Laserfiche WebLink
E0.11 <br />Scale <br />Jen Dunbar, AIA <br />phone: 310.435.3928 <br />12314 La Maida Street <br />Valley Village, CA 91607 <br />jen@dunbararchitecture.com <br />DUNBAR <br />ARCHITECTURE <br />No.Description Date <br />AS NOTED <br />Engineering Corp <br />Mechanical Electrical Plumbing <br />1920 MAIN STREET, SUITE 820 <br />IRVINE, CA 92614 <br />TEL: 949.516.6480 <br />EFORPDERETS <br />I <br />G <br />ER RE <br />EN <br />IGNE <br />LANOISS <br />CA L I FORNIASTATEOF <br />LEC T R ICAL <br />EXP: 3-31-27 <br />EFORPDERETS <br />I <br />G <br />ER RE <br />EN <br />IGNE <br />LANOISS <br />CA L I FORNIASTATEOF <br />No. E21819 <br />E <br /> <br />ALI S A FAIAN <br />90% CD 5/02/2024 <br />CYPRESS STREET <br />FIRE STATION <br />REHABILITATION <br />CITY OF SANTA ANA <br />625 S. CYPRESS <br />SANTA ANA, CA <br />Project number <br />Date <br />Drawn by TP/HH <br />23004 <br />1/15/2025 <br />PERMIT SET 5/17/2024 <br />BACK CHECK SET 1/15/2025 <br />BACK CHECK SET_V2 4/08/2025 <br />LIGHTING <br />FIXTURE <br />SCHEDULES <br />LIGHTING FIXTURE NOTES <br />1.ALL FIXTURES SHALL HAVE APPROPRIATE U.L. LABEL, DAMP, OR WET AS <br />REQUIRED BY LOCAL CODES. <br />2.ALL FIXTURES SHALL INCLUDE ALL ACCESSORIES FOR INSTALLATION <br />ACCORDING TO ALL CALIFORNIA ELECTRICAL CODES. <br />3.PRIOR TO ORDERING ANY LIGHTING EQUIPMENT, THE CONTRACTOR SHALL <br />VERIFY ALL LOCATIONS AND RECESS DEPTHS. <br />4.ALL LAMPS SHALL BE INSTALLED ACCORDING TO THE ATTACHED FIXTURE <br />SCHEDULE. <br />5.CONTRACTOR SHALL VERIFY FINAL VOLTAGES AND CEILING TRIM <br />COMPATIBILITY PRIOR TO ORDERING FIXTURES. <br />6.CEILING THICKNESS IN EXCESS OF 3/4" SHALL BE IDENTIFIED IN WRITING BY <br />CONTRACT. <br />7.ALL FIXTURES SHALL BE ORDERED WITH THE APPROPRIATE BALLASTS THAT <br />HAVE U.L. AND CBM LABELS. ALL BALLASTS MUST CONFORM TO TITLE 24 <br />REQUIREMENTS FOR PERFORMANCE, SWITCHING, AND WIRING (I.E. TANDEM). <br />8.PROVIDE APPROVED FIRE-RATED ENCLOSURES FOR ALL LIGHTING FIXTURES <br />LOCATED IN A FIRE-RATED CEILING. <br />9.WALLS DIRECTLY ILLUMINATED SHALL BE INSTALLED AND FINISHED IN A <br />MANNER TO ELIMINATE SHADOWS OR BLEMISHES (I.E. HANG DRY WALL <br />VERTICALLY). <br />10.ANY FIXTURE SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT AND <br />OWNER'S REPRESENTATIVE PRIOR TO BID. CONTRACTOR MUST BE PREPARED <br />TO SUPPLY A SAMPLE AND/OR PHOTOMETRIC DATA IF REQUESTED. <br />11.ALL EMERGENCY BATTERY PACKS SHALL BE FURNISHED WITH 90-MIN MINIMUM <br />BACK UP CAPABILITY AND PROVIDE NO LESS THAN 1/3 OF THE FULL LUMEN <br />OUTPUT OF ANY INDIVIDUAL LAMP. LED LIT, TEST SWITCHES TO BE INTEGRAL <br />TO FIXTURE, NOT REMOTE MOUNTED. CONTRACTOR SHALL ENSURE THAT A <br />MINIMUM OF 1-FOOTCANDLE IS PROVIDED AT FLOOR LEVEL ALONG PATH OF <br />EGRESS. <br />12.LIGHTING INSTALLED IN CORRIDORS AND STAIRWELLS SHALL BE CONTROLLED <br />BY OCCUPANT SENSING CONTROLS THAT SEPARATELY REDUCE THE LIGHTING <br />POWER BY AT LEAST 50% WHEN THE SPACE IS UNOCCUPIED. <br />13.SHADED FIXTURE INDICATES EGRESS FIXTURE WITH 90 MIN. BATTERY <br />BACKUP OR CONNECTED TO LIGHTING INVERTER. <br />N.T.S.E0.11 <br />1 LIGHTING FIXTURE SCHEDULES