Laserfiche WebLink
LOC <br />PROJECT <br />COPYRIGHT LOC, INC <br />ORIGINAL SHEET SIZE: 42" X 30" <br />SHEET INDEXVICINITY MAP PROJECT SCOPE OF WORK <br />PROJECT DATA <br />PROPERTY DESCRIPTION <br />PROJECT NAME: <br />ADDRESS: <br />LEGAL DESCRIPTION: <br />APN: <br />ZONING INFORMATION <br />LOT SIZE: <br />ZONE: <br />LAND USE DESIGNATION: <br />MAXIMUM HEIGHT: <br />MAXIMUM FAR: <br />SETBACKS REQUIRED: <br />PARKING <br />EXISTING <br />PROVIDED <br />EV PARKING <br />BUILDING AND SAFETY INFORMATION: <br />OCCUPANCY: <br />AREA EXISTING: <br />AREA PROPOSED: <br />NO. OF STORIES: <br />BUILDING HEIGHT: <br />BUILDING CONSTRUCTION: <br />FIRE SPRINKLERS, EXISTING: <br />FIRE SPRINKERS, PROPOSED: <br />SEPARATIONS REQUIRED: <br />YARD REQUIREMENTS: <br />FEMA DESIGNATED FLOOD ZONE: <br />APPLICABLE CODES & STANDARDS <br />PROJECT DIRECTORY <br />DEFERRED APPROVALS <br />CLIENT:ARCHITECT: <br />CLIENT: <br />ARCHITECT: <br />CONSULTANTS: <br />PREPARED UNDER THE SUPERVISION OF: <br />ALI JEEVANJEE <br />LOC ARCHITECTS DATE <br />REVIEWED FOR CONSTRUCTABILITY: <br />SEAN THOMAS <br />PRINCIPAL CIVIL ENGINEER <br />RCE NO.: 80470 <br />DATE <br />RECOMMENDED FOR CONSTRUCTION: <br />JASON GABRIEL <br />PRINCIPAL CIVIL ENGINEER <br />RCE NO.: 62968 <br />DATE <br />7/ <br />3 <br />1 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />3 <br />: <br />0 <br />5 <br />: <br />3 <br />7 <br /> <br />P <br />M <br />2308 <br />G0.2 <br />SANTA ANA ZOO LOC <br />ARCHITECTS <br />KPFF <br />STRUCTURAL ENGINEER <br />KPFF <br />CIVIL ENGINEER <br />BORDER <br />LANDSCAPE ARCHITECT <br />ABRARI AND <br />ASSOCIATES <br />MEP ENGINEER <br />ASSOCIATED <br />SOILS <br />ENGINEERING <br />GEOTECHNICAL ENGINEER <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Ramzi.hodali@kpff.com <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Sharad.Ganju@kpff.com <br />724 S. SPRING ST, SUITE 701 <br />LOS ANGELES, CA 90014 <br />213 372 5111 <br />Darren@border-la.com <br />1713 S. STANDARD AVE <br />GLENDALE, CA 91201 <br />818 956 1900 <br />Telma@abrari.com <br />2860 WALNUT AVE. <br />SIGNAL HILL, CA 90755 <br />562 897 2749 <br />Ted@associatedsoils.com <br />1801 E. CHESTNUT AVE. <br />SANTA ANA, CA 92701 <br />714 647 6575 <br />Efisher@santa-ana.org <br />3203 E. 4TH ST <br />LOS ANGELES, CA 90063 <br />213 537 0480 <br />Office@loc-arch.com <br />SHEET INDEX <br />AND PROJECT <br />DATA <br />JULY 17TH, 2025 <br />BID ADDENDUM <br />01 <br />SANTA ANA ZOO <br />1821 & 1823 E CHESTNUT AVE, SANTA <br />ANA, CA 92701 <br />KPFF <br />STRUCTURAL ENGINEER <br />LOC ARCHITECTS <br />KPFF <br />CIVIL ENGINEER <br />BORDER <br />LANDSCAPE ARCHITECT <br />ABRARI AND ASSOCIATES <br />MEP ENGINEER <br />ASSOCIATED SOILS ENGINEERING <br />GEOTECHNICAL ENGINEER <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Ramzi.hodali@kpff.com <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Sharad.Ganju@kpff.com <br />724 S. SPRING ST, SUITE 701 <br />LOS ANGELES, CA 90014 <br />213 372 5111 <br />Darren@border-la.com <br />1713 S. STANDARD AVE <br />GLENDALE, CA 91201 <br />818 956 1900 <br />Telma@abrari.com <br />2860 WALNUT AVE. <br />SIGNAL HILL, CA 90755 <br />562 897 2749 <br />Ted@associatedsoils.com <br />3203 E. 4TH ST <br />LOS ANGELES, CA 90063 <br />213 537 0480 <br />Office@loc-arch.com <br />1801 E. CHESTNUT AVE. <br />SANTA ANA, CA 92701 <br />714 647 6575 <br />Efisher@santa-ana.org <br />SANTA ANA ZOO <br />EDUCATION HUB <br />JULY 17TH, 2025 <br />25 <br />SANTA ANA ZOO EDUCATION HUB <br />1821 & 1823 E. CHESTNUT AVE. <br />SANTA ANA, CA 92701 <br />TR 24 LOT 4 ALL -EX FREEWAY- <br />STAFFORD & TUSTIN TR LOT A ELY 379 FT -EX FREEWAY& ST- <br />402-212-01, 402-212-02, 402-221-01 <br />791,000 SF (18 AC+/-) <br />O <br />OS, OPEN SPACE <br />N/A <br />N/A <br />N/A <br />ZOO PARKING EXISTING (189 PARKING SPACES + 6 HANDICAPPED SPACES) <br />TO REMAIN <br />FUTURE PROJECT BY SANTA ANA PUBLIC WORKS <br />BUILDING A: A-3 ; BUILDING B: B/S-1 <br />N/A <br />BUILDING A: 3,328 SF ; BUILDING B: 7,084 SF. TOTAL SF: 10,412 SF <br />BUILDING A: 1 ; BUILDING B: 2 <br />BUILDING A: 21'-1 1/2" ; BUILDING B: 30'-8 1/2" <br />TYPE V-B <br />N/A <br />FULLY SPRINKLERED NFPA 13 <br />NONE <br />NONE <br />ZONE X (MINIMAL FLOOD HAZARD) <br />THE APPLICABLE CODES & STANDARDS FOR THE PROJECT INCLUDE: <br />•2022 CALIFORNIA BUILDING CODE (CBC) <br />•2022 CALIFORNIA MECHANICAL CODE (CMC) <br />•2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />•2022 CALIFORNIA PLUMBING CODE (CPC) <br />•2022 CALIFORNIA FIRE CODE (CFC) <br />•2022 CALIFORNIA ENERGY CODE (CEC) <br />•2022 CALIFORNIA GREEN CODE (CGC) <br />•2022 CALIFORNIA GREEN STANDARDS CODE (CALGREEN) <br />•TITLE 24 <br />REFERENCED STANDARDS APPLICABLE TO THE PROJECT INCLUDE: <br />•NFPA 10 PORTABLE FIRE EXTINGUISHERS (2021 EDITION) <br />•NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS (2022 EDITION) <br />•NFPA 72 NATIONAL FIRE ALARM CODE (2022 EDITION) <br />THE AUTHORITIES HAVING JURISDICTION INCLUDE THE FOLLOWING: <br />•SANTA ANA MUNICIPAL CODE <br />•ORANGE COUNTY FIRE AUTHORITY <br />THE FOLLOWING SYSTEMS WILL BE PROVIDED AS REQUIRED BY THE APPLICABLE CODES <br />AND LIFE SAFETY STRATEGY: <br />•PORTABLE FIRE EXTINGUISHERS (INSTALLED AS PER NFPA 10) <br />•AUTOMATIC SPRINKLER SYSTEM SUPERVISED BY THE FIRE ALARM SYSTEM (INSTALLED AS <br />PER NFPA 13) <br />•FIRE ALARM SYSTEM WITH VOICE AND VISIBLE NOTIFICATION (INSTALLED AS PER NFPA 72) <br />DEMOLITION SCOPE: <br />• DEMOLITION OF PORTION OF EXISTING BRICK WALKWAYS <br />• DEMOLITION OF PORTION OF EXISTING PATH <br />• DEMOLITION OF EXISTING CHAIN LINK FENCE <br />• DEMOLITION OF UNDERGROUND TELEPHONE LINE <br />• DEMOLITION OF EXISTING PLANTER <br />FIRE SPRINKLERS <br />FIRE ALARM <br />BUILDING SIGNAGE <br />PV SYSTEM <br />NEW SCOPE: <br />• NEW TWO 2 STORY TYPE V-B BUILDING CONTAINING NEW WALLS, FLOORS, <br />ROOF, AND CEILINGS. <br />• ADDITION OF LANDSCAPE CONCRETE PATHWAYS, PLANTING, BENCHES, AND <br />EXTERIOR LIGHTING <br />• NEW SEWER CONNECTION, DOMESTIC WATER AND ELECTRICAL LINES <br />• NEW CONCRETE COLUMNS, BEAMS, AND SLAB <br />• NEW STEEL AND WOOD COLUMNS, BEAMS, AND STRUCTURE <br />• NEW MECHANICAL UNITS, DUCTS, SUPPLY, AND RETURNS. <br />• NEW PLUMBING FIXTURES AND PIPING <br />• NEW ELECTRICAL OUTLETS AND LIGHTING FIXTURES <br />• NEW ELEVATOR AND STAIRCASES <br />• NEW FIXED FURNISHINGS AND MILLWORK <br />SHEET #SHEET NAME 05 <br />/ <br />0 <br />6 <br />/ <br />2 <br />4 <br /> <br />P <br />R <br />I <br />C <br />I <br />N <br />G <br /> <br />P <br />A <br />C <br />K <br />A <br />G <br />E <br />08 <br />/ <br />1 <br />4 <br />/ <br />2 <br />4 <br /> <br />D <br />R <br />C <br /> <br />P <br />C <br />0 <br />1 <br />11 <br />/ <br />2 <br />1 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />D <br />R <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />2 <br />11 <br />/ <br />2 <br />6 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />1 <br />28 <br />/ <br />0 <br />3 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />2 <br />28 <br />/ <br />0 <br />3 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />I <br />D <br /> <br />S <br />E <br />T <br />08 <br />/ <br />0 <br />5 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />3 <br />29 <br />/ <br />0 <br />5 <br />/ <br />2 <br />5 <br /> <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />4 <br />12 <br />/ <br />0 <br />6 <br />/ <br />2 <br />5 <br /> <br />B <br />I <br />D <br /> <br />A <br />D <br />D <br />E <br />N <br />D <br />U <br />M <br /> <br />0 <br />1 <br />GENERAL <br />G0.1 COVER SHEET • • • • • • • • • <br />G0.2 SHEET INDEX AND PROJECT DATA • • • • • • • • • <br />G0.3 GENERAL NOTES • • • • • • • • <br />G0.4.1 CODE ANALYSIS • • • • • • • • <br />G0.4.2 CODE ANALYSIS • • • • • <br />G0.5.1 ADA DETAILS • • • • • • • • <br />G0.5.2 ADA SIGNAGE DETAILS • • • • • • • • <br />G0.5.3 MOUNTING HEIGHTS AND REACH <br />RANGES <br />• • • • • • • <br />• <br />G0.6 TYP CEILING DETAILS • • • • • • • • <br />G0.7.1 GREEN CODE COMPLIANCE • • • • • • • • <br />G0.7.2 GREEN CODE COMPLIANCE • • • • • • • • <br />G0.7.3 GREEN CODE COMPLIANCE • • • • • • • • <br />G0.8.1 BLDG A TITLE 24 REPORT • • • • • • • <br />G0.8.2 BLDG A TITLE 24 REPORT • • • • • • • <br />G0.8.3 BLDG A TITLE 24 REPORT • • • • • • • <br />G0.8.4 BLDG B TITLE 24 REPORT • • • • • • • <br />G0.8.5 BLDG B TITLE 24 REPORT • • • • • • • <br />G0.8.6 BLDG B TITLE 24 REPORT • • • • • • • <br />CIVIL <br />C0.01 TITLE SHEET • • • • • • • • <br />C1.00 SURVEY • • • • • • • • <br />C1.10 EROSION CONTROL PLAN • • • • • • • • <br />C1.11 EROSION CONTROL PLAN • • • • • • • • <br />C1.20 DEMOLITION PLAN-PHASE 1 • • • • • • • • <br />C1.21 DEMOLITION PLAN-PHASE 2 • • • • • • • • <br />C1.30 GRADING PLAN-PHASE 1 • • • • • • • • <br />C1.31 PAVING PLAN-PHASE 1 • • • • • • • • <br />C1.32 ROUGH GRADING PLAN-PHASE 1 • • • • • • <br />C1.33 GRADING PLAN SECTIONS • • • • <br />C1.34 GRADING PLAN-PHASE 2 • • • • <br />C1.35 PAVING PLAN-PHASE 2 • • • • <br />C1.36 ROUGH GRADING PLAN-PHASE 2 • • • • <br />C1.40 UTILITY PLAN- PHASE 1 • • • • • • • • <br />C1.41 UTILITY PLAN-PHASE 1 • • • • • • • • <br />C1.42 UTILITY PLAN-PHASE 2 • • • • <br />C5.00 CIVIL DETAILS • • • • • • • • <br />C5.01 CIVIL DETAILS- WATER AND SEWER • • • • • • • • <br />C5.02 CIVIL DETAILS- STORM DRAIN • • • • • • • • <br />LANDSCAPE <br />L0.01 TITLE SHEET • • • • • • • <br />L0.02 PHASING PLAN • • • • <br />L1.01 LANDSCAPE LAYOUT AND MATERIALS <br />PLAN <br />• • • • • • <br />• <br />L2.01 SITE DETAILS • • • • • • • <br />L2.02 SITE DETAILS • • • • • • • <br />L2.03 SITE DETAILS • • • • • • • <br />L2.04 SITE DETAILS • • • • • • • <br />L3.00A IRRIGATION LEGEND AND NOTES • • • • • • • <br />L3.00B IRRIGATION WATER USE DATA • • • • • • • <br />L3.00C IRRIGATION SPECIFICATIONS • • • • • • • <br />L3.01 IRRIGATION PLAN • • • • • • • <br />L3.02 IRRIGATION PLAN • • • • • • • <br />L3.20 IRRIGATION DETAILS • • • • • • • <br />L3.21 IRRIGATION DETAILS • • • • • • • <br />L4.00 PLANT PALETTE AND NOTES • • • • • • • <br />L4.01 PLANTING PLAN • • • • • • • <br />L4.20 PLANTING DETAILS • • • • • • • <br />L5.01 LANDSCAPE LIGHTING PLAN • • • • • • • <br />L5.20 LANDSCAPE LIGHTING DETAILS • • • • • • • <br />ARCHITECTURAL <br />A1.1 SITE PLAN • • • • • • • • • <br />A1.2 DEMOLITION SITE PLAN • • • • • • • • • <br />A1.3 PHASING PLAN • • • • • • • • <br />A1.4 ZOO MASTER ADDRESSING PLAN • • • • • • • <br />A1.5 SITE PLAN WITH PARKING • • • • • <br />A3.0.1 KEY PLANS • • • • • • • • • <br />A3.0.2 KEY PLANS • • • • • • • • • <br />A3.0.3 KEY PLANS • • • • • • • • • <br />A3.1.1A FLOOR PLANS • • • • • • • • • <br />A3.1.1B FLOOR PLANS • • • • • • • • • <br />A3.1.2B FLOOR PLANS • • • • • • • • • <br />A3.1.3B FLOOR PLANS • • • • • • • • • <br />A3.2.1A REFLECTED CEILING PLANS • • • • • • • • <br />A3.2.1B REFLECTED CEILING PLANS • • • • • • • • <br />A3.2.2B REFLECTED CEILING PLAN • • • • • • • • <br />A3.3.1A FURNITURE, POWER AND DATA PLANS • • • • • • • • <br />A3.3.1B FURNITURE, POWER AND DATA PLANS • • • • • • • • <br />A3.3.2B FURNITURE, POWER AND DATA PLANS • • • • • • • • <br />A3.4.1A SIGNAGE PLAN • • • • • • • • <br />A3.4.1B SIGNAGE PLAN • • • • • • • • <br />A3.4.2B SIGNAGE PLAN • • • • • • • • <br />A3.5.1A SLAB PLAN • • • • • • • • <br />A3.5.1B SLAB PLAN • • • • • • • • <br />A3.5.2B SLAB PLAN • • • • • • • • <br />FIRST ST. <br />E. MAIN ST. <br />ZO <br />O <br /> <br />L <br />N <br />. <br />5 FWY <br />SANTA ANA ZOO <br />1801 E. CHESTNUT AVE. <br />SANTA ANA, CA 92701 <br />DEFERRED SUBMITTALS TO BE REVIEWED BY PROJECT ARCHITECT OR ENGINEER OF RECORD <br />AND CERTIFIED PRIOR TO SUBMITTAL FOR PLAN REVIEW. <br />No.Description Date <br />1 DRC SUBMITTAL 02 11/21/24 <br />3 PC01 CORRECTIONS 03/28/25 <br />6 PC SUBMITTAL 03 04/28/25 <br />7 PC SUBMITTAL 04 05/30/25 <br />8 BID ADDENDUM 01 06/06/25 <br />9 PC SUBMITTAL 06 07/31/25 <br />SHEET #SHEET NAME 05 <br />/ <br />0 <br />6 <br />/ <br />2 <br />4 <br /> <br />P <br />R <br />I <br />C <br />I <br />N <br />G <br /> <br />P <br />A <br />C <br />K <br />A <br />G <br />E <br />08 <br />/ <br />1 <br />4 <br />/ <br />2 <br />4 <br /> <br />D <br />R <br />C <br /> <br />P <br />C <br />0 <br />1 <br />11 <br />/ <br />2 <br />1 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />D <br />R <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />2 <br />11 <br />/ <br />2 <br />6 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />1 <br />28 <br />/ <br />0 <br />3 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />2 <br />28 <br />/ <br />0 <br />3 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />I <br />D <br /> <br />S <br />E <br />T <br />08 <br />/ <br />0 <br />5 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />3 <br />29 <br />/ <br />0 <br />5 <br />/ <br />2 <br />5 <br /> <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />4 <br />12 <br />/ <br />0 <br />6 <br />/ <br />2 <br />5 <br /> <br />B <br />I <br />D <br /> <br />A <br />D <br />D <br />E <br />N <br />D <br />U <br />M <br /> <br />0 <br />1 <br />A4.0.1 KEY ELEVATIONS • • • • • • • • • <br />A4.0.2 KEY ELEVATIONS • • • • • • • • • <br />A4.1.0 BUILDING A ELEVATIONS • • • • • • • • • <br />A4.2.0 BUILDING B ELEVATIONS • • • • • • • • • <br />A4.2.1 BUILDING B ELEVATION • • • • • • • • • <br />A5.0.1 KEY SECTIONS • • • • • • • • <br />A5.1.0 BUILDING SECTIONS BUILDING A • • • • • • • • <br />A5.1.1 BUILDING SECTIONS BUILDING B • • • • • • • • <br />A5.1.2 BUILDING SECTIONS BUILDING B • • • • • • • • <br />A5.1.3 BUILDING SECTIONS BUILDING B • • • • • • • • <br />A5.1.4 BUILDING SECTIONS BUILDING B • • • • • • • • <br />A5.1.5 BUILDING SECTIONS BUILDING B • • • • • • • • <br />A5.1.6 BUILDING SECTIONS BUILDING B • • • • • • • • <br />A5.1.7 BUILDING SECTIONS BUILDING B • • • • • • • • <br />A6.0.1 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • <br />• <br />A6.0.2 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • <br />• <br />A6.1 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.2 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.3 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.4 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.5 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.6 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.7 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.8 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.9 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.10 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.11 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.12 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.13.1 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.13.2 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.13.3 ENLARGED PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • <br />• <br />A6.14 ENLARGED GATE PLANS/ SECTIONS/ <br />ELEVATIONS <br />• • • • • • • <br />• <br />A6.15.1 ENLARGED STAIRCASE PLANS/ <br />SECTIONS/ ELEVATIONS <br />• • • • • • • <br />• <br />A6.15.2 ENLARGED STAIRCASE PLANS/ <br />SECTIONS/ ELEVATIONS <br />• • • • • • • <br />• <br />A6.15.3 ENLARGED STAIRCASE PLANS/ <br />SECTIONS/ ELEVATIONS <br />• • • • • • • <br />• <br />A6.16 ENLARGED ELEVATOR PLANS/ <br />SECTIONS/ ELEVATIONS <br />• • • • • • • <br />• <br />A6.17 STOREFRONT PLANS AND ELEVATIONS • • • • • • • • <br />A7.1 BLDG A WALL SECTIONS • • • • • • • • <br />A7.2 WALL SECTIONS • • • • • • • • <br />A7.3 WALL SECTIONS • • • • • • • • <br />A7.4 WALL SECTIONS • • • • • • • • <br />A7.5 WALL SECTIONS • • • • • • • • <br />A7.6 WALL SECTIONS • • • • • • • <br />A8.1 TYPICAL ASSEMBLIES • • • • • • • • <br />A8.2 TYPICAL ASSEMBLIES • • • • • • • • <br />A8.3 DETAILS • • • • • • • • <br />A8.4 DETAILS • • • • • • • <br />A8.5 DETAILS • • • • • • • <br />A8.6 DETAILS • • • • • • • <br />A8.7 DETAILS • • • • • • • <br />A8.8 DETAILS • • • • • • • <br />A8.9 LANDSCAPE FOOTING DETAILS • • • • • • • <br />A8.10 MILLWORK DETAILS • • • • • • • <br />A8.11 MILLWORK DETAILS • • • • • • • <br />A8.12 MILLWORK DETAILS • • • • • • • <br />A9.1 PROJECT SCHEDULES • • • • • • • • <br />A9.2 WINDOW SCHEDULES • • • • • • • • <br />A9.3 DOOR AND GATE SCHEDULES • • • • • • • • <br />STRUCTURAL <br />S0.01 SHEET INDEX, SYMBOLS AND <br />ABBREVIATIONS <br />• • • • • • • <br />• <br />S0.02 GENERAL NOTES • • • • • • • • <br />S0.03 GENERAL NOTES • • • • • • • • <br />S1.00 SITE PLAN • • • • • • • • <br />S1.01A FOUNDATION FRAMING PLAN - <br />BUILDING A <br />• • • • • • • <br />• <br />S1.01B FOUNDATION FRAMING PLAN - <br />BUILDING B <br />• • • • • • • <br />• <br />SHEET #SHEET NAME 05 <br />/ <br />0 <br />6 <br />/ <br />2 <br />4 <br /> <br />P <br />R <br />I <br />C <br />I <br />N <br />G <br /> <br />P <br />A <br />C <br />K <br />A <br />G <br />E <br />08 <br />/ <br />1 <br />4 <br />/ <br />2 <br />4 <br /> <br />D <br />R <br />C <br /> <br />P <br />C <br />0 <br />1 <br />11 <br />/ <br />2 <br />1 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />D <br />R <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />2 <br />11 <br />/ <br />2 <br />6 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />1 <br />28 <br />/ <br />0 <br />3 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />2 <br />28 <br />/ <br />0 <br />3 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />I <br />D <br /> <br />S <br />E <br />T <br />08 <br />/ <br />0 <br />5 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />3 <br />29 <br />/ <br />0 <br />5 <br />/ <br />2 <br />5 <br /> <br /> <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />& <br /> <br />S <br />A <br />F <br />E <br />T <br />Y <br /> <br />P <br />C <br /> <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L <br /> <br />0 <br />4 <br />12 <br />/ <br />0 <br />6 <br />/ <br />2 <br />5 <br /> <br />B <br />I <br />D <br /> <br />A <br />D <br />D <br />E <br />N <br />D <br />U <br />M <br /> <br />0 <br />1 <br />S1.02A ROOF FRAMING PLAN - BUILDING A • • • • • • • • <br />S1.02B LEVEL 2 CMD + STEEL FRAMING PLAN - <br />BUILDING B <br />• • • • • • • <br />• <br />S1.03B LEVEL 2 WOOD FRAMING PLAN - <br />BUILDING B <br />• • • • • • • <br />• <br />S1.04B ROOF FRAMING PLAN - BUILDING B • • • • • • • • <br />S2.01 BUILDING B ELEVATION • • • • • • • • <br />S5.01 TYPICAL CONCRETE DETAILS • • • • • • • • <br />S5.02 TYPICAL CONCRETE DETAILS • • • • • • • • <br />S5.03 TYPICAL CONCRETE DETAILS • • • • • • • • <br />S5.11 CONCRETE SHEAR WALL DETAILS • • • • • • • • <br />S6.01 TYPICAL WOOD DETAILS • • • • • • • • <br />S6.02 TYPICAL WOOD DETAILS • • • • • • • • <br />S6.03 TYPICAL WOOD DETAILS • • • • • • • • <br />S6.04 TYPICAL WOOD DETAILS • • • • • • • • <br />S6.05 WOOD SHEAR WALL DETAILS • • • • • • • • <br />S6.06 WOOD SHEAR WALL DETAILS • • • • • • • • <br />S6.21 TJI DETAILS • • • • • • • • <br />S6.22 TJI-SHEAR WALL TRANSFER DETAILS • • • • • • • • <br />S7.01 TYPICAL STEEL DETAILS • • • • • • • • <br />S7.02 TYPICAL STEEL DETAILS • • • • • • • • <br />S7.11 TYPICAL METAL DECK DETAILS • • • • • • • • <br />S7.12 TYPICAL METAL DECK DETAILS • • • • • • • • <br />MECHANICAL <br />M-001 NOTES, LEGEND • • • • • • • • <br />M-002 SCHEDULES • • • • • • • • <br />M-003 SCHEDULES • • • • • • • • <br />M-004 SPECIFICATIONS • • • • • • • • <br />M-005 SPECIFICATIONS • • • • • • • • <br />M-006 TITLE-24 REQUIREMENTS FOR VRF PIPE <br />INSULATION <br />• • • • • <br />• <br />M-200 SITE PLAN • • • • • • <br />M-301 FIRST FLOOR PLAN • • • • • • • • <br />M-302 SECOND FLOOR PLAN • • • • • • • • <br />M-303 ROOF PLAN • • • • • • • • <br />M-304 FIRST FLOOR REFRIGERATION PIPING • • • • • • • • <br />M-305 SECOND FLOOR REGRIGERATION <br />PIPING <br />• • • • • • • <br />• <br />M-400 PIPING DIAGRAM • • • • • • • • <br />M-401 WIRING DIAGRAM • • • • • • • • <br />M-500 DETAILS • • • • • • • • <br />M-600 TITLE-24 BUILDING-A • <br />M-601 TITLE-24 BUILDING-A • <br />M-602 TITLE-24 BUILDING-B • <br />M-603 TITLE-24 BUILDING-B • <br />M-604 TITLE-24 BUILDING-B • <br />ELECTRICAL <br />E-1.0 NOTES & SYMBOLS • • • • • • • • <br />E-2.0 SINGLE LINE DIAGRAM & LOAD CALCS. • • • • • • • • <br />E-2.1 PANEL SCHEDULES • • • • • • • • <br />E-2.2 FIXTURES SCHEDULES • • • • • • • • <br />E-2.3 CONTROL SWITCH SCHEDULE • • • • • • • • <br />E-3.0 SITE ELECTRICAL PLAN • • • • • • • • <br />E-3.1 EXTERIOR LIGHTING PLAN • • • • • • • • <br />E-4.0 1ST. FLR. BUILDING A LIGHTING PLAN • • • • • • • • <br />E-4.1 1ST. FLR. BUILDING A POWER PLAN • • • • • • • • <br />E-4.2 1ST. FLR. BUILDING A L.V. PLAN • • • • • <br />E-4.3 LIGHTING CONTROL PLAN • • • • • • <br />E-5.0 1ST. FLR. BUILDING B LIGHTING PLAN • • • • • • • • <br />E-5.1 1ST. FLR. BUILDING B POWER PLAN • • • • • • <br />E-5.2 1ST. FLR. BUILDING B L.V. PLAN • • • • • <br />E-5.3 LIGHTING CONTROL PLAN • • • • • • <br />E-6.0 2ND FLR. BUILDING B LIGHTING PLAN • • • • • • • • <br />E-6.1 2ND FLR. BUILDING B POWER PLAN • • • • • • <br />E-6.2 2ND FLR. BUILDING B L.V. PLAN • • • • • <br />E-6.3 LIGHTING CONTROL PLAN • • • • • • <br />E-7.0 ROOF ELECTRICAL PLAN • • <br />E-8.0 TITLE 24 ENERGY CALCULATIONS • • • • • • • • <br />E-8.1 TITLE 24 ENERGY CALCULATIONS • • • • • • • • <br />E-9.0 1ST FLR. BUILDING A EM. PHM PLAN • • • • • • <br />E-9.1 1ST FLR. BUILDING B EM. PHM PLAN • • • • • • <br />E-9.2 2ND FLR. BUILDING B EM. PHM PLAN • • • • • • <br />PLUMBING <br />P-001 NOTES, LEGEND • • • • • • • • <br />P-002 SCHEDULES • • • • • • • • <br />P-3.00 PHASE 1 SITE PLAN • • • • • <br />P-3.01 FIRST FLOOR PLAN • • • • • • • • <br />P-3.02 SECOND FLOOR PLAN • • • • • • • • <br />P-3.03 ROOF PLAN • • • • • • • • <br />P-4.01 HOT AND COLD WATER RISER DIAGRAM • • • • • • • • <br />P-4.02 WASTE & VENT RISER DIAGRAM • • • • • • • • <br />P-500 DETAILS • • • • • • • • <br />9