Laserfiche WebLink
ROOF GENERAL NOTES <br />1. REFER TO ADDITIONAL NOTES ON SHEET T0.01. <br />2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS. <br />NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED <br />WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE <br />ARCHITECT. <br />3. PATCH (E) SURFACES OPENED FOR INSTALLATION OF STRUCTURAL AND MEP WORK. PATCH <br />SHALL MATCH (E) CONDITIONS. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. <br />PROTECT ALL EXISTING ITEMS THAT ARE TO REMAIN. <br />4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED <br />WALL, U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE <br />VERIFIED BY THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT <br />WITH THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK. <br />5. REMOVE ALL OBSOLETE EQUIPMENT, PANELS, CONDUIT AND PIPING. ALL UTILITIES SHALL BE <br />REMOVED TO AS FAR BACK TO THEIR ORIGIN AS POSSIBLE. ALL UTILITIES SHALL BE PROPERLY <br />CAPPED AT THEIR TERMINATION. <br />6. REFER TO HAZMAT REPORT FOR LOCATIONS REQUIRING ABATEMENT AND REMOVAL. <br />7. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE <br />REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES <br />ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET <br />THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION. <br />ROOF PLAN LEGENDKEYNOTES <br />PATCH SHEATHING AT (E) OPENING IN ROOF <br />TPO MEMBRANE, CLASS A, ROOFING SYSTEM, OVER COVER BOARD OVER <br />PLYWOOD SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; <br />PROVIDE TAPERED INSULATION AS REQUIRED TO MAINTAIN MINIMUM SLOPE <br />REQUIREMENTS; REFER TO DETAIL <br />MEMBRANE ROOFING SPECIFICATION (BASIS OF DESIGN): <br />GAF EVERGUARD TPO 60 MIL MEMBRANE, WHITE <br />CRRC PRODUCT ID: 0676-0159 <br />SRI: INITIAL 101, AGED 79 <br />ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER <br />PLYWOOD SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; <br />NEW REPLACEMENT TILE TO BE SOURCED FROM GLADDING MCBEAN AT <br />BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR BLEND AND INSTALL <br />NEW BIRD STOPS AT END TILES; REFER TO DETAIL <br />LIGHT FIXTURE TAG, REFER TO A1.20 FOR FIXTURE SCHEDULEFx <br />1 <br />A5.05 <br />13 <br />A5.05 <br />1 <br />A3.00 <br />1 <br />A3.01 <br />2 <br />A3.00 <br />1 <br />2 <br />3 <br />A B C D E F <br />2' <br /> <br />- <br /> <br />1 <br />" <br />15 <br />' <br /> <br />- <br /> <br />8 <br />" <br />1' <br /> <br />- <br /> <br />6 <br />" <br />23 <br />' <br /> <br />- <br /> <br />6 <br />" <br />1' <br /> <br />- <br /> <br />3 <br />" <br />19 <br />' <br /> <br />- <br /> <br />3 <br />" <br />19' - 3" <br />7"7' - 1"18' - 0"22' - 6"23' - 7"18' - 6"7" <br />18' - 11"71' - 11" <br />RI <br />D <br />G <br />E <br />LEVEL LEVEL <br />LE <br />V <br />E <br />L <br />LE <br />V <br />E <br />L <br />F10 F10 F10 F10 F10 <br />F10 <br />F10 <br />F9F9F9F9 <br />F9 <br />23-01 <br />23-01 <br />TYP. <br />07-04 <br />TYP. <br />07-08 <br />TYP. <br />07-04 <br />TYP. <br />07-08 <br />07-05 <br />07-05 <br />22-01 22-01(E) 1/2" / 1'-0" <br />TYP. <br />07-02 <br />TYP. <br />07-02 <br />TYP. <br />07-10 <br />TYP. <br />07-1007-06 07-06 <br />07-05 <br />F9F9 <br />F9 <br />07-03 <br />07-11 <br />RI <br />D <br />G <br />E <br />8 <br />A5.05 <br />8 <br />A5.05 <br />23-08 <br />23-09 <br />2 <br />A5.05 <br />2 <br />A5.05 <br />2 <br />A5.05 <br />14 <br />A5.05 <br />18 <br />A5.05 <br />18 <br />A5.05 <br />17 <br />A5.05 <br />3 <br />A5.05 <br />3 <br />A5.05 <br />5 <br />A5.05 <br />VALLEY VALLEY <br />19 <br />A5.05 <br />(E) 6" / 1'-0"(E) 6" / 1'-0" <br />(E) 6" / 1'-0" <br />(E <br />) <br /> <br />6" <br /> <br />/ <br /> <br />1 <br />' <br />- <br />0 <br />" <br />(E) 6" / 1'-0" <br />(E <br />) <br /> <br />6" <br /> <br />/ <br /> <br />1 <br />' <br />- <br />0 <br />" <br />MIN., VIF <br />(E) 1/2" / 1'-0" <br />MIN., VIF <br />(E) 1/2" / 1'-0" <br />MIN., VIF <br />(E) 1/2" / 1'-0" <br />MIN., VIF <br />(E <br />) <br /> <br />1 <br />/ <br />2 <br />" <br /> <br />/ <br /> <br />1 <br />' <br />-0" <br /> <br />MI <br />N <br />. <br />, <br /> <br />V <br />I <br />F <br />(E <br />) <br /> <br />1 <br />/ <br />2 <br />" <br /> <br />/ <br /> <br />1 <br />' <br />-0" <br /> <br />MI <br />N <br />. <br />, <br /> <br />V <br />I <br />F <br />Scale <br />Project number <br />Date <br />Drawn by <br />Jen Dunbar, AIA <br />phone: 310.435.3928 <br />12314 La Maida Street <br />Valley Village, CA 91607 <br />jen@dunbararchitecture.com <br />DUNBAR <br />ARCHITECTURE <br />JD/AP <br />1/4" = 1'-0" <br />4/ <br />7 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />9 <br />: <br />2 <br />1 <br />: <br />2 <br />6 <br /> <br />P <br />M <br />A1.10 <br />PROPOSED ROOF <br />PLAN <br />23004 <br />CYPRESS CENTER <br />RESTORATION <br />CITY OF SANTA ANA <br />1/17/2025 <br />625 S. CYPRESS AVE. <br />SANTA ANA, CA 92701 <br />0'8'4'4' <br />1/4" = 1'-0"A1.10 <br />1 ROOF - PROPOSED <br />07-02 TPO MEMBRANE ROOFING SYSTEM OVER COVER BOARD OVER PLYWOOD SHEATHING PER <br />STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; PROVIDE TAPERED INSULATION AS REQUIRED TO <br />MAINTAIN MINIMUM SLOPE REQUIREMENTS <br />07-03 ROOF HATCH <br />07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD <br />SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE <br />SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR <br />BLEND AND INSTALL NEW BIRD STOPS AT END TILES <br />07-05 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS CLOSE <br />AS POSSIBLE <br />07-06 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS CLOSE <br />AS POSSIBLE TO CONNECT TO ROOF DRAIN; REPLACE OVERFLOW SCUPPER IN (E) LOCATION <br />07-08 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS <br />AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL <br />MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S <br />STANDARDS FOR REHABILITATION; INSTALL NEW METAL MESH DEBRIS COVER <br />07-10 PARAPET FLASHING <br />07-11 CRICKET, SLOPE TO ROOF AND OVERFLOW DRAINS, MAINTAIN MIN. SLOPE OF 1/8:12 ALONG FLOW <br />LINES <br />22-01 ROOF DRAIN TO CONNECT TO CONDUCTOR HEAD AND DOWNSPOUT; THRU-WALL OVERFLOW <br />SCUPPER <br />23-01 OUTSIDE AIR DUCT; REFER TO MECHANICAL DRAWINGS <br />23-08 EXHAUST FAN, REFER TO MECHANICAL DRAWINGS <br />23-09 EXHAUST AIR DUCT, REFER TO MECHANICAL DRAWINGS <br />No. Description Date <br />DESIGN DEVELOPMENT 1/12/2024 <br />75% CD 3/15/2024 <br />90% CD 5/14/2024 <br />PERMIT SET 5/17/2024 <br />OCFA SUBMITTAL 9/26/2024 <br />BACKCHECK SET 1/17/2024 <br />BACKCHECK SET_V2 4/8/2025