My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 6 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 6 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 1:27:25 PM
Creation date
2/25/2026 1:26:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEE PLAN FOR DIMENSION, <br />UNLESS <br />OTHERWISE NOTED. <br />1. <br />2. <br />PARTITION AS SCHEDULED, SEE <br />PLAN FOR TYPE. <br />FOR TYPICAL NOTES, SEE <br />SEE FIN. SCHED. FOR BASE <br />CONTINUOUS ACOUST. SEALANT AT <br />SOUND WALL <br />SEE FIN. SCHED. FOR FLOOR FINISH <br />ACOUSTICAL INSULATION AS SCHEDULED <br />ANCHOR, S.S.D. 5/S6.0-1 <br />GYP. BD., PTD. <br />SEE PLAN FOR DIMENSION <br />1. <br />2. <br />PARTITION AS SCHEDULED, SEE <br />PLAN FOR TYPE. <br />FOR TYPICAL NOTES, SEE <br />BELOW TOP TRACK, FASTEN GYP BD <br />TO 2"x16 GA FLAT STOCK SCREWS AT <br />8" O.C. TYP. <br />CONTINUOUS ACOUST. SEALANT AT <br />SOUND WALL <br />1" DEFLECTION SPACE <br />ACOUSTICAL INSULATION AS SCHEDULED <br />SLOTTED TRACK W/ 1-1/2" LEGS <br />CONCRETE SLAB <br />SEE FIN. SCHED. FOR FLOOR FINISH <br />SECURE TOP TRACK TO VALLEY <br />FLOOR UNITS, S.S.D. 3/S6.0-1 <br />DECK W/ MINERAL WOOL <br />GYP. BD., PTD. <br />S.S.D. 8/S6.0-4 FOR BRIDGING AND SPACING <br />S.S.D. 2/S7.1 FOR METAL PLATE, <br />GAUGE, SPACING AND FASTENERS <br />SEE PLAN FOR DIMENSION <br />1. <br />2. <br />PARTITION AS SCHEDULED, SEE <br />PLAN FOR TYPE. <br />FOR TYPICAL NOTES, SEE <br />BELOW TOP TRACK, FASTEN GYP BD <br />TO 2"x16 GA FLAT STOCK SCREWS AT <br />8" O.C., TYP. <br />CONTINUOUS ACOUST. SEALANT AT <br />SOUND WALL <br />S.S.D. 8/S6.0-4 FOR BRIDGING AND SPACING <br />1" DEFLECTION SPACE <br />ACOUSTICAL INSULATION AS SCHEDULED <br />SLOTTED TRACK W/ 1-1/2" LEGS <br />S.S.D. 3/S6.0-1 FOR METAL PLATE, <br />GAUGE, SPACING AND FASTENERS <br />CONCRETE SLAB <br />SECURE TOP TRACK TO VALLEY <br />FLOOR UNITS, S.S.D. 3/S6.0-1 <br />SEE FIN. SCHED. FOR FLOOR FINISH <br />MTL DECK W/ MINERAL WOOL <br />GYP. BD., PTD. <br />SEE PLAN FOR DIMENSION <br />1. <br />2. <br />PARTITION AS SCHEDULED, SEE <br />PLAN FOR TYPE. <br />FOR TYPICAL NOTES, SEE <br />BELOW TOP TRACK, FASTEN GYP BD <br />TO 2"x16 GA FLAT STOCK SCREWS AT <br />8" O.C., TYP. <br />CONTINUOUS ACOUST. SEALANT AT <br />SOUND WALL <br />1" DEFLECTION SPACE <br />ACOUSTICAL INSULATION AS SCHEDULED <br />SLOTTED TRACK <br />SECURE TOP TRACK TO VALLEY <br />FLOOR UNITS, S.S.D. 3/S6.0-1 <br />RIGID INSULATION <br />ROOF MEMBRANE <br />PROTECTION BOARD <br />GYP. BD., PTD. <br />DECK W/ MINERAL WOOL <br />S.S.D. 7/S7.3 FOR BRIDGING AND SPACING <br />S.S.D. 3/S6.0-1 FOR METAL PLATE, <br />GAUGE, SPACING AND FASTENERS <br />SEE PLAN FOR DIMENSION <br />1. <br />2. <br />PARTITION AS SCHEDULED, SEE <br />PLAN FOR TYPE. <br />FOR TYPICAL NOTES, SEE <br />BELOW TOP TRACK, FASTEN GYP BD <br />TO 2"x16 GA FLAT STOCK SCREWS AT <br />8" O.C., TYP. <br />CONTINUOUS ACOUST. SEALANT AT <br />SOUND WALL <br />1" DEFLECTION SPACE <br />ACOUSTICAL INSULATION AS SCHEDULED <br />SLOTTED TRACK W/ 1-1/2" LEGS <br />RIGID INSULATION <br />PROTECTION BOARD <br />ROOF MEMBRANE <br />MTL DECK W/ MINERAL WOOL <br />SECURE TOP TRACK TO VALLEY <br />FLOOR UNITS, S.S.D. 3/S6.0-1 <br />GYP. BD., PTD. <br />S.S.D. 8/S6.0-4 FOR BRIDGING AND SPACING <br />S.S.D. 3/S6.0-1 FOR METAL PLATE, <br />GAUGE, SPACING AND FASTENERS <br />PATCH AND SAND <br />SMOOTH AT FACE OF <br />EXISTING FRAME <br />4" METAL STUD TO <br />MATCH WITH F14 WALL <br />TYPE <br />1 LAYER OF GYPSUM <br />BOARD COVERING WITH <br />LEVEL 4 FINISH, PAINT <br />TO MATCH WALL FINISH <br />SCHEDULE <br />OPENING WIDTH V.I.F.OPENING HEIGHT V.I.F.EXISTING FRAME <br />AROUND DUCT OPENING <br />13 <br />A9.0-7 <br />DUCT OPENING <br />ANCHOR, S.S.D. 5/S6.0-1 <br />F14 <br />#10 SMS ATTACH <br />WEB OF STUD <br />THROUGH SIDE <br />OF EXISTING <br />FRAME AND <br />WALL BEHIND <br />FACE ALIGN <br />EXISTING WALL <br />EXISTING FRAME <br />AROUND DUCT OPENING <br />PATCH AND SAND <br />SMOOTH <br />ADJACENT WALL, <br />IF APPLIED(E) COLUMN <br />7/8" HAT CHANNEL, 24" O.C. MAX. <br />CONCRETE NAILS (E.G. HILTI X-U P8 STEEL/CONCRETE NAILS) <br />ON BOTH UPPER AND BOTTOM FLANGES, 24" O.C. MAX. <br />ST <br />09-30-2027 <br />OARCHITECT <br />FOF CA LE <br />REN. <br />AT ARNNO.SELIC NE <br />C-27893D TECHIT <br />ARC <br />DAVID SCHNEE <br />I <br />U <br />E <br />I <br />H <br />U <br />9 <br />AS.O <br />A <br />F R A N CN <br />4 0 8 0 <br />H <br />I <br />N <br />S <br />L11 <br />AL <br />E <br />CR <br />N D E N VA <br />,N I N G <br />CRAE <br />TCEIT <br />S C <br />S <br />N <br />N <br />G R O U P <br />7 <br />S <br />5 06 <br />C <br />0718 <br />2 <br />P <br />R <br />A <br />O <br />90 <br />A <br />EU <br />C <br />+ <br />ER <br />4 <br />SHEET TITLE AND NO. <br />SHEET NOTES <br />ISSUE DATE <br />PROJECT: <br />CA REG. <br />Project Arch.---- <br />---- <br />PERMIT SET 1ST ISSUANCE <br />BID SET <br />FINAL PERMIT/CONFORM SET <br />09/29/2023 <br />04/30/2024 <br />08/02/2024 <br />22575-01 <br />26 CIVIC CENTER <br />PLAZA <br />SANTA ANA <br />CA 92701 <br />SANTA ANA <br />LIBRARY <br />RENOVATION <br />CITY OF SANTA ANA <br />26 CIVIC CENTER PLAZA <br />SANTA ANA, CA 92701 <br />REV # DESCRIPTION DATE <br />1 BACKCHECK REV-1 03.01.2024 <br />2 CITY REVIEW REV-1 08.02.2024 <br />3 CITY REVIEW REV-2 10.18.2024 <br />4 CITY REVIEW REV-3 01.27.2025 <br />5 CITY REVIEW REV-4 04.07.2025 <br />6 CITY REVIEW REV-5 06.27.2025 <br />7 CITY REVIEW REV-6 10.24.2025 <br /> <br />REVIEWED FOR CONSTRUCTABILITY: <br /> 80470 <br />SEAN THOMAS. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />RECOMMENDED FOR CONSTRUCTION: <br /> 62968 <br />JASON GABRIEL. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />A9.0-7 <br />INTERIOR DETAILS <br />- METAL STUD <br />PARTITIONS <br /> 3" = 1'-0"1 IWA- TYPE E CHASE - BASE- CONC. SLAB <br /> 3" = 1'-0"2 IWA- TYPE E CHASE - HEAD @ COMPOSITE DECK - PARALLEL <br /> 3" = 1'-0"3 IWA- TYPE E CHASE - HEAD @ COMPOSITE DECK PERPEND. <br /> 3" = 1'-0"4 IWA- TYPE E CHASE - HEAD @ MTL DECK PARALLEL <br /> 3" = 1'-0"5 IWA- TYPE E CHASE - HEAD @ MTL DECK PERPEND. <br /> 3" = 1'-0"9IWA- PATCH AT EXISTING WALL OPENING FRONT ELEVATION <br /> 3" = 1'-0"13IWA- PATCH AT EXISTING WALL OPENING SECTION <br />#93 <br />RFI <br /> 3" = 1'-0"12IWA - HAT CHANNEL TO CONCRETE COL SECTION/ ELEVATION <br />#234 <br />RFI
The URL can be used to link to this page
Your browser does not support the video tag.