My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 6 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 6 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 1:27:25 PM
Creation date
2/25/2026 1:26:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ECS Pacific, Inc. <br />Project No. 81:1145 <br /> <br />City of Santa Ana Public Library Renovation <br />26 Civic Center Plaza <br />Santa Ana, California 92701 <br /> <br />COLD FLUID-APPLIED WATERPROOFING <br /> <br />07 1416 - 12 <br /> <br /> <br />b. Testing agency to prepare survey report indicating locations of initial <br />discontinuities, if any. <br />2. Obtain written approval of successful testing from the Architect for each area <br />before installing subsequent system layers. Any areas covered with subsequent <br />layers prior to receiving approval are subject to rejection. <br />C. Manufacturer's Field Service: Engage a site representative qualified by waterproofing <br />system manufacturer to inspect substrate conditions, surface preparation, membrane <br />application, flashings, protection, and drainage components and to furnish daily reports <br />to Architect. <br />1. Testing agency to verify thickness of waterproofing during application for each <br />600 sq. ft. of installed waterproofing or part thereof. <br />2. Final Inspection: Arrange for waterproofing system manufacturer's technical <br />personnel to inspect system installation on completion, in presence of Architect, <br />and to prepare inspection report. <br />3. Notify Architect and Owner 48 hours in advance of date and time of inspection. <br />4. Repair or remove and replace components of waterproofing system where <br />inspections indicate that they do not comply with specified requirements. <br />D. Additional Tests and Inspections: <br />1. Additional testing and inspecting, at Contractor's expense, will be performed to <br />determine if replaced or additional work complies with specified requirements. <br />2. Waterproofing system will be considered defective if it does not pass tests and <br />inspections. <br />E. Prepare test and inspection reports. <br />3.9 PROTECTION, REPAIR, AND CLEANING <br />A. Immediately remove and clean fluid-applied waterproofing materials from surfaces not <br />intended to receive the materials. <br />B. Protect waterproofing system from damage and wear during remainder of construction <br />period. <br />C. Protect installed protection course and composite drainage from damage due to UV <br />light, harmful weather exposures, physical abuse, and other causes. Provide temporary <br />coverings where material is subject to abuse and cannot be concealed and protected <br />by permanent construction immediately after installation. <br />D. Correct deficiencies in or remove waterproofing system that does not comply with <br />requirements, repair substrates, and repair or reinstall waterproofing system to a <br />condition free of damage and deterioration at time of Substantial Completion and in <br />accordance with warranty requirements. <br />E. Clean spillage and soiling from adjacent construction using cleaning agents and <br />procedures recommended in writing by manufacturer of affected construction. <br />F. Remove and dispose of all temporary materials used to protect adjacent work and <br />surrounding areas. <br />END OF SECTION 07 1416
The URL can be used to link to this page
Your browser does not support the video tag.