Laserfiche WebLink
ROOM NAME <br />101 <br />150 SF <br />1 <br />A101 <br />1 CONSTRUCTION GRID LINE <br />PROPERTY LINE <br />CENTER LINE <br />SETBACK LINE <br />BUILDING SECTION REFERENCE <br />1 <br />A101 WALL SECTION REFERENCE <br />1 <br />A101 <br />BUILDING ELEVATION REFERENCE <br />A101 <br />1 <br />1 1 <br />1 <br />INTERIOR ELEVATION REFERENCE <br />INTERIOR ELEVATION REFERENCE <br />1 <br />A101 <br />101A <br />101 <br />1011 <br />DETAIL REFERENCE <br />AREA DETAIL REFERENCE <br />ELEVATION MARK <br />ELEVATION MARK <br />FINISH CALLOUT <br />SEE FINISH SCHEDULE <br />EQUIPMENT CALLOUT <br />SEE EQUIPMENT SCHEDULE <br />ROOM LABEL <br />DOOR LABEL <br />SEE DOOR SCHEDULE <br />WINDOW LABEL <br />SEE WINDOW SCHEDULE <br />REVISION NUMBER <br />RF-01 <br />1 <br />0'-0" <br />L01 <br />0'-0" <br />1 <br />A101 <br />1 <br />A101 <br />PROJECT <br />COPYRIGHT LOC, INC <br />ORIGINAL SHEET SIZE: 42" X 30" <br />LOC <br />ABBREVIATIONS <br />SYMBOLS LEGEND <br />INFO = INFORMATION <br />INSUL = INSULATION <br />INT = INTERIOR <br />INV = INVERTED <br />JST = JOIST <br />JT = JOINT <br />L = ANGLE <br />MAX = MAXIMUM <br />M B = MACHINE BOLT <br />MECH = MECHANICAL <br />MIN = MINIMUM <br />MTD = MOUNTED <br />MTL = METAL <br />N/A = NOT APPLICABLE <br />(N) = NEW <br />NLG = NAILING <br />NTS = NOT TO SCALE <br />O C = ON CENTER <br />OPP = OPPOSITE <br />PLT = PLATE <br />PSF = POUNDS PER SQUARE FOOT <br />PSI = POUNDS PER SQUARE INCH <br />P T = PRESSURE TREATED <br />PTD = PAINTED <br />PW / PLY = PLYWOOD <br />RCP = REFLECTED CEILING PLAN <br />REQ'D = REQUIRED <br />RET = RETAINING <br />SHT = SHEET(S) <br />SHTG = SHEATHING <br />SIM = SIMILAR <br />SPC(G) = SPACE(ING) <br />ST STL = STAINLESS STEEL <br />STAGG = STAGGERED <br />STD = STANDARD <br />STL = STEEL <br />STRUCT = STRUCTURE <br />T B S = TO BE SPECIFIED <br />TEMP = TEMPERED <br />T G = TEMPERED GLASS <br />TH = THICKNESS <br />T O = TOP OF <br />T S = TUBULAR STEEL <br />TYP = TYPICAL(LY) <br />U N O = UNLESS NOTED OTHERWISE <br />V / VERT = VERTICAL(LY) <br />V I F = VERIFY IN FIELD <br />WD = WOOD <br />WPF(G) = WATERPROOFING <br />W/ = WITH <br />∅= ROUND OR DIAMETER <br /># = NUMBER <br />AB = ANCHOR BOLT <br />A B C = ALCOHOLIC BEVERAGE <br />CONTROL <br />ABV = ABOVE <br />A F F = ABOVE FINISH FLOOR <br />ALUM = ALUMINUM <br />ARCH = ARCHITECTURAL DRAWINGS <br />B / BOT = BOTTOM <br />BD = BOARD <br />BLDG = BUILDING <br />BLK (G) = BLOCK(ING) <br />BLW = BELOW <br />BM = BEAM <br />BRG = BEARING <br />BYD = BEYOND <br />CB = CATCH BASIN <br />C.I.P. = CAST IN PLACE <br />CL = CENTERLINE <br />CLG = CEILING <br />CLR = CLEAR <br />C M U = CONCRETE MASONRY UNIT <br />COL = COLUMN <br />CONC = CONCRETE <br />CONST = CONSTRUCTION <br />CONT = CONTINUOUS (LY) <br />CTR (D) = CENTER (ED) <br />D / DIAM = DIAMETER <br />DBL = DOUBLE <br />DET = DETAIL <br />DIM = DIMENSION <br />DWG (S) = DRAWING(S) <br />(E) = EXISTING <br />EA = EACH <br />E E = EACH END <br />E F = EACH FACE <br />EL / ELEV = ELEVATION <br />ELECT = ELECTRICAL (DWGS) <br />EQ = EQUAL <br />E S = EACH SIDE <br />E W = EACH WAY <br />EXT = EXTERIOR <br />F B = FLAT BLOCKING <br />FDN = FOUNDATION <br />FIN = FINISH <br />FLR = FLOOR <br />F O W = FACE OF WALL <br />FRMG = FRAMING <br />FTG = FOOTING <br />GA = GAUGE <br />GALV = GALVANIZED <br />GEN = GENERAL <br />GR = GRADE <br />GSM = GALVANIZED SHEET METAL <br />GWB = GYPSUM WALLBOARD <br />GYP = GYPSUM <br />HC = HANDICAPPED <br />HDR = HEADER <br />HGR = HANGER <br />HT = HEIGHT <br />GENERAL NOTES <br />CLIENT <br />ARCHITECT <br />CONSULTANTS <br />COORDINATION AND VERIFICATION <br />FIRE CODE NOTES <br />PREPARED UNDER THE SUPERVISION OF: <br />ALI JEEVANJEE <br />LOC ARCHITECTS DATE <br />REVIEWED FOR CONSTRUCTABILITY: <br />SEAN THOMAS <br />PRINCIPAL CIVIL ENGINEER <br />RCE NO.: 80470 <br />DATE <br />RECOMMENDED FOR CONSTRUCTION: <br />JASON GABRIEL <br />PRINCIPAL CIVIL ENGINEER <br />RCE NO.: 62968 <br />DATE <br />3/28/2025 6:04:06 PM <br />2308 <br />G0.3 <br />GENERAL <br />NOTES <br />MARCH 28, 2025 <br />PLAN CHECK <br />SUBMITTAL 02 <br />SANTA ANA ZOO <br />1821 & 1823 E CHESTNUT AVE, SANTA <br />ANA, CA 92701 <br />KPFF <br />STRUCTURAL ENGINEER <br />LOC ARCHITECTS <br />KPFF <br />CIVIL ENGINEER <br />BORDER <br />LANDSCAPE ARCHITECT <br />ABRARI AND ASSOCIATES <br />MEP ENGINEER <br />ASSOCIATED SOILS ENGINEERING <br />GEOTECHNICAL ENGINEER <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Ramzi.hodali@kpff.com <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Sharad.Ganju@kpff.com <br />724 S. SPRING ST, SUITE 701 <br />LOS ANGELES, CA 90014 <br />213 372 5111 <br />Darren@border-la.com <br />1713 S. STANDARD AVE <br />GLENDALE, CA 91201 <br />818 956 1900 <br />Telma@abrari.com <br />2860 WALNUT AVE. <br />SIGNAL HILL, CA 90755 <br />562 897 2749 <br />Ted@associatedsoils.com <br />3203 E. 4TH ST <br />LOS ANGELES, CA 90063 <br />213 537 0480 <br />Office@loc-arch.com <br />1801 E. CHESTNUT AVE. <br />SANTA ANA, CA 92701 <br />714 647 6575 <br />Efisher@santa-ana.org <br />SANTA ANA ZOO <br />EDUCATION HUB <br />MARCH 28, 2025 <br />25 <br />1. CONTRACTOR TO COMPLY WITH CODES, LAWS, ORDINANCES, RULES, AND <br />REGULATIONS OF PUBLIC AUTHORITIES GOVERNING THE WORK. <br /> <br />2. CONTRACTOR TO OBTAIN AND PAY FOR PERMITS AND INSPECTIONS REQUIRED BY <br />PUBLIC AUTHORITIES GOVERNING THE WORK. <br /> <br />3. CONTRACTOR TO REVIEW DOCUMENTS, VERIFY DIMENSIONS AND FIELD CONDITIONS <br />AND CONFIRM THAT WORK IS BUILDABLE AS SHOWN. REPORT ANY CONFLICTS OR <br />OMISSIONS TO THE ARCHITECT FOR CLARIFICATION PRIOR TO PERFORMING ANY WORK <br />IN QUESTION. <br /> <br />4. FOR SUBSTITUTIONS REFER TO SPECIFICATIONS. <br /> <br />5. CONTRACTOR TO COORDINATE WORK WITH THE SANTA ANA ZOO, INCLUDING <br />SCHEDULING TIME AND LOCATIONS FOR DELIVERIES, BUILDING ACCESS, USE OF <br />BUILDING SERVICES AND FACILITIES, AND USE OF ELEVATORS. COORDINATE WORK <br />WITH OTHER CONTRACTS. MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND <br />OCCUPANTS, INCLUDING TRASH REMOVAL ACCESS. <br /> <br />6. CONTRACTOR TO COORDINATE TELECOMMUNICATIONS, DATA AND SECURITY SYSTEM <br />INSTALLATIONS. <br /> <br />7. CONTRACTOR TO MAINTAIN EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES, AND <br />ALARMS IN CONFORMANCE WITH CODES AND ORDINANCES. <br /> <br />8. CONTRACTOR TO PROTECT AREA OF WORK AND ADJACENT AREAS FROM DAMAGE. <br />G.C. TO COORDINATE TRASH ACCESS. <br /> <br />9. CONTRACTOR TO MAINTAIN WORK AREAS SECURE AND LOCKABLE DURING <br />CONSTRUCTION. <br /> <br />10. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES <br />SHOWN ON DRAWINGS. GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS, <br />GRADES AND CONDITIONS AT SITE PRIOR TO COMMENCING THE WORK, AND REPORT <br />ANY DISCREPANCIES TO THE CONSTRUCTION MANAGER AND ARCHITECT IN WRITING. <br /> <br />11. PARTITIONS ARE DIMENSIONED FROM FINISH FACE TO FINISH FACE, UNLESS <br />OTHERWISE NOTED. MAINTAIN DIMENSIONS MARKED "CLEAR". ALLOW FOR THICKNESS <br />OF FINISHES. <br /> <br />12. FLOOR LEVELS INDICATED ON DRAWINGS ARE FOR REFERENCE ONLY. PRIOR TO <br />CONSTRUCTION GENERAL CONTRACTOR SHALL HIRE A THIRD PARTY LICENSED <br />SURVEYOR TO FIELD VERIFY EXISTING GRADES AND FLOOR ELEVATIONS INDICATED ON <br />DRAWING. NOTIFY THE ARCHITECT AND THE SANTA ANA ZOO REPRESENTATIVE <br />IMMEDIATELY OF ANY DISCREPANCIES. <br /> <br />13. WHERE EXISTING ACCESS PANELS CONFLICT WITH CONSTRUCTION. CONTRACTOR TO <br />RELOCATE PANELS TO ALIGN WITH AND FIT WITHIN NEW CONSTRUCTION. <br /> <br />14. CONTRACTOR TO UNDERCUT DOORS TO CLEAR TOP OF FLOOR FINISHES BY 1/4 INCH, <br />UNLESS OTHERWISE NOTED. <br /> <br />15. CEILING HEIGHT DIMENSIONS ARE TO FINISHED SURFACES. <br /> <br />16. CONTRACTOR SHALL PROVIDE CONSTRUCTION BARRICADES OR FENCING AS <br />REQUIRED AND AS APPROVED BY THE SANTA ANA ZOO FOR PUBLIC SAFETY PRIOR TO <br />COMMENCING THE WORK. <br /> <br />17. CONTRACTOR TO COORDINATE AND PROVIDE BACKING FOR MILLWORK AND ITEMS <br />ATTACHED OR MOUNTED TO WALLS OR CEILINGS. <br /> <br />18. FIRE PROTECTION EQUIPMENT AND SERVICE ACCESS MUST BE PROVIDED DURING THE <br />CONSTRUCTION PERIOD AS REQUIRED BY THE SANTA ANA ZOO. <br /> <br />19. CONTRACTOR SHALL PROVIDE TEMPORARY EXIT SIGNS TO ASSURE A MEANS OF EGRESS <br />DURING CONSTRUCTION. <br /> <br />20. WHERE A TYPICAL CONDITION IS DETAILED, IT SHALL BE UNDERSTOOD THAT ALL LIKE <br />OR SIMILAR CONDITIONS ARE THE SAME UNLESS SPECIFICALLY NOTED OR DETAILED <br />OTHERWISE. <br />21. GENERAL CONTRACTOR SHALL COORDINATE SITE PLUMBING,DRAINAGE, ELECTRICAL, <br />TELEPHONE WORK AND EXISTING UTILITIES TO PROVIDE A COMPLETE OPERATING <br />SYSTEM. <br />22. EXCEPT WHERE SHOWN IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING, <br />MECHANICAL EQUIPMENT, DUCTS, PIPING, AND FITTING ARE ONLY APPROXIMATE. THE <br />EXACT LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR, SUBJECT TO <br />APPROVAL BY THE SANTA ANA ZOO REPRESENTATIVE. <br /> <br />23. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BLOCKING, <br />BACK-UP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL <br />CASEWORK, TOILET ROOM ACCESSORIES, FIXTURES AND PARTITIONS AND ALL WALL <br />MOUNTED OR SUSPENDED MECHANICAL, ELECTRICAL OR MISCELLANEOUS EQUIPMENT <br />AND FURNISHINGS. <br /> <br />24. MECHANICAL SUPPLY AND RETURN AIR SHAFTS SHALL BE AIRTIGHT AND SEALED. <br /> <br />25. ALL WORK PERFORMED SHALL COMPLY WITH THE CONTRACT DOCUMENTS, DRAWINGS <br />AND SPECIFICATIONS, INCLUDING THESE GENERAL NOTES. THE CONTRACTOR SHALL <br />COORDINATE THE INTENT OF THE GENERAL NOTES WITH ALL TRADES. <br /> <br />26. SPECIFICATIONS, BOUND SEPARATELY, ARE PART OF THE CONTRACT DOCUMENTS. <br /> <br />27. THE ORGANIZATION OF THE DRAWINGS AND SPECIFICATIONS SHALL NOT CONTROL <br />THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN <br />ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE. <br /> <br />28. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE DRAWINGS AND <br />SPECIFICATIONS. IF CONFLICT IS FOUND BETWEEN DRAWINGS, GENERAL NOTES AND <br />SPECIFICATIONS, CONSULT THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING <br />WITH THE WORK. <br /> <br />29. NO DEVIATION FROM CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE MADE <br />WITHOUT WRITTEN APPROVAL OF THE ARCHITECT. <br /> <br />30. DOORS OPENING INTO REQUIRED 1-HOUR, FIRE-RESISTIVE CORRIDORS SHALL BE <br />PROTECTED WITH A SMOKE OR DRAFT STOP ASSEMBLY HAVING A 20-MINUTE RATING <br />AND SHALL BE SELF-CLOSING. <br /> <br />31. 20-MINUTE DOOR JAMBS TO BE TIGHT-FITTING, SMOKE AND DRAFT CONTROLLED. <br /> <br />32. EXIT DOORS SHALL SWING IN THE DIRECTION OF TRAVEL WHEN SERVING 50 OR MORE <br />PERSONS AND IN ANY HAZARDOUS AREA. <br /> <br />33. PROVIDE FIRE DAMPERS OR DOORS WHERE AIR DUCTS PENETRATE FIRE-RATED WALLS OR <br />CEILINGS. <br /> <br />34. WOOD BLOCKING SHALL BE FIRE TREATED IN ACCORDANCE WITH APPLICABLE CODE <br />REQUIREMENTS. <br /> <br />35. IF THE SPACE ABOVE THE SUSPENDED CEILING IS USED AS A RETURN AIR PLENUM, THEN <br />ALL EQUIPMENT AND WIRING(COMMUNICATION, POWER ETC) SHALL BE LISTED FOR <br />INSTALLATION IN A PLENUM. <br /> <br />36. ALL FLEXIBLE AIRDUCTS, IF USED, SHALL MEET THE REQUIREMENTS OF NFPA 90A, 2-3-2 <br />IN CONSTRUCTION AND INSTALLATION. <br /> <br />37. PROVIDE ALL ACCESS PANELS REQUIRED FOR ALL JUNCTION BOXES, VALVES, <br />CLEANOUTS, PLUGS, FILTERS, EQUIPMENT AND ALL OTHER ITEMS REQUIRING SERVICE <br />AND MAINTENANCE. <br />38. PENETRATIONS IN WALLS REQUIRING PROTECTED OPENINGS MUST BE FIRESTOPPED <br />WITH AN APPROVED MATERIAL IN ACCORDANCE WITH CBC SECTION 714. SPACE <br />BETWEEN PENETRATING MATERIALS (DESCRIBED BELOW) MUST BE DESIGNED TO <br />PREVENT THE MOVEMENT OF HOT FLAME OR GASES <br />A. STEEL, COPPER OR FERROUS PIPES OR CONDUITS MAY PENETRATE CONCRETE OR <br />MASONRY WALLS WHERE THE PENETRATING ITEM IS A MAXIMUM 6-INCH DIAMETER AND <br />THE AREA OF THE OPENING THROUGH THE WALL DOES NOT EXCEED 144 SQUARE <br />INCHES. <br />B. MEMBRANE PENETRATIONS OF MAXIMUM 2-HR. FIRE-RESISTANCE RATED WALL AND <br />PARTITIONS BY STEEL ELECTRICAL OUTLET BOXES NOT EXCEEDING 16 SQUARE INCHES <br />ARE PERMITTED PROVIDED OPENINGS DO NOT EXCEED 100 SQUARE INCHES FOR ANY <br />100 SQUARE FEET OF WALL AREA. OUTLET BOXES ON OPPOSITE SIDES OF WALLS OR <br />PARTITIONS MUST BE SEPARATED BY A HORIZONTAL DISTANCE OF 24 INCHES. <br />C. WHERE WALLS ARE PENETRATED BY OTHER MATERIALS OR WHERE LARGER OPENINGS <br />ARE REQUIRED THAN PERMITTED IN (B) ABOVE, THEY MUST BE QUALIFIED BY TESTS <br />CONDUCTED IN ACCORDANCE WITH SECTION. <br />39. SMOKE AND FIRE DAMPERS MUST BE INSTALLED IN THE FOLLOWING LOCATIONS PER <br />CBC SECTION 717 <br />A. DUCT PENETRATIONS OF FIRE WALLS IN ACCORDANCE TO SECTION <br />B. DUCT PENETRATIONS OF FIRE BARRIERS, EXCEPT EXIT ENCLOSURES AND EXIT <br />PASSAGEWAYS WHERE THEY ARE NOT ALLOWED TO PENETRATE. <br />C. DUCTS PENETRATING SHAFTS. <br />D. DUCTS PENETRATING FIRE PARTITIONS AND FIRE-RATED CORRIDOR WALLS. SEE <br />EXCEPTION FOR STEEL DUCTS WITH NO OPENINGS INTO CORRIDOR <br />E. DUCTS PENETRATING SMOKE BAFFLERS <br />F. DUCTS PENETRATING HORIZONTAL ASSEMBLIES <br />40. INTERIOR FINISH MATERIALS APPLIED TO WALL AND CEILINGS SHALL BE TESTED AS <br />SPECIFIED IN SECTION 803. SPECIFY THE CLASSIFICATIONS PER TABLE 803.1.2. <br />41. ALL EXIT DOORS SHALL COMPLY WITH CBC SECTION 1010 <br />A. CLEAR WIDTH OF EACH DOOR OPENING SHALL BE MIN. 32" OR PER CBC SECTION <br />1005, WHICHEVER IS GREATER <br />B. MIN. DOOR HEIGHT OF 6'-8" <br />C. SHALL BE CAPABLE OF OPENING 90 DEGREES. <br />D. THE MAXIMUM WIDTH OF A SWINGING DOOR LEAF SHALL BE 48" NOMINAL. <br />E. EXIT DOOR SHALL BE SIDE-HINGED SWINGING TYPE. <br />42. BUILDING SHALL COMPLY WITH BUILDING SAFETY REGULATONS, SANTA ANA <br />MUNICIPAL CODE CHAPTER 8 DIVISION 3. <br />1. STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING DRAWINGS AND SPECIFICATIONS <br />ARE SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS, BUT TOGETHER WITH THE <br />ARCHITECTURAL DRAWINGS FORM THE PROJECT DOCUMENTS. IT IS THE <br />RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH AND COORDINATE WITH THE <br />ARCHITECTURAL DRAWINGS. BEFORE THE INSTALLATION OF STRUCTURAL, <br />MECHANICAL, ELECTRICAL AND PLUMBING WORK. SHOULD THERE BE A DISCREPANCY <br />DISCOVERED BETWEEN THE ARCHITECTURAL DRAWINGS AND THE CONSULTANT <br />ENGINEER'S DRAWINGS, IT SHALL BE BROUGHT TO THE ARCHITECT AND THE SANTA <br />ANA ZOO REPRESENTATIVE'S ATTENTION FOR CLARIFICATION PRIOR TO INSTALLATION. <br />CONTRACTOR SHALL NOT, EITHER KNOWINGLY OR IF HE SHOULD HAVE KNOWN <br />BASED ON INFORMATION CONTAINED IN THE CONTRACT DOCUMENTS, INSTALL <br />WORK IN CONFLICT WITH THE ARCHITECTURAL DRAWINGS. ANY SUCH WORK SHALL <br />BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO ADDITIONAL COST <br />TO THE SANTA ANA ZOO. <br />2. DO NOT SCALE DRAWINGS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATION <br />AND ALL EXISTING CONDITIONS AT THE SITE BEFORE COMMENCING WORK AND <br />REPORT ANY DISCREPANCIES TO THE ARCHITECT AND THE SANTA ANA ZOO <br />REPRESENTATIVE PRIOR TO THE START OF THE WORK. <br />3. IN THE EVENT OF CONFLICT BETWEEN THE DRAWING AND SPECIFICATIONS, OR WITHIN <br />THEMSELVES, THE ARCHITECT WILL IN CONSULTATION WITH THE SANTA ANA ZOO <br />DETERMINE WHICH CONFLICTING REQUIREMENT GOVERNS. <br />4. SPECIFIC NOTES OR KEYNOTES ON DETAILS APPLY TO SIMILAR CONDITIONS ON OTHER <br />DETAILS ON ALL DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. <br />5. ALL MANUFACTURED MATERIALS USED SHALL BEAR THE APPROPRIATE U.L. LABELS. <br />CONTRACTOR ARE TO VERIFY DIMENSIONS, ELEVATIONS AND EXISTING CONDITIONS <br />AT THE SITE BEFORE COMMENCING WORK AND REPORT DISCREPANCIES TO THE <br />ARCHITECT AND THE SANTA ANA ZOO REPRESENTATIVE FOR RESOLUTION PRIOR TO <br />THE START OF THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING <br />EXISTING JOB SITE CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />CHECKING ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE WHICH SHOULD <br />CHANGE THE AESTHETIC INTENT OR HINDER PROPER WORK COMPLETIONS BEFORE <br />FABRICATING ANY MATERIAL AND SHALL REPORT ANY DISCREPANCIES TO THE SANTA <br />ANA ZOO REPRESENTATIVE. <br />6. VERIFY SIZES AND LOCATIONS OF ALL MECHANICAL EQUIPMENT SIZES, EQUIPMENT <br />PADS AND BASES REQUIREMENTS, AS WELL AS POWER AND WATER OR DRAIN <br />INSTALLATIONS WITH EQUIPMENT MANUFACTURERS BEFORE PROCEEDING WITH THE <br />WORK. CHANGES TO ACCOMMODATE FIELD CONDITIONS OR SUBSTITUTIONS SHALL <br />BE MADE WITHOUT ADDITIONAL COST TO THE SANTA ANA ZOO REPRESENTATIVE. <br />7. VERIFY ALL OPENINGS IN THE FIELD PRIOR TO THE FABRICATION OF DOORS AND <br />FRAMES. <br />8. PROVIDE AND COORDINATE THE EXACT DIMENSIONS, SIZES, AND POSITIONS OF <br />OPENINGS IN SLABS AND WALLS NECESSARY FOR THE INSTALLATION OF THE WORK. <br />9. VALVES, CONTROLS AND TERMINATION SHALL BE POSITIONED FOR SAFE, DIRECT AND <br />EASY ACCESS. PIPING AND DUCTWORK SHALL BE INSTALLED FOR CONVENIENT FUTURE <br />ADDITIONS AND MODIFICATIONS. <br />10. VERIFY AND COORDINATE SIZES, LOCATIONS AND CHARACTERISTICS OF ALL WORK <br />AND EQUIPMENT TO BE FURNISHED BY OTHERS, WITH THE MANUFACTURER OR <br />SUPPLIER BEFORE ANY CONSTRUCTION. <br />11. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING <br />ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE AND <br />MISALIGNMENT ACCORDING TO APPLICABLE CODES, STANDARDS AND GOOD <br />CONSTRUCTION PRACTICES. <br />12. THE CONTRACTOR IS TO BE RESPONSIBLE FOR CLEANUP OF ALL TRADES AND REMOVAL <br />OF ALL DEBRIS. THE COMPLETED WORK SHALL BE LEFT CLEAN AND READY FOR <br />OCCUPANCY. <br />13. CONTRACTOR SHALL CORRECT ANY DAMAGE CREATED BY THE CONTRACTOR OR ANY <br />OR THE CONTRACTOR'S SUBCONTRACTORS. <br />14. FURNISH AND INSTALL EXPANSION JOINTS, CONTROL JOINTS, ETC. WHETHER OR NOT <br />DOCUMENTED. COORDINATE WITH FINAL LOCATION OF THESE ITEMS WITH THE SANTA <br />ANA ZOO REPRESENTATIVE PRIOR TO COMMENCING WORK. <br />FIRE PROTECTION <br />1. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2- <br />A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF THE BUILDING; ALSO <br />DURING CONSTRUCTION. REFER TO PLANS FOR LOCATIONS <br />2. PROVIDE ADDITIONAL FIRE EXTINGUISHERS AS REQUIRED BY THE ORANGE COUNTRY <br />FIRE AUTHORITY FIRE MARSHALL <br />3. THIS BUILDING MUST BE EQUIPPED WITH AN AUTOMATIC FIRE EXTINGUISHING SYSTEM, <br />COMPLYING WITH (NFPA-13); THE SPRINKLER SYSTEM SHALL BE APPROVED BY SANTA <br />ANA ZOO BUILDING OFFICIAL PRIOR TO INSTALLATION. <br />MEANS OF EGRESS <br />1. TWO EXITS ARE REQUIRED FROM EACH SPACE OR STORY. (T 1006.2.1) <br />A. OCCUPANT LOAD > 49, (A, *B, E, F, M, U) <br />B. OCCUPANT LOAD > 10, (R) <br />C. OCCUPANT LOAD > 29, (S) <br />D. COMMON PATH OF EGRESS > 75 FT. <br />E. COMMON PATH OF EGRESS > 100 FT. (B, F, S) SPRINKLERED BUILDING <br />* > 29 (B) <br />2. ALL EXIT DOORS SHALL COMPLY WITH SECTION 1010.1 <br />A. CLEAR WIDTH OF EACH DOOR OPENING SHALL BE MIN. 32 ”OR PER 1005.3.2, <br />WHICHEVER IS GREATER <br />B. MIN. DOOR HEIGHT IS 6’-8” <br />C. SHALL BE CAPABLE OF OPENING 90 DEGREES <br />D. THE MAXIMUM WIDTH OF A SWINGING DOOR LEAF SHALL BE 48 ”NOMINAL <br />E. EXIT DOOR SHALL BE SIDE-HINGED SWINGING TYPE <br />3. PANIC HARDWARE SHALL BE PROVIDED ON EXIT DOORS HANDLING AN OCCUPANT <br />CAPACITY OF 50 OR MORE PERSONS, FROM ANY GROUP A, E OR I OCCUPANCY; AND <br />FOR H1, 2, 3, 6, 7,8 OCCUPANCY AND SOUND STAGES. ONLY PANIC HARDWARE <br />APPROVED AND LISTED BY THE CAMPUS FIRE MARSHALL SHALL BE INSTALLED. <br />4. PROVIDE A 1 HR. FIRE RATED CORRIDOR IN ACCORDANCE WITH CBC SECTION 1020. <br />A. OCCUPANT LOAD > 30 <br />B. OCCUPANT LOAD > 10 <br />C. R OCCUPANCIES <br />D. E OCCUPANCIES <br />E. I OCCUPANCIES <br />F. H OCCUPANCIES <br />5. ALL ELECTRICAL ROOM DOORS SHALL BE 60 MINUTES. MAGNETIC HOLD OPENS SHALL <br />BE USED WHERE ELECTRICAL ROOM DOORS OCCUR WITHIN AN ELEVATOR LOBBY. <br />6. PROVIDE A MINIMUM CORRIDOR WIDTH OF 44 INCHES OR PER 1005.3.2, WHICHEVER IS <br />GREATER (T 1020.2). <br />7. FLOORS OR LANDINGS ON EACH SIDE OF DOORS TO HAVE THE SAME ELEVATION. <br />LANDINGS SHALL BE LEVEL EXCEPT FOR EXTERIOR LANDINGS (MAX. 2% SLOPE) (CBC <br />SECTION 1010). <br />8. SPACES BETWEEN TWO DOORS IN SERIES SHALL BE A MIN. 48 ”PLUS THE WIDTH OF THE <br />DOOR SWINGING INTO THE SPACE. (CBC SECTION 1010) <br />9. WHERE TWO OR MORE EXITS ARE REQUIRED, AT LEAST TWO EXITS MUST BE SEPARATED <br />BY 1/2 THE MAX. DIAGONAL LENGTH OF THE AREA SERVED OR 1/3 THE MAX. <br />DIAGONAL IF SPRINKLERED (CBC SECTION 1010) <br />10. LANDING WIDTH AT DOORS MUST HAVE A MIN. CLEAR DIMENSION OF DOORS SERVED. <br />MIN. LENGTH OF SUCH LANDINGS IS 44" (36") (CBC SECTION 1010) <br />11. THE MEANS OF EGRESS SYSTEM MUST HAVE A CLEAR CEILING HEIGHT OF 7'-6. (CBC <br />SECTION 1003) <br />12. FIRE-RATED ASSEMBLIES SHALL BE PER CBC SECTION 721, GENERIC ASSEMBLIES OF <br />GYPSUM HANDBOOK OR ICC APPROVAL <br />NO.DESCRIPTION DATE <br />3 PC01 CORRECTIONS 03/28/25 <br />3