My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CITY PROJECT - 1821 & 1823 E Chestnut Ave - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Chestnut Ave
>
1821 E Chestnut Ave
>
CITY PROJECT - 1821 & 1823 E Chestnut Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 11:14:23 AM
Creation date
2/24/2026 11:13:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20184680
20184681
30148144
30148145
40139793
40139794
101121878
101121879
Full Address
1821 E Chestnut Ave
1823 E Chestnut Ave
Street Number
1823
Street Direction
E
Street Name
Chestnut
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 <br />2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 <br />Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 23 <br />The aggregate base should conform to the Crushed Aggregate Base (CAB) or Crushed Miscellaneous Base <br />(CMB) requirements per Sections 200-2.2 and 200-2.4 of the Greenbook, respectively. The base course <br />should be compacted to a minimum relative compaction of 95% at a minimum of one (1) percentage point <br />above the optimum moisture content. Field testing should be used to verify compaction, aggregate <br />gradation, and compacted thickness. <br /> <br />The AC pavement should be compacted to 95% of the unit weight as tested in accordance with the Hveem <br />procedure per the latest CTM 304 procedures. The AC material shall conform to Type III, Class C2 or C3, of <br />the Greenbook. All subgrade and aggregate base materials should be proof-rolled by heavy rubber tire <br />equipment to verify that the subgrade and base grade are in a firm and non-yielding condition. <br /> <br />All AC laydown operations should be performed under the observation of and testing by the Geotechnical <br />Consultant’s field representative. An adequate number of field density tests should be taken to ensure <br />compliance with this report and local ordinances. New AC should be examined by a representative of the <br />Geotechnical Consultant, and tested as necessary to ensure that they meet the recommended quality <br />specifications prior to being hauled to the site. Final acceptance of any AB material or AC will be based <br />upon review and testing of the material actually delivered to the site. AC delivered to the site should be <br />tested as necessary for quality assurance and relative compaction determination during laydown. <br /> <br />If the paved areas are to be used during construction, or if the type and frequency of traffic is greater than <br />assumed in the design, the pavement section should be re-evaluated for the anticipated traffic. <br /> <br />5.6 Portland Cement Concrete (PCC) Pavements <br />The PCC pavement sections tabulated below are based on load safety factors of 1.0 and 1.1, and a modulus <br />of subgrade reaction ("k" Value) of 100 pounds per cubic inch for site soils compacted as subgrade material, <br />and the design procedures presented in the Portland Cement Association bulletin "Thickness Design for <br />Concrete Highway and Street Pavements" (EB109.01P), 1984. A design service life of 20 years was assumed <br />for the design of the Portland cement concrete pavement section. <br />Concrete Flexural Strength (psi) (1) Pavement Thickness (in) (2), (4) Pavement Thickness (in) (3), (4) <br />600 6.0 7.0 <br />650 5.5 6.5 <br />(1) Represents 90-day flexural strength. Based on Figure 10 of Reference 5, concrete with 28-day unconfined <br />compressive strength values of 4000 to 4500 psi typically correlates to 90-day flexural strength values of 600 and 650 <br />psi, respectively. <br />(2) Load Safety Factor = 1.0 (Auto Parking Stalls) <br />(3) Load Safety Factor = 1.1 (Fire Lanes/Truck Traffic Areas/Entry and Exits) <br />(4) Assumes no PCC shoulder or curb. <br />
The URL can be used to link to this page
Your browser does not support the video tag.