Laserfiche WebLink
GLAZING, SEE WIN. <br />SCHEDULE <br />DOOR & HARDWARE, <br />SEE DOOR <br />SCHEDULE <br />DOOR JAMB½” SELF TAPPING PANHEAD <br />SCREWS TO ATTACH THE CLIPS <br />1 1/2"5"5/8" GYPSUM BD, PTD. <br />MTL. STUDS <br />GLAZING, SEE WIN. <br />SCHEDULE <br />PARTITION AS SCHEDULED, <br />SEE PLANS FOR WALL TYPE <br />INT. STOREFRONT HEAD <br />MULLION <br />INSULATION, WHERE <br />OCCURS, SEE WALL <br />TYPE <br />ALUM. L TRIM MOLDING, <br />PTD., TYP. <br />1-5/8” SELF TAPPING DRYWALL <br />SCREWS EVERY 12 ” ON CENTER AND <br />ABOVE AND BELOW THE HINGE <br />CUTOUT.1 1/2"5" <br />5/8" GYPSUM BD, PTD. <br />GLAZING, SEE WIN. <br />SCHEDULE <br />PARTITION AS SCHEDULED, <br />SEE PLANS FOR WALL TYPE <br />INT. STOREFRONT HEAD <br />MULLION <br />INSULATION, WHERE <br />OCCURS, SEE WALL <br />TYPE <br />ALUM. L TRIM MOLDING, <br />PTD., TYP. <br />1-5/8” SELF TAPPING DRYWALL <br />SCREWS EVERY 12 ” ON CENTER AND <br />ABOVE AND BELOW THE HINGE <br />CUTOUT <br />1 1/2"5"INT. STOREFRONT SILL @ FLOOR <br />GLAZING, SEE WIN. SCHEDULE <br />FLOORING, SEE FINISH <br />PLAN & SCHEDULE <br />½” SELF TAPPING PANHEAD <br />SCREWS TO ATTACH THE CLIPS <br />5"1 1/2"1/16" MIN.GLAZING, SEE WIN. <br />SCHEDULE <br />INT. STOREFRONT VERTICAL <br />MULLION <br />ALUM. L TRIM MOLDING, <br />PTD., TYP.5"1 1/2"1/16" MIN.1 1/2"5"GLAZING, SEE WIN. <br />SCHEDULE <br />INT. STOREFRONT HEAD <br />MULLION <br />ALUM. L TRIM MOLDING, <br />PTD., TYP. <br />1-5/8” SELF TAPPING DRYWALL <br />SCREWS EVERY 12” ON CENTER AND <br />ABOVE AND BELOW THE HINGE <br />CUTOUT <br />PARTITION AS SCHEDULED, <br />SEE PLANS FOR WALL TYPE <br />1 1/2"5"5"1 1/2" <br />ANCHOR VIF CONC. OR WOOD <br />CURTAIN TRACK2 1/2" <br />OPTION A FOR CONC.: <br />3/8" X 21/2" WEDGE ANCHOR <br />W/FLUSH SCREW HEAD @ 18" O.C. <br />OPTION B FOR WOOD: <br />#12 X 3" @16" O.C. FLUSH HEAD <br />ST <br />09-30-2027 <br />OARCHITECT <br />FOF CA LE <br />REN. <br />AT ARNNO.SELIC NE <br />C-27893D TECHIT <br />ARC <br />DAVID SCHNEE <br />I <br />U <br />E <br />I <br />H <br />U <br />9 <br />AS.O <br />A <br />F R A N CN <br />4 0 8 0 <br />H <br />I <br />N <br />S <br />L11 <br />AL <br />E <br />CR <br />N D E N VA <br />,N I N G <br />CRAE <br />TCEIT <br />S C <br />S <br />N <br />N <br />G R O U P <br />7 <br />S <br />5 06 <br />C <br />0718 <br />2 <br />P <br />R <br />A <br />O <br />90 <br />A <br />EU <br />C <br />+ <br />ER <br />4 <br />SHEET TITLE AND NO. <br />ISSUE DATE <br />PROJECT: <br />CA REG. <br />Project Arch.---- <br />---- <br />PERMIT SET 1ST ISSUANCE <br />BID SET <br />FINAL PERMIT/CONFORM SET <br />09/29/2023 <br />04/30/2024 <br />08/02/2024 <br />22575-01 <br />26 CIVIC CENTER <br />PLAZA <br />SANTA ANA <br />CA 92701 <br />SANTA ANA <br />LIBRARY <br />RENOVATION <br />CITY OF SANTA ANA <br />26 CIVIC CENTER PLAZA <br />SANTA ANA, CA 92701 <br />REV # DESCRIPTION DATE <br />1 BACKCHECK REV-1 03.01.2024 <br />2 CITY REVIEW REV-1 08.02.2024 <br />3 CITY REVIEW REV-2 10.18.2024 <br />4 CITY REVIEW REV-3 01.27.2025 <br />5 CITY REVIEW REV-4 04.07.2025 <br />6 CITY REVIEW REV-5 06.27.2025 <br />7 CITY REVIEW REV-6 10.24.2025 <br /> <br />REVIEWED FOR CONSTRUCTABILITY: <br /> 80470 <br />SEAN THOMAS. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />RECOMMENDED FOR CONSTRUCTION: <br /> 62968 <br />JASON GABRIEL. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />A9.3-1 <br />INTERIOR DETAILS <br />- WINDOWS <br /> 6" = 1'-0"11IDR - AL. DOOR JAMB AT SIDELIGHT <br /> 6" = 1'-0"02 IWI - STOREFRONT HEAD <br /> 6" = 1'-0"03 IWI - STOREFRONT JAMB <br /> 6" = 1'-0"01 IWI - STOREFRONT SILL (FULL HEIGHT) <br /> 6" = 1'-0"07IWI - INTERMEDIATE VERTICAL MULLION AT STOREFRONT <br /> 6" = 1'-0"15IWI - STOREFRONT JAMB WITH WALL STARTER <br /> 6" = 1'-0"06IWI - STROREFRONT INTERSECTION @ PARTITION <br /> 6" = 1'-0"16IWI - NORTH WINDOW HEAD WITH CURTAIN RAIL <br />#030 <br />ASI