|
LOC
<br />PROJECT
<br />COPYRIGHT LOC, INC
<br />ORIGINAL SHEET SIZE: 42" X 30"
<br />SHEET INDEXVICINITY MAP PROJECT SCOPE OF WORK
<br />PROJECT DATA
<br />PROPERTY DESCRIPTION
<br />PROJECT NAME:
<br />ADDRESS:
<br />LEGAL DESCRIPTION:
<br />APN:
<br />ZONING INFORMATION
<br />LOT SIZE:
<br />ZONE:
<br />LAND USE DESIGNATION:
<br />MAXIMUM HEIGHT:
<br />MAXIMUM FAR:
<br />SETBACKS REQUIRED:
<br />PARKING
<br />EXISTING
<br />PROVIDED
<br />EV PARKING
<br />BUILDING AND SAFETY INFORMATION:
<br />OCCUPANCY:
<br />AREA EXISTING:
<br />AREA PROPOSED:
<br />NO. OF STORIES:
<br />BUILDING HEIGHT:
<br />BUILDING CONSTRUCTION:
<br />FIRE SPRINKLERS, EXISTING:
<br />FIRE SPRINKERS, PROPOSED:
<br />SEPARATIONS REQUIRED:
<br />YARD REQUIREMENTS:
<br />FEMA DESIGNATED FLOOD ZONE:
<br />APPLICABLE CODES & STANDARDS
<br />PROJECT DIRECTORY
<br />DEFERRED APPROVALS
<br />CLIENT:ARCHITECT:
<br />CLIENT:
<br />ARCHITECT:
<br />CONSULTANTS:
<br />PREPARED UNDER THE SUPERVISION OF:
<br />ALI JEEVANJEE
<br />LOC ARCHITECTS DATE
<br />REVIEWED FOR CONSTRUCTABILITY:
<br />SEAN THOMAS
<br />PRINCIPAL CIVIL ENGINEER
<br />RCE NO.: 80470
<br />DATE
<br />RECOMMENDED FOR CONSTRUCTION:
<br />JASON GABRIEL
<br />PRINCIPAL CIVIL ENGINEER
<br />RCE NO.: 62968
<br />DATE
<br />7/
<br />3
<br />1
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />3
<br />:
<br />0
<br />5
<br />:
<br />3
<br />7
<br />
<br />P
<br />M
<br />2308
<br />G0.2
<br />SANTA ANA ZOO LOC
<br />ARCHITECTS
<br />KPFF
<br />STRUCTURAL ENGINEER
<br />KPFF
<br />CIVIL ENGINEER
<br />BORDER
<br />LANDSCAPE ARCHITECT
<br />ABRARI AND
<br />ASSOCIATES
<br />MEP ENGINEER
<br />ASSOCIATED
<br />SOILS
<br />ENGINEERING
<br />GEOTECHNICAL ENGINEER
<br />700 S. FLOWER, SUITE 2100
<br />LOS ANGELES, CA 90017
<br />213 372 5111
<br />Ramzi.hodali@kpff.com
<br />700 S. FLOWER, SUITE 2100
<br />LOS ANGELES, CA 90017
<br />213 372 5111
<br />Sharad.Ganju@kpff.com
<br />724 S. SPRING ST, SUITE 701
<br />LOS ANGELES, CA 90014
<br />213 372 5111
<br />Darren@border-la.com
<br />1713 S. STANDARD AVE
<br />GLENDALE, CA 91201
<br />818 956 1900
<br />Telma@abrari.com
<br />2860 WALNUT AVE.
<br />SIGNAL HILL, CA 90755
<br />562 897 2749
<br />Ted@associatedsoils.com
<br />1801 E. CHESTNUT AVE.
<br />SANTA ANA, CA 92701
<br />714 647 6575
<br />Efisher@santa-ana.org
<br />3203 E. 4TH ST
<br />LOS ANGELES, CA 90063
<br />213 537 0480
<br />Office@loc-arch.com
<br />SHEET INDEX
<br />AND PROJECT
<br />DATA
<br />JULY 17TH, 2025
<br />BID ADDENDUM
<br />01
<br />SANTA ANA ZOO
<br />1821 & 1823 E CHESTNUT AVE, SANTA
<br />ANA, CA 92701
<br />KPFF
<br />STRUCTURAL ENGINEER
<br />LOC ARCHITECTS
<br />KPFF
<br />CIVIL ENGINEER
<br />BORDER
<br />LANDSCAPE ARCHITECT
<br />ABRARI AND ASSOCIATES
<br />MEP ENGINEER
<br />ASSOCIATED SOILS ENGINEERING
<br />GEOTECHNICAL ENGINEER
<br />700 S. FLOWER, SUITE 2100
<br />LOS ANGELES, CA 90017
<br />213 372 5111
<br />Ramzi.hodali@kpff.com
<br />700 S. FLOWER, SUITE 2100
<br />LOS ANGELES, CA 90017
<br />213 372 5111
<br />Sharad.Ganju@kpff.com
<br />724 S. SPRING ST, SUITE 701
<br />LOS ANGELES, CA 90014
<br />213 372 5111
<br />Darren@border-la.com
<br />1713 S. STANDARD AVE
<br />GLENDALE, CA 91201
<br />818 956 1900
<br />Telma@abrari.com
<br />2860 WALNUT AVE.
<br />SIGNAL HILL, CA 90755
<br />562 897 2749
<br />Ted@associatedsoils.com
<br />3203 E. 4TH ST
<br />LOS ANGELES, CA 90063
<br />213 537 0480
<br />Office@loc-arch.com
<br />1801 E. CHESTNUT AVE.
<br />SANTA ANA, CA 92701
<br />714 647 6575
<br />Efisher@santa-ana.org
<br />SANTA ANA ZOO
<br />EDUCATION HUB
<br />JULY 17TH, 2025
<br />25
<br />SANTA ANA ZOO EDUCATION HUB
<br />1821 & 1823 E. CHESTNUT AVE.
<br />SANTA ANA, CA 92701
<br />TR 24 LOT 4 ALL -EX FREEWAY-
<br />STAFFORD & TUSTIN TR LOT A ELY 379 FT -EX FREEWAY& ST-
<br />402-212-01, 402-212-02, 402-221-01
<br />791,000 SF (18 AC+/-)
<br />O
<br />OS, OPEN SPACE
<br />N/A
<br />N/A
<br />N/A
<br />ZOO PARKING EXISTING (189 PARKING SPACES + 6 HANDICAPPED SPACES)
<br />TO REMAIN
<br />FUTURE PROJECT BY SANTA ANA PUBLIC WORKS
<br />BUILDING A: A-3 ; BUILDING B: B/S-1
<br />N/A
<br />BUILDING A: 3,328 SF ; BUILDING B: 7,084 SF. TOTAL SF: 10,412 SF
<br />BUILDING A: 1 ; BUILDING B: 2
<br />BUILDING A: 21'-1 1/2" ; BUILDING B: 30'-8 1/2"
<br />TYPE V-B
<br />N/A
<br />FULLY SPRINKLERED NFPA 13
<br />NONE
<br />NONE
<br />ZONE X (MINIMAL FLOOD HAZARD)
<br />THE APPLICABLE CODES & STANDARDS FOR THE PROJECT INCLUDE:
<br />•2022 CALIFORNIA BUILDING CODE (CBC)
<br />•2022 CALIFORNIA MECHANICAL CODE (CMC)
<br />•2022 CALIFORNIA ELECTRICAL CODE (CEC)
<br />•2022 CALIFORNIA PLUMBING CODE (CPC)
<br />•2022 CALIFORNIA FIRE CODE (CFC)
<br />•2022 CALIFORNIA ENERGY CODE (CEC)
<br />•2022 CALIFORNIA GREEN CODE (CGC)
<br />•2022 CALIFORNIA GREEN STANDARDS CODE (CALGREEN)
<br />•TITLE 24
<br />REFERENCED STANDARDS APPLICABLE TO THE PROJECT INCLUDE:
<br />•NFPA 10 PORTABLE FIRE EXTINGUISHERS (2021 EDITION)
<br />•NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS (2022 EDITION)
<br />•NFPA 72 NATIONAL FIRE ALARM CODE (2022 EDITION)
<br />THE AUTHORITIES HAVING JURISDICTION INCLUDE THE FOLLOWING:
<br />•SANTA ANA MUNICIPAL CODE
<br />•ORANGE COUNTY FIRE AUTHORITY
<br />THE FOLLOWING SYSTEMS WILL BE PROVIDED AS REQUIRED BY THE APPLICABLE CODES
<br />AND LIFE SAFETY STRATEGY:
<br />•PORTABLE FIRE EXTINGUISHERS (INSTALLED AS PER NFPA 10)
<br />•AUTOMATIC SPRINKLER SYSTEM SUPERVISED BY THE FIRE ALARM SYSTEM (INSTALLED AS
<br />PER NFPA 13)
<br />•FIRE ALARM SYSTEM WITH VOICE AND VISIBLE NOTIFICATION (INSTALLED AS PER NFPA 72)
<br />DEMOLITION SCOPE:
<br />• DEMOLITION OF PORTION OF EXISTING BRICK WALKWAYS
<br />• DEMOLITION OF PORTION OF EXISTING PATH
<br />• DEMOLITION OF EXISTING CHAIN LINK FENCE
<br />• DEMOLITION OF UNDERGROUND TELEPHONE LINE
<br />• DEMOLITION OF EXISTING PLANTER
<br />FIRE SPRINKLERS
<br />FIRE ALARM
<br />BUILDING SIGNAGE
<br />PV SYSTEM
<br />NEW SCOPE:
<br />• NEW TWO 2 STORY TYPE V-B BUILDING CONTAINING NEW WALLS, FLOORS,
<br />ROOF, AND CEILINGS.
<br />• ADDITION OF LANDSCAPE CONCRETE PATHWAYS, PLANTING, BENCHES, AND
<br />EXTERIOR LIGHTING
<br />• NEW SEWER CONNECTION, DOMESTIC WATER AND ELECTRICAL LINES
<br />• NEW CONCRETE COLUMNS, BEAMS, AND SLAB
<br />• NEW STEEL AND WOOD COLUMNS, BEAMS, AND STRUCTURE
<br />• NEW MECHANICAL UNITS, DUCTS, SUPPLY, AND RETURNS.
<br />• NEW PLUMBING FIXTURES AND PIPING
<br />• NEW ELECTRICAL OUTLETS AND LIGHTING FIXTURES
<br />• NEW ELEVATOR AND STAIRCASES
<br />• NEW FIXED FURNISHINGS AND MILLWORK
<br />SHEET #SHEET NAME 05
<br />/
<br />0
<br />6
<br />/
<br />2
<br />4
<br />
<br />P
<br />R
<br />I
<br />C
<br />I
<br />N
<br />G
<br />
<br />P
<br />A
<br />C
<br />K
<br />A
<br />G
<br />E
<br />08
<br />/
<br />1
<br />4
<br />/
<br />2
<br />4
<br />
<br />D
<br />R
<br />C
<br />
<br />P
<br />C
<br />0
<br />1
<br />11
<br />/
<br />2
<br />1
<br />/
<br />2
<br />0
<br />2
<br />4
<br />
<br />D
<br />R
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />2
<br />11
<br />/
<br />2
<br />6
<br />/
<br />2
<br />0
<br />2
<br />4
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />1
<br />28
<br />/
<br />0
<br />3
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />2
<br />28
<br />/
<br />0
<br />3
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />I
<br />D
<br />
<br />S
<br />E
<br />T
<br />08
<br />/
<br />0
<br />5
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />3
<br />29
<br />/
<br />0
<br />5
<br />/
<br />2
<br />5
<br />
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />4
<br />12
<br />/
<br />0
<br />6
<br />/
<br />2
<br />5
<br />
<br />B
<br />I
<br />D
<br />
<br />A
<br />D
<br />D
<br />E
<br />N
<br />D
<br />U
<br />M
<br />
<br />0
<br />1
<br />GENERAL
<br />G0.1 COVER SHEET • • • • • • • • •
<br />G0.2 SHEET INDEX AND PROJECT DATA • • • • • • • • •
<br />G0.3 GENERAL NOTES • • • • • • • •
<br />G0.4.1 CODE ANALYSIS • • • • • • • •
<br />G0.4.2 CODE ANALYSIS • • • • •
<br />G0.5.1 ADA DETAILS • • • • • • • •
<br />G0.5.2 ADA SIGNAGE DETAILS • • • • • • • •
<br />G0.5.3 MOUNTING HEIGHTS AND REACH
<br />RANGES
<br />• • • • • • •
<br />•
<br />G0.6 TYP CEILING DETAILS • • • • • • • •
<br />G0.7.1 GREEN CODE COMPLIANCE • • • • • • • •
<br />G0.7.2 GREEN CODE COMPLIANCE • • • • • • • •
<br />G0.7.3 GREEN CODE COMPLIANCE • • • • • • • •
<br />G0.8.1 BLDG A TITLE 24 REPORT • • • • • • •
<br />G0.8.2 BLDG A TITLE 24 REPORT • • • • • • •
<br />G0.8.3 BLDG A TITLE 24 REPORT • • • • • • •
<br />G0.8.4 BLDG B TITLE 24 REPORT • • • • • • •
<br />G0.8.5 BLDG B TITLE 24 REPORT • • • • • • •
<br />G0.8.6 BLDG B TITLE 24 REPORT • • • • • • •
<br />CIVIL
<br />C0.01 TITLE SHEET • • • • • • • •
<br />C1.00 SURVEY • • • • • • • •
<br />C1.10 EROSION CONTROL PLAN • • • • • • • •
<br />C1.11 EROSION CONTROL PLAN • • • • • • • •
<br />C1.20 DEMOLITION PLAN-PHASE 1 • • • • • • • •
<br />C1.21 DEMOLITION PLAN-PHASE 2 • • • • • • • •
<br />C1.30 GRADING PLAN-PHASE 1 • • • • • • • •
<br />C1.31 PAVING PLAN-PHASE 1 • • • • • • • •
<br />C1.32 ROUGH GRADING PLAN-PHASE 1 • • • • • •
<br />C1.33 GRADING PLAN SECTIONS • • • •
<br />C1.34 GRADING PLAN-PHASE 2 • • • •
<br />C1.35 PAVING PLAN-PHASE 2 • • • •
<br />C1.36 ROUGH GRADING PLAN-PHASE 2 • • • •
<br />C1.40 UTILITY PLAN- PHASE 1 • • • • • • • •
<br />C1.41 UTILITY PLAN-PHASE 1 • • • • • • • •
<br />C1.42 UTILITY PLAN-PHASE 2 • • • •
<br />C5.00 CIVIL DETAILS • • • • • • • •
<br />C5.01 CIVIL DETAILS- WATER AND SEWER • • • • • • • •
<br />C5.02 CIVIL DETAILS- STORM DRAIN • • • • • • • •
<br />LANDSCAPE
<br />L0.01 TITLE SHEET • • • • • • •
<br />L0.02 PHASING PLAN • • • •
<br />L1.01 LANDSCAPE LAYOUT AND MATERIALS
<br />PLAN
<br />• • • • • •
<br />•
<br />L2.01 SITE DETAILS • • • • • • •
<br />L2.02 SITE DETAILS • • • • • • •
<br />L2.03 SITE DETAILS • • • • • • •
<br />L2.04 SITE DETAILS • • • • • • •
<br />L3.00A IRRIGATION LEGEND AND NOTES • • • • • • •
<br />L3.00B IRRIGATION WATER USE DATA • • • • • • •
<br />L3.00C IRRIGATION SPECIFICATIONS • • • • • • •
<br />L3.01 IRRIGATION PLAN • • • • • • •
<br />L3.02 IRRIGATION PLAN • • • • • • •
<br />L3.20 IRRIGATION DETAILS • • • • • • •
<br />L3.21 IRRIGATION DETAILS • • • • • • •
<br />L4.00 PLANT PALETTE AND NOTES • • • • • • •
<br />L4.01 PLANTING PLAN • • • • • • •
<br />L4.20 PLANTING DETAILS • • • • • • •
<br />L5.01 LANDSCAPE LIGHTING PLAN • • • • • • •
<br />L5.20 LANDSCAPE LIGHTING DETAILS • • • • • • •
<br />ARCHITECTURAL
<br />A1.1 SITE PLAN • • • • • • • • •
<br />A1.2 DEMOLITION SITE PLAN • • • • • • • • •
<br />A1.3 PHASING PLAN • • • • • • • •
<br />A1.4 ZOO MASTER ADDRESSING PLAN • • • • • • •
<br />A1.5 SITE PLAN WITH PARKING • • • • •
<br />A3.0.1 KEY PLANS • • • • • • • • •
<br />A3.0.2 KEY PLANS • • • • • • • • •
<br />A3.0.3 KEY PLANS • • • • • • • • •
<br />A3.1.1A FLOOR PLANS • • • • • • • • •
<br />A3.1.1B FLOOR PLANS • • • • • • • • •
<br />A3.1.2B FLOOR PLANS • • • • • • • • •
<br />A3.1.3B FLOOR PLANS • • • • • • • • •
<br />A3.2.1A REFLECTED CEILING PLANS • • • • • • • •
<br />A3.2.1B REFLECTED CEILING PLANS • • • • • • • •
<br />A3.2.2B REFLECTED CEILING PLAN • • • • • • • •
<br />A3.3.1A FURNITURE, POWER AND DATA PLANS • • • • • • • •
<br />A3.3.1B FURNITURE, POWER AND DATA PLANS • • • • • • • •
<br />A3.3.2B FURNITURE, POWER AND DATA PLANS • • • • • • • •
<br />A3.4.1A SIGNAGE PLAN • • • • • • • •
<br />A3.4.1B SIGNAGE PLAN • • • • • • • •
<br />A3.4.2B SIGNAGE PLAN • • • • • • • •
<br />A3.5.1A SLAB PLAN • • • • • • • •
<br />A3.5.1B SLAB PLAN • • • • • • • •
<br />A3.5.2B SLAB PLAN • • • • • • • •
<br />FIRST ST.
<br />E. MAIN ST.
<br />ZO
<br />O
<br />
<br />L
<br />N
<br />.
<br />5 FWY
<br />SANTA ANA ZOO
<br />1801 E. CHESTNUT AVE.
<br />SANTA ANA, CA 92701
<br />DEFERRED SUBMITTALS TO BE REVIEWED BY PROJECT ARCHITECT OR ENGINEER OF RECORD
<br />AND CERTIFIED PRIOR TO SUBMITTAL FOR PLAN REVIEW.
<br />No.Description Date
<br />1 DRC SUBMITTAL 02 11/21/24
<br />3 PC01 CORRECTIONS 03/28/25
<br />6 PC SUBMITTAL 03 04/28/25
<br />7 PC SUBMITTAL 04 05/30/25
<br />8 BID ADDENDUM 01 06/06/25
<br />9 PC SUBMITTAL 06 07/31/25
<br />SHEET #SHEET NAME 05
<br />/
<br />0
<br />6
<br />/
<br />2
<br />4
<br />
<br />P
<br />R
<br />I
<br />C
<br />I
<br />N
<br />G
<br />
<br />P
<br />A
<br />C
<br />K
<br />A
<br />G
<br />E
<br />08
<br />/
<br />1
<br />4
<br />/
<br />2
<br />4
<br />
<br />D
<br />R
<br />C
<br />
<br />P
<br />C
<br />0
<br />1
<br />11
<br />/
<br />2
<br />1
<br />/
<br />2
<br />0
<br />2
<br />4
<br />
<br />D
<br />R
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />2
<br />11
<br />/
<br />2
<br />6
<br />/
<br />2
<br />0
<br />2
<br />4
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />1
<br />28
<br />/
<br />0
<br />3
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />2
<br />28
<br />/
<br />0
<br />3
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />I
<br />D
<br />
<br />S
<br />E
<br />T
<br />08
<br />/
<br />0
<br />5
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />3
<br />29
<br />/
<br />0
<br />5
<br />/
<br />2
<br />5
<br />
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />4
<br />12
<br />/
<br />0
<br />6
<br />/
<br />2
<br />5
<br />
<br />B
<br />I
<br />D
<br />
<br />A
<br />D
<br />D
<br />E
<br />N
<br />D
<br />U
<br />M
<br />
<br />0
<br />1
<br />A4.0.1 KEY ELEVATIONS • • • • • • • • •
<br />A4.0.2 KEY ELEVATIONS • • • • • • • • •
<br />A4.1.0 BUILDING A ELEVATIONS • • • • • • • • •
<br />A4.2.0 BUILDING B ELEVATIONS • • • • • • • • •
<br />A4.2.1 BUILDING B ELEVATION • • • • • • • • •
<br />A5.0.1 KEY SECTIONS • • • • • • • •
<br />A5.1.0 BUILDING SECTIONS BUILDING A • • • • • • • •
<br />A5.1.1 BUILDING SECTIONS BUILDING B • • • • • • • •
<br />A5.1.2 BUILDING SECTIONS BUILDING B • • • • • • • •
<br />A5.1.3 BUILDING SECTIONS BUILDING B • • • • • • • •
<br />A5.1.4 BUILDING SECTIONS BUILDING B • • • • • • • •
<br />A5.1.5 BUILDING SECTIONS BUILDING B • • • • • • • •
<br />A5.1.6 BUILDING SECTIONS BUILDING B • • • • • • • •
<br />A5.1.7 BUILDING SECTIONS BUILDING B • • • • • • • •
<br />A6.0.1 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • •
<br />•
<br />A6.0.2 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • •
<br />•
<br />A6.1 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.2 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.3 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.4 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.5 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.6 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.7 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.8 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.9 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.10 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.11 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.12 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.13.1 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.13.2 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.13.3 ENLARGED PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • •
<br />•
<br />A6.14 ENLARGED GATE PLANS/ SECTIONS/
<br />ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.15.1 ENLARGED STAIRCASE PLANS/
<br />SECTIONS/ ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.15.2 ENLARGED STAIRCASE PLANS/
<br />SECTIONS/ ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.15.3 ENLARGED STAIRCASE PLANS/
<br />SECTIONS/ ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.16 ENLARGED ELEVATOR PLANS/
<br />SECTIONS/ ELEVATIONS
<br />• • • • • • •
<br />•
<br />A6.17 STOREFRONT PLANS AND ELEVATIONS • • • • • • • •
<br />A7.1 BLDG A WALL SECTIONS • • • • • • • •
<br />A7.2 WALL SECTIONS • • • • • • • •
<br />A7.3 WALL SECTIONS • • • • • • • •
<br />A7.4 WALL SECTIONS • • • • • • • •
<br />A7.5 WALL SECTIONS • • • • • • • •
<br />A7.6 WALL SECTIONS • • • • • • •
<br />A8.1 TYPICAL ASSEMBLIES • • • • • • • •
<br />A8.2 TYPICAL ASSEMBLIES • • • • • • • •
<br />A8.3 DETAILS • • • • • • • •
<br />A8.4 DETAILS • • • • • • •
<br />A8.5 DETAILS • • • • • • •
<br />A8.6 DETAILS • • • • • • •
<br />A8.7 DETAILS • • • • • • •
<br />A8.8 DETAILS • • • • • • •
<br />A8.9 LANDSCAPE FOOTING DETAILS • • • • • • •
<br />A8.10 MILLWORK DETAILS • • • • • • •
<br />A8.11 MILLWORK DETAILS • • • • • • •
<br />A8.12 MILLWORK DETAILS • • • • • • •
<br />A9.1 PROJECT SCHEDULES • • • • • • • •
<br />A9.2 WINDOW SCHEDULES • • • • • • • •
<br />A9.3 DOOR AND GATE SCHEDULES • • • • • • • •
<br />STRUCTURAL
<br />S0.01 SHEET INDEX, SYMBOLS AND
<br />ABBREVIATIONS
<br />• • • • • • •
<br />•
<br />S0.02 GENERAL NOTES • • • • • • • •
<br />S0.03 GENERAL NOTES • • • • • • • •
<br />S1.00 SITE PLAN • • • • • • • •
<br />S1.01A FOUNDATION FRAMING PLAN -
<br />BUILDING A
<br />• • • • • • •
<br />•
<br />S1.01B FOUNDATION FRAMING PLAN -
<br />BUILDING B
<br />• • • • • • •
<br />•
<br />SHEET #SHEET NAME 05
<br />/
<br />0
<br />6
<br />/
<br />2
<br />4
<br />
<br />P
<br />R
<br />I
<br />C
<br />I
<br />N
<br />G
<br />
<br />P
<br />A
<br />C
<br />K
<br />A
<br />G
<br />E
<br />08
<br />/
<br />1
<br />4
<br />/
<br />2
<br />4
<br />
<br />D
<br />R
<br />C
<br />
<br />P
<br />C
<br />0
<br />1
<br />11
<br />/
<br />2
<br />1
<br />/
<br />2
<br />0
<br />2
<br />4
<br />
<br />D
<br />R
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />2
<br />11
<br />/
<br />2
<br />6
<br />/
<br />2
<br />0
<br />2
<br />4
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />1
<br />28
<br />/
<br />0
<br />3
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />2
<br />28
<br />/
<br />0
<br />3
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />I
<br />D
<br />
<br />S
<br />E
<br />T
<br />08
<br />/
<br />0
<br />5
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />3
<br />29
<br />/
<br />0
<br />5
<br />/
<br />2
<br />5
<br />
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />
<br />&
<br />
<br />S
<br />A
<br />F
<br />E
<br />T
<br />Y
<br />
<br />P
<br />C
<br />
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
<br />
<br />0
<br />4
<br />12
<br />/
<br />0
<br />6
<br />/
<br />2
<br />5
<br />
<br />B
<br />I
<br />D
<br />
<br />A
<br />D
<br />D
<br />E
<br />N
<br />D
<br />U
<br />M
<br />
<br />0
<br />1
<br />S1.02A ROOF FRAMING PLAN - BUILDING A • • • • • • • •
<br />S1.02B LEVEL 2 CMD + STEEL FRAMING PLAN -
<br />BUILDING B
<br />• • • • • • •
<br />•
<br />S1.03B LEVEL 2 WOOD FRAMING PLAN -
<br />BUILDING B
<br />• • • • • • •
<br />•
<br />S1.04B ROOF FRAMING PLAN - BUILDING B • • • • • • • •
<br />S2.01 BUILDING B ELEVATION • • • • • • • •
<br />S5.01 TYPICAL CONCRETE DETAILS • • • • • • • •
<br />S5.02 TYPICAL CONCRETE DETAILS • • • • • • • •
<br />S5.03 TYPICAL CONCRETE DETAILS • • • • • • • •
<br />S5.11 CONCRETE SHEAR WALL DETAILS • • • • • • • •
<br />S6.01 TYPICAL WOOD DETAILS • • • • • • • •
<br />S6.02 TYPICAL WOOD DETAILS • • • • • • • •
<br />S6.03 TYPICAL WOOD DETAILS • • • • • • • •
<br />S6.04 TYPICAL WOOD DETAILS • • • • • • • •
<br />S6.05 WOOD SHEAR WALL DETAILS • • • • • • • •
<br />S6.06 WOOD SHEAR WALL DETAILS • • • • • • • •
<br />S6.21 TJI DETAILS • • • • • • • •
<br />S6.22 TJI-SHEAR WALL TRANSFER DETAILS • • • • • • • •
<br />S7.01 TYPICAL STEEL DETAILS • • • • • • • •
<br />S7.02 TYPICAL STEEL DETAILS • • • • • • • •
<br />S7.11 TYPICAL METAL DECK DETAILS • • • • • • • •
<br />S7.12 TYPICAL METAL DECK DETAILS • • • • • • • •
<br />MECHANICAL
<br />M-001 NOTES, LEGEND • • • • • • • •
<br />M-002 SCHEDULES • • • • • • • •
<br />M-003 SCHEDULES • • • • • • • •
<br />M-004 SPECIFICATIONS • • • • • • • •
<br />M-005 SPECIFICATIONS • • • • • • • •
<br />M-006 TITLE-24 REQUIREMENTS FOR VRF PIPE
<br />INSULATION
<br />• • • • •
<br />•
<br />M-200 SITE PLAN • • • • • •
<br />M-301 FIRST FLOOR PLAN • • • • • • • •
<br />M-302 SECOND FLOOR PLAN • • • • • • • •
<br />M-303 ROOF PLAN • • • • • • • •
<br />M-304 FIRST FLOOR REFRIGERATION PIPING • • • • • • • •
<br />M-305 SECOND FLOOR REGRIGERATION
<br />PIPING
<br />• • • • • • •
<br />•
<br />M-400 PIPING DIAGRAM • • • • • • • •
<br />M-401 WIRING DIAGRAM • • • • • • • •
<br />M-500 DETAILS • • • • • • • •
<br />M-600 TITLE-24 BUILDING-A •
<br />M-601 TITLE-24 BUILDING-A •
<br />M-602 TITLE-24 BUILDING-B •
<br />M-603 TITLE-24 BUILDING-B •
<br />M-604 TITLE-24 BUILDING-B •
<br />ELECTRICAL
<br />E-1.0 NOTES & SYMBOLS • • • • • • • •
<br />E-2.0 SINGLE LINE DIAGRAM & LOAD CALCS. • • • • • • • •
<br />E-2.1 PANEL SCHEDULES • • • • • • • •
<br />E-2.2 FIXTURES SCHEDULES • • • • • • • •
<br />E-2.3 CONTROL SWITCH SCHEDULE • • • • • • • •
<br />E-3.0 SITE ELECTRICAL PLAN • • • • • • • •
<br />E-3.1 EXTERIOR LIGHTING PLAN • • • • • • • •
<br />E-4.0 1ST. FLR. BUILDING A LIGHTING PLAN • • • • • • • •
<br />E-4.1 1ST. FLR. BUILDING A POWER PLAN • • • • • • • •
<br />E-4.2 1ST. FLR. BUILDING A L.V. PLAN • • • • •
<br />E-4.3 LIGHTING CONTROL PLAN • • • • • •
<br />E-5.0 1ST. FLR. BUILDING B LIGHTING PLAN • • • • • • • •
<br />E-5.1 1ST. FLR. BUILDING B POWER PLAN • • • • • •
<br />E-5.2 1ST. FLR. BUILDING B L.V. PLAN • • • • •
<br />E-5.3 LIGHTING CONTROL PLAN • • • • • •
<br />E-6.0 2ND FLR. BUILDING B LIGHTING PLAN • • • • • • • •
<br />E-6.1 2ND FLR. BUILDING B POWER PLAN • • • • • •
<br />E-6.2 2ND FLR. BUILDING B L.V. PLAN • • • • •
<br />E-6.3 LIGHTING CONTROL PLAN • • • • • •
<br />E-7.0 ROOF ELECTRICAL PLAN • •
<br />E-8.0 TITLE 24 ENERGY CALCULATIONS • • • • • • • •
<br />E-8.1 TITLE 24 ENERGY CALCULATIONS • • • • • • • •
<br />E-9.0 1ST FLR. BUILDING A EM. PHM PLAN • • • • • •
<br />E-9.1 1ST FLR. BUILDING B EM. PHM PLAN • • • • • •
<br />E-9.2 2ND FLR. BUILDING B EM. PHM PLAN • • • • • •
<br />PLUMBING
<br />P-001 NOTES, LEGEND • • • • • • • •
<br />P-002 SCHEDULES • • • • • • • •
<br />P-3.00 PHASE 1 SITE PLAN • • • • •
<br />P-3.01 FIRST FLOOR PLAN • • • • • • • •
<br />P-3.02 SECOND FLOOR PLAN • • • • • • • •
<br />P-3.03 ROOF PLAN • • • • • • • •
<br />P-4.01 HOT AND COLD WATER RISER DIAGRAM • • • • • • • •
<br />P-4.02 WASTE & VENT RISER DIAGRAM • • • • • • • •
<br />P-500 DETAILS • • • • • • • •
<br />9
|