Laserfiche WebLink
PART 1 - GENERAL <br />1.01 DESCRIPTION <br />A.PRINCIPAL WORK IN THIS SECTION: <br />1. PROVIDE A COMPLETE PLUMBING SYSTEM INCLUDING: <br />A. DOMESTIC HOT & COLD WATER SYSTEM. <br />B. WASTE & VENT SYSTEM. <br />C. PLUMBING FIXTURES AND TRIM. <br />B.ORDINANCES AND REGULATIONS: THE PLUMBING WORK SHALL BE DESIGNED TO COMPLY WITH, AND SHALL BE <br />INSTALLED IN ACCORDANCE WITH ALL OF THE REQUIREMENTS OF ALL LEGALLY CONSTITUTED AUTHORITIES <br />HAVING JURISDICTION, INCLUDING ALL LOCAL ORDINANCES AND THE SAFETY ORDERS OF THE STATE INDUSTRIAL <br />ACCIDENT COMMISSION. <br />C.PERMITS AND INSPECTIONS: OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS WHICH ARE REQUIRED FOR <br />THE WORK OF ALL LEGALLY CONSTITUTED AUTHORITIES HAVING JURISDICTION. DELIVER CERTIFICATES OF ALL <br />SUCH PERMITS AND INSPECTIONS TO THE OWNER. <br />D.EXAMINATION OF THE DRAWINGS AND THE SITE: CAREFULLY STUDY ALL DRAWINGS AND SPECIFICATIONS <br />PERTAINING TO THE WORK. IF ANY OF THE WORK AS LAID OUT, INDICATED OR SPECIFIED IS CONTRARY TO OR <br />CONFLICTS WITH ANY LOCAL, CITY, STATE OR NATIONAL ORDINANCES OR REGULATIONS, THE SAME SHALL BE <br />HEREBY DEEMED TO HAVE BEEN REPORTED TO AND REVIEWED WITH THE ARCHITECT BEFORE COMMENCING <br />WORK UNDER THE CONTRACT. THE ARCHITECT WILL ISSUE INSTRUCTIONS AS TO PROCEDURE FOR <br />MODIFICATIONS. CAREFULLY EXAMINE THE BUILDING SITE AND COMPARE THE DRAWINGS WITH EXISTING <br />CONDITIONS. BY ACT OF COMMENCING WORK UNDER THE CONTRACT, THE CONTRACTOR SHALL BE DEEMED TO <br />HAVE MADE SUCH EXAMINATIONS AND TO HAVE ACCEPTED SUCH CONDITIONS AND TO HAVE MADE ALLOWANCES <br />HE DEEMS FIT IN KEEPING WITH INSTRUCTIONS HEREIN. <br />E.VERIFICATION OF DIMENSIONS: BEFORE PROCEEDING WITH ANY WORK, CAREFULLY CHECK AND VERIFY ALL <br />DIMENSIONS, SIZES, ETC. WHERE APPARATUS AND EQUIPMENT HAVE BEEN INDICATED ON THE DRAWINGS, <br />DIMENSIONS HAVE BEEN TAKEN FROM TYPICAL EQUIPMENT OF THE CLASS INDICATED. CAREFULLY CHECK THE <br />DRAWINGS TO SEE THAT THE EQUIPMENT WILL FIT INTO THE SPACES PROVIDED. <br />F.LOCATIONS: ALL PIPING SHALL BE INSTALLED IN A MANNER AND IN LOCATIONS AVOIDING ALL OBSTRUCTIONS, <br />PRESERVING HEADROOM, AND KEEPING OPENINGS AND PASSAGEWAYS CLEAR. THE DRAWINGS ARE ESSENTIALLY <br />DIAGRAMMATIC TO THE EXTENT THAT MANY OFFSETS, BENDS, SPECIAL FITTINGS AND EXACT LOCATIONS ARE NOT <br />INDICATED. CAREFULLY STUDY THE DRAWINGS AND PREMISES IN ORDER TO DETERMINE THE BEST METHODS, <br />EXACT LOCATIONS, ROUTES, BUILDING CONSTRUCTIONS, ETC., TO INSTALL ALL APPARATUS AND EQUIPMENT IN <br />THE AVAILABLE LOCATIONS. <br />G.OPENINGS: COOPERATE WITH ALL TRADES IN PROVIDING INFORMATION AS TO OPENINGS REQUIRED IN WALLS <br />AND SLAB FOR ALL PIPING AND EQUIPMENT. <br />1.HOLES IN CONCRETE, MASONRY, STEEL AND WOOD STRUCTURAL ELEMENTS ARE PROHIBITED WITHOUT <br />WRITTEN AUTHORIZATION FROM THE STRUCTURAL ENGINEER. <br />2.HOLES IN STRUCTURAL BEAMS ARE PROHIBITED WITHOUT WRITTEN AUTHORIZATION FROM THE STRUCTURAL <br />ENGINEER. <br />H.PROTECTION OF FINISH: PROVIDE ADEQUATE MEANS FOR AND FULLY PROTECT ALL FINISH PARTS OF THE <br />MATERIALS AND EQUIPMENT AGAINST DAMAGE FROM WHATEVER CAUSE DURING THE PROGRESS OF THE WORK <br />AND UNTIL FINAL COMPLETION. ALL MATERIALS AND FIXTURES IN STORAGE AND DURING CONSTRUCTION SHALL <br />BE COVERED IN SUCH A MANNER THAT NO FINISHED SURFACES WILL BE DAMAGED OR MARRED AND ALL MOVING <br />PARTS SHALL BE KEPT PERFECTLY CLEAN AND DRY. PLUG AND CAP ALL PIPING DURING CONSTRUCTION AND <br />KEEP FREE OF DEBRIS AND CONTAMINATION. <br />I.TESTS, GENERAL: TESTS SHALL COMPLY WITH ALL NECESSARY CODES, RULES AND REGULATIONS AS NOTED <br />HEREINBEFORE. SUPPLY ALL INSTRUMENTS, LABOR AND TOOLS REQUIRED FOR THE TESTS. ANY DEFECTIVE <br />MATERIAL OR EQUIPMENT SHALL BE REPAIRED, ADJUSTED OR REPLACED BY NEW MATERIAL OR EQUIPMENT AND <br />BE TESTED BEFORE ACCEPTANCE. <br />1. WHILE ALL LINES ARE EXPOSED TO VIEW, AND BEFORE THE INSTALLATION OF ANY FIXTURE, THE ENDS OF <br />THE WASTE AND VENT SYSTEM SHALL BE CAPPED EXCEPT THE HIGHEST OPENING OF THE SECTION UNDER <br />TEST. THE LINES SHALL BE FILLED WITH WATER TO THE HIGHEST OPENING OF THE SECTION UNDER TEST, BUT <br />NO SECTION SHALL BE TESTED WITH LESS THAN TEN (10) FOOT HEAD OF WATER. THE WATER SHALL BE KEPT <br />IN THE SYSTEM FOR 24 HOURS PRIOR TO INSPECTION. TESTS MAY BE MADE IN SECTIONS, IF NECESSARY, OR <br />CONVENIENCE SO INDICATES; HOWEVER, ALL INTERCONNECTIONS BETWEEN NEW SECTIONS TO BE SO <br />TESTED AND PREVIOUSLY TESTED SECTIONS SHALL BE INCLUDED IN THE NEW TEST. <br />2.WATER PIPING SHALL BE SUBJECT TO A WATER HYDROSTATIC TEST OF NOT LESS THAN 150 PSI FOR 24 <br />HOURS WITH NO PERCEPTIBLE DROP IN PRESSURE AND BE PROVEN TIGHT. CONNECTION POINTS SHALL BE <br />TESTED AFTER THE CONNECTIONS ARE MADE. <br />3.OPERATIONAL TESTS SHALL BE MADE ON ALL FIXTURES AND DEVICES TO DETERMINE PROPER COMPLIANCE <br />WITH THE SPECIFICATIONS. ALL FIXTURES SHALL FUNCTION QUIETLY AND EFFICIENTLY, ANY UNDUE NOISE OR <br />VIBRATION CAUSED BY THE MALFUNCTIONING OF THE PIPING, FIXTURES, ETC., SHALL BE PROMPTLY <br />REPLACED OR BE CORRECTED BEFORE ACCEPTANCE. <br />4.SHOULD ANY PIECE OF APPARATUS OR ANY MATERIAL OR WORK FAIL IN ANY OF THE ABOVE TESTS, IT SHALL <br />BE REMOVED IMMEDIATELY AND BE REPLACED WITH NEW AND PERFECT MATERIAL AND THE EQUIPMENT IN <br />QUESTION RETESTED AS SPECIFIED WITHOUT ADDITIONAL EXPENSE TO THE OWNER. <br />J.ADJUSTING: UPON COMPLETION OF WORK AND AFTER CLEANING OF SYSTEM AND APPARATUS, AUTOMATIC <br />PARTS OF PLUMBING SYSTEMS SHALL BE CAREFULLY ADJUSTED FOR NORMAL OPERATION. VACUUM BREAKERS <br />ON WATER SUPPLY TO FIXTURES SHALL BE INSPECTED AND CLEANED OF ANY FOREIGN MATERIAL THAT WOULD <br />HINDER THEIR PROPER FUNCTIONING. <br />K.DAMAGE BY LEAKS: ATTENTION IS ESPECIALLY CALLED TO THE FACT THAT THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR DAMAGE TO ANY PART OF THE PREMISES CAUSED BY LEAKS OR BREAKS IN THE PIPE OR <br />FIXTURES INSTALLED UNDER THIS SECTION FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE OF <br />THE WORK BY THE OWNER. <br />L.GUARANTEE: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK UNDER THIS SECTION AND SHALL <br />ADJUST ALL VALVES, CONTROLS, VACUUM BREAKERS AND INCIDENTAL ITEMS AND SHALL LEAVE THE SYSTEM IN <br />PERFECT OPERATING CONDITION. HE SHALL REGULATE, REPAIR AND REPLACE AT HIS OWN EXPENSE ANY <br />DEFECTIVE WORKMANSHIP, MATERIALS AND EQUIPMENT OF THE WORK. THE DECISION OF THE ARCHITECT SHALL <br />BE FINAL IN RESPECT TO IMPERFECTIONS. CONTRACTOR SHALL FURNISH THE OWNER ALL MANUFACTURERS' <br />WRITTEN GUARANTEES OF MATERIALS AND EQUIPMENT. <br />M.SUBMITTALS: <br />1.MATERIAL LIST: BEFORE ENTERING INTO ANY CONTRACT FOR PURCHASE OF MATERIALS, AND BEFORE ANY <br />WORK IS STARTED, SUBMIT FOR APPROVAL SIX (6) IDENTICAL COPIES OF A COMPLETE LIST, INCLUDING <br />CATALOGS AND DESCRIPTIVE MATTER OF THE FOLLOWING MATERIALS AND EQUIPMENT PROPOSED TO BE <br />FURNISHED AND INSTALLED. MATERIALS LIST TO BE COMPLETE AND CONTAINED IN HARD-BOUND JACKETS. <br />ITEMS NOT CONTAINED IN SUBMITTAL TO CONFORM TO DESIGN SPECIFICATIONS AS SUPPLEMENTAL <br />SUBMITTALS WILL NOT BE ACCEPTED. <br />M.1.1.FIXTURES. <br />M.1.2.PIPING AND FITTINGS. <br />M.1.3.INSULATION. <br />M.1.4.VALVES. <br />N. RECORD DRAWINGS: <br />1.ONE COMPLETE SET OF PLUMBING DRAWINGS WILL BE PROVIDED AS RECORD DRAWINGS, WHICH SHALL BE <br />SEPARATE, CLEAN, BLUE LINE PRINTS RESERVED FOR THE PURPOSE OF SHOWING A COMPLETE PICTURE OF <br />THE WORK AS ACTUALLY INSTALLED. <br />2.THESE DRAWINGS SHALL ALSO SERVE AS WORK PROGRESS REPORT SHEETS AND THE CONTRACTOR SHALL <br />MAKE ANY NOTATIONS, NEAT & LEGIBLE, THEREON DAILY AS THE WORK PROCEEDS. THESE DRAWINGS SHALL <br />BE AVAILABLE FOR INSPECTION AT ALL TIMES AND SHALL BE KEPT AT THE JOB AT A LOCATION DESIGNATED <br />BY THE ARCHITECT. <br />3.AT COMPLETION OF THE WORK, THESE RECORD DRAWINGS SHALL BE SIGNED BY THE CONTRACTOR, DATED <br />AND RETURNED TO THE ARCHITECT. <br />O. SEISMIC: <br />1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ANCHORS AND CONNECTIONS OF PLUMBING WORK TO THE <br />BUILDING STRUCTURE TO PREVENT DAMAGE AS A RESULT OF AN EARTHQUAKE, INCLUDING MANUFACTURED <br />EQUIPMENT, AND CONNECTION AND INTEGRITY OF SHOP FABRICATED AND FIELD FABRICATED MATERIALS <br />AND EQUIPMENT. DESIGN BUILDING EQUIPMENT AND CONNECTIONS THEREFORE TO RESIST LATERAL SEISMIC <br />FORCES EQUAL TO 0.5 AND 0.75 OF EQUIPMENT WEIGHT TO WORKING ALLOWABLE STRESS OR IN <br />CONFORMANCE WITH TITLE 24 OF THE CAC, DIVISION 22, ARTICLE 23-J, AND BUILDING CODE. REFERENCE <br />DETAILS PER "GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING PIPING <br />SYSTEMS" AS PUBLISHED BY SMACNA AND PPIC. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. ALL PIPING, FITTINGS AND VALVES SHALL BE U.S.A. MADE, IMPORTED PRODUCT IS NOT ACCEPTABLE. <br />B. WASTE, AND VENT PIPING. <br />1.PIPING: STANDARD WEIGHT CAST IRON NO HUB, CISPI 310, PIPING SHALL BE MARKED WITH THE COLLECTIVE <br />TRADEMARK OF CISPI. <br />2.FITTINGS: HEAVY DUTY CAST IRON NO HUB FITTINGS, ABOVE CISPI 310, WITH STAINLESS STEEL 4 BAND AND <br />SHIELD WITH NEOPRENE GASKET AS MANUFACTURED BY HUSKY SERIES HD 4000 COUPLING, ALL STAINLESS <br />STEEL CLAMP, SCREW AND SHIELD. <br />C. COLD WATER, HOT WATER, HOT WATER RETURN. <br />1. COLD WATER, HOT WATER, AND TRAP PRIMER PIPING: SEAMLESS COPPER TUBING, TYPE "L", COLD DRAWN, <br />HARD TEMPER, ASTM B-88. <br />2. HOT WATER RETURN PIPING: SEAMLESS COPPER TUBING, TYPE "K", COLD DRAWN, HARD TEMPER, ASTM B-88. <br />3. FITTINGS: WROUGHT COPPER SOLDER SWEAT TYPE, ANSI B16.24 OR BRASS CASTING, ANSI B16.18. <br />4. EXPOSED TO VIEW AT PLUMBING FIXTURES AND FINISHED EQUIPMENT, SATIN FINISH, CHROME PLATED <br />BRASS PIPE WITH THREADED CAST BRONZE FITTINGS. <br />D. WATER VALVES: BALL VALVES (1/2"- 4"), SHALL BE TWO-PIECE STYLE, FULL PORT, BRONZE BODY (ASTM 62 OR <br />B584) WITH TYPE 316 STAINLESS STEEL BALL AND STEM AND PTFE (OR RPTFE) SEATS AND SEALS. VALVES SHALL <br />BE RATED FOR 600 PSIG WOG & 150 PSIG SWP (NON-SHOCK). VALVES SHALL HAVE ADJUSTABLE PACKING GLANDS <br />AND BLOWOUT PROOF (INTERNALLY RETAINED) STEMS AND SHALL COMPLY WITH THE LATEST EDITION OF <br />MSS-SP-110. THREADED END (FNPT) BALL VALVES ONLY; USE MALE ADAPTERS WHERE REQUIRED IN SOLDERED <br />END APPLICATIONS. <br />A.CONBRACO INDUSTRIES, INC. APOLLO DIVISION FIGURE 77-140 OR 77LF-140 (LEAD-FREE). <br />B.MILWAUKEE VALVE FIGURE BA400S OR UBA400S (LEAD-FREE). <br />C.HAMMOND VALVE FIGURE 8303A OR UP8303A (LEAD-FREE). <br />D.NIBCO FIGURE T-585-66 OR S-585-66 LF (LEAD-FREE). <br />E.OR EQUAL. <br />A. HANGERS AND SUPPORT <br />1. WASTE AND VENT STORM DRAIN AND OVERFLOW PIPING: SUPER STRUT NO.C-711 "J" HANGER WITH SUPER <br />STRUT NO. H-104 THREADED ROD WITH HEX NUT. <br />2. COPPER PIPING: SUPER STRUT NO. C-711-F "J" HANGER WITH SUPER STRUT NO. H-104 THREADED ROD WITH <br />HEX NUT. WITH WAFFLE PATTERN HAIR FELT ISOLATION PADDING. <br />K. INSULATION <br />INSULATE ALL HOT WATER PIPING 3/4 INCH AND SMALLER WITH 1 INCH THICK, PIPING 1 INCH TO 1½ INCH WITH 1½ INCH <br />THICK, AND PIPING 2 INCH AND LARGER WITH 2 INCH THICK PREFORMED FIBERGLASS INSULATION WITH INTEGRAL <br />ALL-PURPOSE FIRE RETARDANT, GLASS YARN SCRIM LAMINATED, WHITE JACKET, "K" FACTOR SHALL BE 0.23 MAXIMUM <br />AT 75 DEGREES F. MEAN TEMPERATURE TO MEET FEDERAL AND STATE ENERGY CODE REQUIREMENTS. ALL FLANGES, <br />UNION, FITTINGS AND VALVE SHALL BE INSULATED WITH PREFORMED INSULATION WITH PVC PREMOLDED ONE PIECE <br />FITTING COVER (MANVILLE ZESTON 2000 MANUFACTURER: MANVILLE MICRO-LOC AP-T, OWENS-CORNING FIBERGLASS, <br />P.P.G., CERTAIN-TWEED OR APPROVED EQUAL. ADHESIVE SHALL BE BENJAMIN FOSTER 85-20. PROVIDE SHIELDS TO <br />PROTECT INSULATION AT AREAS OF CONTACT WITH HANGERS AND SUPPORT (SUPER STRUT C-790) INSULATION <br />MATERIALS, ADHESIVES, COATINGS, AND OTHER ACCESSORIES SHALL HAVE A FIRE HAZARD RATING, NOT TO EXCEED <br />25 FOR FLAME SPREAD AND 50 FOR FUEL CONTRIBUTED AND SMOKE DEVELOPED IN ACCORDANCE WITH ASTM E84, <br />NFPA 225, OR UL 723. <br />L. PLUMBING FIXTURES <br />1. SEE FIXTURE SCHEDULE. <br />M. CLEANOUTS: <br />1. CLEANOUTS SHALL BE AS FOLLOWS: <br />A. FINISHED WALLS: J.R. SMITH NO. 4437, OR EQUAL, W/CHROME PLATED BRONZE, ROUND FRAME AND SECURED <br />COVER. <br />B. FINISHED FLOORS: J.R. SMITH NO. 4023 - BRONZE <br />PART 3 - EXECUTION <br />3.01 INSTALLATION <br />A. ALL PIPING SHALL BE CONCEALED UNLESS NOTED OTHERWISE. <br />B. WATER PIPING SHALL HAVE A MINIMUM CLEARANCE OF 1/2" AND SHALL BE ISOLATED FROM BUILDING STRUCTURE <br />WITH NO LESS THAN 1/2" THICK WAFFLE PATTERN HAIR FELT. <br />C. DISSIMILAR METALS SHALL BE ISOLATED BY USING DIELECTRIC 6 INCH BRASS COUPLINGS. DIELECTRIC <br />COUPLINGS SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION. THAN ½" THICK WAFFLE PATTERN HAIR FELT. <br />D.ALL SECURITY RATED SPL 4&5 PERIMETER WALL PENETRATIONS SHALL BE IN COMPLIANCE WITH ICD 705 AND <br />SECURITY APPROVAL. AT PENETRATIONS PIPING SHALL HAVE DIELECTRIC BREAKS AND/OR SHALL BE GROUNDED <br />PER SECURITY REQUIREMENTS. PENETRATIONS SHALL ALSO BE SEALED WITH ACOUSTICAL CAULKING TO <br />MAINTAIN THE ACOUSTICAL RATING OF THE WALL. <br />E. PLUMBING FIXTURES SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH CONNECTION TO SUPPLY <br />DRAINAGE PIPING. MOUNTING HEIGHTS SHALL CONFORM TO THE HANDICAPPED REQUIREMENTS. <br />F. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED RECOMMENDATIONS. <br />G. PROVIDE VALVES AND UNIONS AT EACH PIECE OF EQUIPMENT TO PROVIDE ISOLATION OF THE EQUIPMENT FROM <br />ITS CONNECTED SYSTEM. <br />3.02 COMPLETION OF INSTALLATION <br />A. CLEANING AND FLUSHING: PRIOR TO ACCEPTANCE, CLEAN ALL EQUIPMENT AND MATERIAL THOROUGHLY. LEAVE <br />SURFACE TO BE PAINTED SMOOTH AND CLEAN READY FOR PAINTING. <br />B. FLUSH EACH UNIT OF WATER SUPPLY AND DISTRIBUTION SYSTEM THOROUGHLY WITH CLEAN WATER AT AS HIGH <br />VELOCITIES ATTAINABLE. <br />C. CLEAN ALL PIPING VALVES, TRAPS, STRAINERS, WATER HEATERS, ETC., THOROUGHLY AND FLUSH OR BLOW OUT <br />UNTIL FREE OF SCALE, SILT, SAND, SEDIMENT, PIPE DOPE AND FOREIGN MATTER OF ANY KIND. <br />3.03 CHLORINATION OF SYSTEM <br />A.AFTER THE WATER SYSTEMS (INDUSTRIAL AND DOMESTIC) ARE COMPLETE, ALL FIXTURES CONNECTED, THE <br />SYSTEM FLUSHED OUT COMPLETELY AND FILLED W/ WATER, THE SHUT-OFF VALVE TO THE WATER MAIN SHALL BE <br />CLOSED, ALL FIXTURE OUTLETS OPENED SLIGHTLY AND A SOLUTION OF SODIUM HYPOCHLORITE INTRODUCED AT <br />THE TEE LOCATED NEAR THE WATER SERVICE SHUT-OFF VALVE. <br />B.THE SOLUTION SHALL CONSIST OF ONE GALLON OF 5 PERCENT SODIUM HYPOCHLORITE TO 200 GALLONS OF <br />WATER OR THE EQUIVALENT THEREOF. INTRODUCE SOLUTION BY MEANS OF A PUMP UNTIL AN ORTHOTOLIDIN <br />TEST AT EACH OUTLET SHOWS RESIDUAL CHLORINE. THE SOLUTION SHALL BE ALLOWED TO REMAIN IN THE <br />SYSTEM 24 HOURS, AFTER WHICH, FLUSH THE ENTIRE SYSTEM OF WATER PIPING. <br />C.DELIVER A CERTIFICATE OF COMPLIANCE, SIGNED BY THE PERSON WHO DID THE WORK AND THE CONTRACTOR, <br />TO THE ARCHITECT. <br />Sheet No. <br />Project <br />Agency Plan Check / Permit No. <br />Petersen Design Project No. <br />Consultant <br />5082.1 <br />652 East Dyer Drive <br />Santa Ana, CA 92705 <br />DYER WAREHOUSE <br />Staging & Set-Up Space <br />Tenant Improvements <br />Sheet Title <br />Revision / Submittal History <br />Scale <br />Status <br />. <br />architecture + planning <br />Agency Approval <br />Petersen Design Architects, Inc. <br />17582 Fiesta Way, Tustin, CA 92780 <br />M: 714.904.6720 E: mike@mpdarch.com <br />www.mpdarch.com <br />Architect's Stamp <br />. <br />255 E. Rincon St., Suite 301 <br />Corona, CA 92879 <br />P 951.340.1977 | F 951.340.1090 <br />www.gossengineering.com <br />CALOFI <br />GI <br />RE <br />NG <br />A <br />E <br />S <br />A <br />M <br />ET <br />SAT E HC A <br />F <br />NIC L <br />ORNI <br />EPR <br />ET <br />RED <br />OF ONAL <br />SSI <br />NE <br />RE <br />I <br />No. M36781 <br />Exp. 3-31-26 <br />YRNEGA.WAHS <br />T <br />Project Number: 125-09-07 <br />Date Signed 10-30-25 <br />Specifications <br />P7.1