-3574 <br />§DEWALT PURE 50+ESR-3576 <br />§SIMPSON SET-XP ESR-2508 <br />12.WHERE NOTED ON SPECIFIC DETAILS, INSTALLATION OF ADHESIVE ANCHORS SHALL BE BY PERSONNEL CERTIFIED BY AN <br />APPLICABLE CERTIFICATION PROGRAM PER ACI 318 SECTION 17.8.2.2. CERTIFICATION SHALL INCLUDE WRITTEN AND <br />PERFORMANCE TESTS IN ACCORDANCE WITH ACI/CRSI ADHESIVE ANCHOR INSTALLER CERTIFICATION PROGRAM. <br />CERTIFICATION DOCUMENTS SHALL BE SUBMITTED TO THE SEOR AND AHJ FOR REVIEW AND ACCEPTANCE PRIOR TO <br />INSTALLATION. <br />13.APPROVED EXPANSION ANCHORS AND EVALUATION REPORTS ARE AS FOLLOWS: <br />A.CONCRETE NOT EXPOSED TO WEATHER: <br />§HILTI KWIK BOLT-TZ2 ANCHORS ESR-4266 <br />§DEWALT POWER-STUD+ SD2 ESR-2502 <br />§SIMPSON STRONG-TIE STRONG-BOLT 2 <br />WEDGE ANCHOR ESR-3037 <br />B.CONCRETE EXPOSED TO WEATHER: <br />§STAINLESS STEEL HILTI KWIK BOLT-TZ2 ANCHORS ESR-4266 <br />§DEWALT POWER-STUD+ SD4 OR SD6 ESR-2502 <br />§STAINLESS STEEL SIMPSON STRONG-TIE <br />STRONG-BOLT 2 WEDGE ANCHOR ESR-3037 <br />14.WHERE APPLICABLE, EXPANSION ANCHORS SHALL BE INSTALLED WITH THE MINIMUM TORQUE, USING A CALIBRATED <br />TORQUE WRENCH. WEDGE OR SLEEVE TYPE ANCHORS MUST ATTAIN THE SPECIFIED TORQUE WITHIN ONE HALF TURN OF <br />THE NUT, EXCEPT 1/4" AND 3/8” DIAMETER WEDGE OR SLEEVE TYPE ANCHORS MUST ATTAIN SPECIFIED TORQUE WITHIN <br />ONE QUARTER TURN OF THE NUT. <br />15.INSTALLATION TORQUES FOR EXPANSION ANCHORS SHALL BE AS NOTED BELOW: <br />16.APPROVED SCREW ANCHORS AND EVALUATION REPORTS ARE AS FOLLOWS: <br />A.CONCRETE: <br />§HILTI KH-EZ OR KH-EZ P ANCHORS ESR-3027 <br />§DEWALT SCREW-BOLT+ESR-3889 <br />§DEWALT TAPPER+ESR-3068 <br />§SIMPSON TITEN HD ESR-2713 <br />§ITW RED HEAD TAPCON+ESR-3699 <br />B.SOLID-GROUTED CONCRETE MASONRY (CMU): <br />§HILTI KH-EZ OR KH-EZ P ANCHORS ESR-3056 <br />§DEWALT SCREW-BOLT+ESR-4042 <br />§DEWALT ULTRACON+ESR-3196 <br />§SIMPSON TITEN HD ESR-1056 <br />17.INSTALLATION TORQUES FOR SCREW ANCHORS SHALL BE AS NOTED BELOW:: <br />18.SEE SPECIAL INSPECTION AND TESTING NOTES FOR INSPECTION REQUIREMENTS. <br />EXPANSION ANCHOR MAXIMUM INSTALLATION <br />TORQUE LOADS IN CONCRETE (FT-LB) <br />NOMINAL <br />ANCHOR <br />DIAMETER <br />HILTI KWIK <br />BOLT TZ2 <br />DEWALT <br />POWER <br />STUD+ SD2, <br />SD4, OR <br />SD6 <br />SIMPSON <br />STRONG <br />BOLT 2 <br />1/4"4CS/6SS N/A 4 <br />3/8"30 20 30 <br />1/2"50CS/40SS 40 60 <br />5/8"40CS/60SS 60 90CS/ 80 SS <br />3/4"110CS/125SS 110 150 <br />1"185 N/A N/A <br />SCREW ANCHOR MAXIMUM INSTALLATION <br />TORQUE LOADS IN CONCRETE (FT-LB) <br />NOMINAL <br />ANCHOR <br />DIAMETER <br />HILTI KH-EZ <br />OR KH-EZ P DEWALT SCREW BOLT+SIMPSON <br />TITEN HD <br />ITW RED <br />HEAD <br />TAPCON+ <br />1/4"18 19 AT 1 5/8” EMBED / <br />25 AT 2 1/2” EMBED 24 20 <br />3/8" <br />40 (19 <br />AT EMBED <br />< 1 5/8") <br />25 AT 2” & 2 1/2” EMBED <br />/ 40 AT 3 1/4” EMBED 50 50 <br />1/2"45 45 AT 2 1/2” & 3” EMBED / <br />60 AT 4 1/4” EMBED 65 70 <br />5/8"85 60 100 N/A <br />3/4"95 70 150 N/A <br />STRUCTURAL OBSERVATION: <br />1.THE STRUCTURAL ENGINEER OF RECORD (SEOR), OR HIS/HER DESIGNATED ENGINEER, SHALL PROVIDE VISUAL <br />STRUCTURAL OBSERVATION OF THE STRUCTURAL SYSTEM FOR GENERAL CONFORMANCE TO THE APPROVED <br />CONSTRUCTION DOCUMENTS AND SPECIFICATIONS AT SIGNIFICANT CONSTRUCTION STAGES AND AT COMPLETION OF <br />THE STRUCTURAL SYSTEM, AS REQUIRED BY CBC SECTION 1704 AND AS DEFINED IN CBC SECTION 1702. WRITTEN <br />REPORTS SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE OR HIS DESIGNEE FOR DISTRIBUTION TO THE <br />SPECIAL INSPECTOR, CONTRACTOR AND BUILDING OFFICIAL. <br />2.THE STRUCTURAL OBSERVER SHALL SUBMIT A WRITTEN STATEMENT TO THE GOVERNING AGENCY THAT THE SITE VISITS <br />HAVE BEEN MADE. SUCH REPORTS SHALL IDENTIFY ANY OBSERVED DEFICIENCIES, WHICH TO THE BEST OF THE <br />STRUCTURAL OBSERVER'S KNOWLEDGE HAVE NOT BEEN RESOLVED. AT THE COMPLETION OF THE STRUCTURAL SYSTEM <br />THE STRUCTURAL OBSERVER SHALL PROVIDE A FINAL OBSERVATION REPORT INDICATING THAT TO THE BEST OF HIS/HER <br />KNOWLEDGE ALL OBSERVED DEFICIENCIES HAVE BEEN RESOLVED AND THE STRUCTURAL SYSTEM GENERALLY <br />CONFORMS TO THE APPROVED PLANS AND SPECIFICATIONS. <br />3.STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE RESPONSIBILITY OF THE INSPECTIONS BY THE BUILDING <br />OFFICIAL AS REQUIRED BY THE CALIFORNIA ADMINISTRATIVE CODE, SPECIAL INSPECTIONS REQUIRED BY CBC SECTION <br />1705, OR ANY OTHER INSPECTION REQUIRED BY OTHER SECTIONS OF THE CODE OR AS NOTED ELSEWHERE IN THE <br />CONTRACT DOCUMENTS. THE STRUCTURAL OBSERVER DOES NOT HAVE THE AUTHORITY TO APPROVE COVERING OF <br />CONSTRUCTION AND HIS/HER POSITIVE DISPOSITION OF THE OBSERVATION REPORT DOES NOT WARRANT THAT THE <br />CONSTRUCTION WILL PASS THE BUILDING OFFICIAL'S INSPECTION. <br />4.STRUCTURAL OBSERVATION FOR THIS PROJECT SHALL BE PROVIDED BY MHP STRUCTURAL ENGINEERS, INC.; 3900 <br />COVER STREET, LONG BEACH, CALIFORNIA, 90808; TELEPHONE (562) 985-3200; FAX (562) 985-1011. <br />5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION SCHEDULE AND SHALL NOTIFY THE STRUCTURAL <br />OBSERVER NO LESS THAN THREE (3) BUSINESS DAYS IN ADVANCE OF REQUIRED OBSERVATIONS. FAILURE OF THE <br />CONTRACTOR TO PROVIDE ADEQUATE NOTIFICATION MAY RESULT IN DELAYS DUE TO CORRECTIVE WORK OR REMOVAL <br />OF SUBSEQUENT WORK TO ALLOW ADEQUATE OBSERVATION. REMOVAL AND REPLACEMENT OF ANY FINISHED WORK <br />AND/OR FRAMING DAMAGED BY THE REMOVAL PROCESS OR AS REQUIRED FOR CORRECTIVE ACTION RESULTING FROM <br />INADEQUATE NOTIFICATION SHALL BE AT THE CONTRACTOR'S EXPENSE. <br />6.THE STRUCTURAL OBSERVER SHALL AS A MINIMUM PERFORM STRUCTURAL OBSERVATION AT THE FOLLOWING STAGES <br />OF CONSTRUCTION (CONSTRUCTION STAGES AND ELEMENTS/CONNECTIONS TO BE OBSERVED): <br />A.CONCRETE & REINFORCING STEEL <br />AFTER EXCAVATION OR FORMING AND PLACEMENT OF REINFORCING STEEL (INCLUDING POST-TENSIONING <br />HARDWARE AND TENDONS), PRIOR TO CLOSING FORMS AND PLACEMENT OF CONCRETE, FOR FIRST SIGNIFICANT <br />POUR OF STRUCTURAL WORK. <br />B.STEEL FRAMING <br />FOLLOWING ERECTION AND COMPLETION OF REPRESENTATIVE SAMPLING OF CONNECTIONS (INCLUDING GUSSET <br />PLATES AND BRACES), PRIOR TO COVERING CONNECTIONS. <br />C.WOOD SHEAR WALLS <br />REPRESENTATIVE SAMPLING OF SHEAR PANEL NAILING AND ANCHORAGE SYSTEMS, PRIOR TO COVERING. <br />D.FLOOR/ROOF DIAPHRAGMS <br />REPRESENTATIVE SAMPLING OF CONNECTION OF DIAPHRAGM (i.e. NAILING, POWER-DRIVEN FASTENERS OR WELDS) <br />TO THE FRAMING SYSTEM. <br />E.ANCHORS (EPOXY AND/OR MECHANICAL) <br />REPRESENTATIVE SAMPLING OF ANCHORS EMBEDDED IN CONCRETE AND/OR MASONRY, PRIOR TO COVERING. <br />F.COMPLETION OF STRUCTURAL SYSTEM <br />SPECIAL INSPECTIONS: <br />1.THE OWNER, OR THE OWNER'S AUTHORIZED AGENT (OTHER THAN THE CONTRACTOR AS APPLICABLE) SHALL EMPLOY <br />ONE OR MORE SPECIAL INSPECTORS, INCLUDING AS APPLICABLE AN INSPECTOR OF RECORD (IOR), WHO SHALL PROVIDE <br />SPECIAL INSPECTIONS DURING CONSTRUCTION FOR CERTAIN TYPES OF WORK WHEN SO SPECIFIED IN THE CONTRACT <br />DOCUMENTS AND PROJECT SPECIFICATIONS. WHERE AN IOR IS REQUIRED BY THE GOVERNING AGENCY, THE IOR MAY <br />PERFORM SPECIAL INSPECTIONS IF THAT PERSON IS QUALIFIED PER THE GOVERNING AGENCY'S STANDARDS FOR THE <br />SPECIAL INSPECTION REQUIRED. WHERE AN IOR IS NOT REQUIRED, THESE SPECIAL INSPECTIONS SHALL BE IN ADDITION <br />TO AND COMPLEMENTARY WITH THE INSPECTIONS PROVIDED BY THE GOVERNING AGENCY. <br />2.THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON FROM AN APPROVED AGENCY CONFORMING TO ASTM C1077 <br />WHO SHALL DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF THE ARCHITECT, STRUCTURAL ENGINEER OF <br />RECORD AND THE GOVERNING AGENCY, FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION <br />REQUIRING SPECIAL INSPECTION. <br />3.THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE WITH THE DESIGN DRAWINGS, <br />SPECIFICATIONS AND APPLICABLE WORKMANSHIP PROVISIONS OF THE CODE AND OTHER APPLICABLE REGULATIONS <br />IDENTIFIED WITHIN THE CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE <br />ATTENTION OF THE GENERAL CONTRACTOR FOR CORRECTION AND THEN, IF UNCORRECTED, TO THE ATTENTION OF THE <br />ARCHITECT, STRUCTURAL ENGINEER OF RECORD AND THE GOVERNING AGENCY. IT SHALL BE THE GENERAL <br />CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE SPECIAL INSPECTOR AND SCHEDULE THE SPECIAL <br />INSPECTIONS WITH ADEQUATE TIME TO ADDRESS ANY AND ALL POTENTIAL DISCREPANCIES PRIOR TO PROCEEDING WITH <br />SUBSEQUENT WORK THAT COVERS OR OTHERWISE MAKES INACCESSIBLE ANY WORK IDENTIFIED AS DEVIATING FROM <br />THE PROJECT REQUIREMENTS. <br />4.THE SPECIAL INSPECTOR SHALL FURNISH REGULAR INSPECTION REPORTS TO THE ARCHITECT, STRUCTURAL ENGINEER <br />OF RECORD AND THE GOVERNING AGENCY IDENTIFYING THE WORK INSPECTED AND ANY UNCORRECTED <br />DISCREPANCIES FROM THE CONSTRUCTION DOCUMENTS. AT THE CONCLUSION OF THE PROJECT OR THE SPECIAL <br />INSPECTORS ASSIGNED SCOPE OF WORK, THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT STATING <br />WHETHER THE WORK REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF HIS OR HER KNOWLEDGE, COMPLETED IN <br />CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS AND SPECIFICATIONS (INCLUDING APPROVED RFI'S, <br />ADDENDUMS, ETC.) AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE CODE AND OTHER APPLICABLE <br />REGULATIONS IDENTIFIED WITHIN THE CONSTRUCTION DOCUMENTS. <br />5.UNLESS NOTED OTHERWISE, SPECIAL INSPECTIONS INDICATED BELOW SHALL BE PROVIDED IN EITHER A CONTINUOUS <br />OR PERIODIC CAPACITY, AS DEFINED BELOW, AS REQUIRED BY THE INDIVIDUAL CODE OR REFERENCED STANDARD. <br />6.CONTINUOUS - SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS PRESENT WHEN AND WHERE THE WORK TO BE <br />INSPECTED IS BEING PERFORMED. <br />7.PERIODIC - SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS INTERMITTENTLY PRESENT WHERE THE WORK TO <br />BE INSPECTED HAS BEEN OR IS BEING PERFORMED. FOR STRUCTURAL STEEL, PERIODIC INSPECTION IS FURTHER <br />DEFINED SUCH THAT ITEMS ARE OBSERVED ON A RANDOM BASIS. <br />8.FOR STRUCTURAL STEEL WELDING AND BOLTING, SPECIAL INSPECTION SHALL BE PROVIDED IN EITHER AN OBSERVE OR <br />PERFORM CAPACITY AS DEFINED BELOW: <br />·OBSERVE (O) - INSPECTOR SHALL OBSERVE THESE ITEMS ON A RANDOM BASIS <br />·PERFORM (P) - INSPECTOR SHALL OBSERVE OR PERFORM SPECIFIED TASK FOR EACH WELDED OR BOLTED JOINT <br />OR MEMBER <br />9.QUALITY CONTROL (QC) INSPECTION TASKS SHALL BE PERFORMED BY THE FABRICATOR'S OR ERECTOR'S QC INSPECTOR <br />(QCI) AS INDICATED. QUALITY ASSURANCE (QA) INSPECTION TASKS SHALL BE PERFORMED BY THE QA INSPECTOR (QAI) <br />AS INDICATED. WHEN A TASK IS INDICATED TO BE PERFORMED BY BOTH THE QAI AND QCI, COORDINATION IS PERMITTED <br />SO THAT THE INSPECTION FUNCTIONS ARE PERFORMED BY ONLY ONE PARTY. WHEN THE QAI RELIES ON THE QCI, THE <br />APPROVAL OF THE SEOR AND AGENCY HAVING JURISDICTION IS REQUIRED. <br />10.THE FOLLOWING CONSTRUCTION ELEMENTS AND MATERIALS SHALL BE INSPECTED AND EVALUATED BY A SPECIAL <br />INSPECTOR IN ACCORDANCE WITH THE NOTED CBC SECTIONS AND REFERENCED STANDARDS, WHERE ELEMENTS AND <br />MATERIALS ARE PRESENT ON THE PROJECT. SEE GENERAL NOTES FOR EACH MATERIAL FOR ADDITIONAL <br />REQUIREMENTS, IN ADDITION TO TABLES AND NOTES BELOW: <br />1 <br />No.3503 <br />L <br />I <br />GNE <br />L <br />S NO <br />B A <br />LAE <br />A L I OFRNIA <br />N <br />E <br />ER <br />I <br />E <br />ET <br />ORPD <br />F E <br />R IR <br />L.KC <br />E <br />TS <br />AT <br />CFO <br />RE <br />G <br />S <br />I <br />S <br />URALTSRUCT <br /> <br />Renewal Date <br />LICENSED ARCHITECT <br />STATE OF C A L I FORNI <br />A <br />J <br />C32284 <br />HOSHUAJAMESSMIT <br />05/31/25 <br />03/24/25 <br />914-918 N Bewley <br />St5/8/2025