Laserfiche WebLink
REF. <br />1006 SF <br />MULTI-PURPOSE <br />ROOM A <br />02 <br />212 SF <br />ENTRY / CHECK <br />IN OFFICE <br />01 <br />348 SF <br />TRAINING ROOM <br />B <br />03 <br />95 SF <br />HALLWAY <br />04 <br />375 SF <br />TRAINING ROOM <br />C <br />05 <br />HALLWAY <br />06 <br />162 SF <br />WOMENS <br />07 139 SF <br />MENS <br />09 <br />273 SF <br />OFFICE AND <br />BREAKROOM <br />10 <br />56 SF <br />RESTROOM <br />11 <br />15 SF <br />JANITOR <br />12 <br />03-04 <br />FINISH NOTES <br />1. ALL INTERIOR FINISHES SELECTED SHALL CONFORM TO THE REQUIREMENTS OF THE 2019 <br />CALIFORNIA BUILDING CODE, CHAPTER 8 AND THE 2019 CALIFORNIA GREEN BUILDING <br />STANDARDS CODE, CHAPTER 5. INTERIOR WALL AND CEILING FINISHES SHALL BE <br />CLASSIFIED AS CLASS C. <br />2. TOILET AND JANITORIAL ROOM FLOOR FINISH MATERIAL SHALL HAVE A SMOOTH, HARD, <br />NON-ABSORBENT SURFACE. INTERSECTION OF FLOORS WITH WALLS SHALL HAVE A <br />SMOOTH, HARD, NON-ABSORBENT VERTICAL BASE THAT EXTENDS UPWARD ONTO WALLS <br />NOT LESS THAN 4" CBC SECTION 1210.2.1 <br />3. WALLS AND PARTITIONS WITHIN 2'-0" OF SERVICE SINKS, URINALS AND WATER CLOSETS <br />SHALL HAVE A SMOOTH, HARD, NON-ABSORBENT SURFACE WHICH EXTENDS UPWARD ONTO <br />WALLS NOT LESS THAN 4'-0". CBC SECTION 1210.2.2 <br />4. SUBSTITUTIONS, REVISIONS OR CHANGES MUST HAVE APPROVAL OF ARCHITECT PRIOR TO <br />PURCHASE AND INSTALLATION. <br />5. ALL PAINTED GYP. BD. SURFACES TO HAVE LIGHT STIPPLE FINISH, U.O.N. ALL GYP. BD. <br />SURFACES TO RECEIVE WALL COVERING SHALL HAVE MINIMUM LEVEL 5 SMOOTH FINISH. ALL <br />WALL COVERING TO BE FROM THE SAME PRODUCTION RUN OR DYE LOT. <br />6. ALL PAINT FINISHES TO HAVE UNDERCOAT AND ONE OR MORE COLOR COATS AS REQUIRED <br />BY SPECIFICATION FOR COMPLETE AND CONSISTENT COVERAGE. PROVIDE 8-1/2" X 11" PAINT <br />BRUSHOUT FOR DESIGNER'S APPROVAL. <br />7. ALL WALLS AND LOW PARTITIONS TO BE FINISH PT-1 U.O.N. <br />8. VERIFY WITH ARCHITECT AT BEGINNING OF PROJECT WHICH ELEMENTS ARE TO BE PAINTED. <br />9. EXISTING CONCRETE SLAB SHALL BE PREPARED AND SEALED FROM MOISTURE PER <br />MANUFACTURER'S WRITTEN INSTRUCTIONS. <br />10. FLOAT ALL AREA WHERE FLOOR IS NOT LEVEL OR TRUE PRIOR TO FLOOR INSTALLATION. <br />11. CARPET CONTRACTOR MUST VERIFY EXISTING FLOOR CONDITIONS PRIOR TO INSTALLATION. <br />12. ALL CARPET INSTALLED SHALL COMPLY WITH CBC SECTION 11B-302.2. ALL CARPET TO BE <br />FROM THE SAME DYE LOT IN OPEN OR HIGH VISIBILITY AREAS. <br />13. PROVIDE APPROPRIATE FLOOR TRANSITIONS BETWEEN DIFFERING FLOOR TREATMENTS. <br />PROVIDE SCHLUTER TRANSITION STRIPS WHERE TILE BUTTS A FLOOR FINISH IN A MANNER <br />OTHER THAN FLUSH. USE VINYL TRANSITION STRIPS WHERE CARPET MEETS VCT, SHEET <br />GOODS OR CONCRETE. <br />14. PROVIDE & INSTALL ALL FLOORING IN ACCORDANCE W/ MANUFACTURER'S WRITTEN <br />INSTRUCTIONS. <br />KEYNOTES <br />LEGEND <br />FINISH DESIGNATION. REFER TO FINISH LEGEND FOR <br />FINISH SPECIFICATIONS <br />DIRECTION OF PATTERN / LINES OF FLOORING <br />XXXX <br />ACOUSTICAL CEILING TILE <br />ACT1 ARMSTRONG LYRA PB, 24" X 24" OFFICE AND KITCHEN CIELING <br />GRID WHITE <br />CERAMIC TILE (INCLUDING PORCELAIN) <br />CT1 DAL-TILE COLOR WHEEL CLASSIC RESTROOM WALL TILE <br />6X6, IN RUNNING BOND PATTERN <br />FIELD COLOR: MATTE ARCTIC WHITE 0790 <br />3X6 COVE BASE <br />CT2 2" x 2" MOSAIC PATTERN RESTROOM FLOOR TILE <br />DAL-TILE KEYSTONES <br />FIELD COLOR: CASTLEROCK (GROUP 3) D618 <br />GLAZING <br />GL-1 SINGLE PANE, LOW E COATED, TYPICAL WINDOW AND DOOR GLAZING <br />REFER TO SPECS. <br />GL-2 SINGLE PANE, LOW E COATED, FROSTED RESTROOM WINDOWS <br />REFER TO SPECS <br />PARTITION <br />BOBRICK SIERRA SERIES (SCRC), SOLID COLOR RESTROOM TOILET PARTITIONS <br />REINFORCED COMPOSITE VANDAL-RESISTANT <br />OVERHEAD BRACED <br />COLOR: FOREST GREEN SC04 <br />STANDARD HARDWARE, INCLUDE HEAVY DUTY FULL HEIGHT <br />STEEL BRACKETS, OCCUPANCY INDICATOR LATCH AND <br />GAP FREE DOORS AND STILES <br />PAINT <br />PT1 COLOR TBD EXTERIOR PLASTER WALLS <br />PT2 COLOR TBD EXTERIOR PLASTER ACCENT 1 (UPPER PLASTER) <br />PT3 COLOR TBD EXTERIOR PLASTER ACCENT 2 (BASE) <br />PT4 COLOR TBD (GREEN)EXTERIOR WOOD, TYPICAL (TRIM AND FRAMES) <br />PT5 COLOR TBD (LIGHT GREEN)EXTERIOR WOOD, ACCENT (TRIM AND FRAMES) <br />PAINT (CONTINUED): <br />PT6 COLOR TBD (RED)EXTERIOR WOOD DOORS, TYPICAL <br />PT7 COLOR TBD (ROSE)EXTERIOR WOOD, ACCENT (TRIM AND FRAMES) <br />PT8 COLOR (LIGHT GREEN)EXTERIOR METAL <br />PT10 COLOR TBD, EGGSHELL INTERIOR CEILINGS <br />PT11 COLOR TBD, EGGSHELL INTERIOR WALLS, TYPICAL <br />PT12 COLOR TBD, EGGSHELL INTERIOR WALLS, ACCENT <br />PT13 COLOR TBD, SEMI GLOSS INTERIOR WOOD (WINDOWS, DOORS, TRIM) <br />SOLID SURFACE MATERIAL <br />SSM1 CORIAN RESTROOM COUNTERTOPS <br />COLOR: DOMINO TERRAZZO (GROUP 12) <br />SSM2 CORIAN BREAK ROOM COUNTERTOPS <br />COLOR: CAMEO WHITE <br />WALL BASE <br />WB1 RUBBER COVE BASE, 4" TALL JANITORS <br />COLOR TBD <br />WB2 INTEGRAL CONCRETE COVE BASE, 6" TALL HALLWAY #06 <br />COLOR TO MATCH (E) CONCRETE FLOOR <br />WB3 CONCRETE TILE BASE, 7 1/4" TALL x 2 3/4" MULTI-PURPOSE ROOM A <br />PACIFIC STONE, WB 135 <br />SAND FINISH, COLOR TO MATCH (E) FLOOR <br />WB4 SOLID WOOD BASE, 6" TALL ENTRY, HALLWAY #04, OFFICE, TRAINING ROOM B & C <br />PAINT GRADE <br />WOOD <br />WD1 SOLID WOOD TRIM, PAINT GRADE ALL INTERIOR TRIM <br />WD2 CASEWORK, PAINT GRADE ALL CASEWORK <br />Scale <br />Project number <br />Date <br />Drawn by <br />Jen Dunbar, AIA <br />phone: 310.435.3928 <br />12314 La Maida Street <br />Valley Village, CA 91607 <br />jen@dunbararchitecture.com <br />DUNBAR <br />ARCHITECTURE <br />JD/AP <br />1/4" = 1'-0" <br />4/ <br />7 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />9 <br />: <br />2 <br />2 <br />: <br />3 <br />8 <br /> <br />P <br />M <br />A6.10 <br />FINISH PLAN & <br />SCHEDULE <br />23004 <br />CYPRESS CENTER <br />RESTORATION <br />CITY OF SANTA ANA <br />1/17/2025 <br />625 S. CYPRESS AVE. <br />SANTA ANA, CA 92701 <br />1/4" = 1'-0"A6.10 <br />1 FLOOR PLAN - FINISH PLAN <br />COLORS, MATERIALS AND FINISHES <br />FINISH SCHEDULE <br />ROOM FLOOR BASE A - NORTH WALL B - EAST WALL C - SOUTH WALL D - WEST WALL CEILING <br />REMARKSNO. NAME MATERIAL FINISH MATERIAL MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH <br />01 ENTRY / CHECK IN OFFICE (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10 <br />02 MULTI-PURPOSE ROOM A (E) CONC WB3 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10 <br />03 TRAINING ROOM B (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10 <br />04 HALLWAY (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10 <br />05 TRAINING ROOM C (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10 <br />06 HALLWAY CONC WB2 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10 <br />07 WOMENS CT CT2 CT1 CT CT1 CT CT1 CT CT1 CT CT1 GYP BD PT10 <br />08 JAN. (E) CONC WB1 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 - - <br />09 MENS CT CT2 CT1 CT CT1 CT CT1 CT CT1 CT CT1 GYP BD PT10 <br />10 OFFICE AND BREAKROOM (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 ACT ACT1 <br />11 RESTROOM CT CT2 CT1 CT CT1 CT CT1 CT CT1 CT CT1 GYP BD PT10 <br />12 JANITOR (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10 <br />03-04 CLEAN AND POLISH (E) CONCRETE FLOOR. EXISTING SCORING TO REMAIN. <br />No. Description Date <br />90% CD 5/14/2024 <br />PERMIT SET 5/17/2024 <br />OCFA SUBMITTAL 9/26/2024 <br />BACKCHECK SET 1/17/2024 <br />BACKCHECK SET_V2 4/8/2025